05000250/LER-1979-025-03, /0BL-0:on 790807,chemical & Vol Control Sys Holdup Tank Was Ruptured.Caused by Low Internal Tank Pressure.Unit Was Shut Down & Repairs Were Completed

From kanterella
(Redirected from ML17338B121)
Jump to navigation Jump to search
/0BL-0:on 790807,chemical & Vol Control Sys Holdup Tank Was Ruptured.Caused by Low Internal Tank Pressure.Unit Was Shut Down & Repairs Were Completed
ML17338B121
Person / Time
Site: Turkey Point 
Issue date: 09/06/1979
From: Schoppman M
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17338B119 List:
References
LER-79-025-03L-01, LER-79-25-3L-1, NUDOCS 7909270565
Download: ML17338B121 (4)


LER-1979-025, /0BL-0:on 790807,chemical & Vol Control Sys Holdup Tank Was Ruptured.Caused by Low Internal Tank Pressure.Unit Was Shut Down & Repairs Were Completed
Event date:
Report date:
2501979025R03 - NRC Website

text

NRC PORM SSB fl77l LICENSEE EVENT REPORT U. S NUCI.EAR REGULATORY COMMISSION CONTROL BLOCIC:

I I

I I

QI (PLEASE PRINT OR TYPE ALLREQUIRED INPORMATION) 7 5

9 LIC53<$55 COOS 14 2$

UCSHSS HVMSSR 2$

CON'T

~0,1 "sPQRT ~LB 05 P

P PI 2 5IP 7

P 0

5

$0 9 I QQCKKT NUMSSR 49 49 SVSNT OATS EVENT OESCRIPTION ANO PROBABLE CONSEQUENCES QIO

~02 Durin power o eration, the B CKCS holdup tank B

I 6 QB 14 1$

RSPQRT OA< 5 50 was ruptured as a result of low" internal tank pressure.

CVCS holdup tank rupture is discussed in FSAR Section 14.2.2 and would not adversely affect public health and

~ai EIL 9

3 3Qi 0

0 -

0 0101 01

Qi<<

3 3

I Qi~Qs 25 L<CS'ISS TYPS 40

$ 7 CA< Sil 5

safet Similar occurrences have been reported as LER 250-78-17 and 5

LER 250-79-8.

~OB 7

5 9

~OB SYSTS'4l CAUSS CAU55 COMP.

VALVS CQOS COOS 5VSCQQS CCMPONSNT CQOS SVSCQOS SUSCQQS

~0 LJ0 L'JS<~8 BJ<9 EBS 7

5 9

10 11 I'2 12 15 19 20 SSQUSNTIAI OCCURRENCE RSPORT RSVISION'SRIRQ RSPORT NO.

COOS TY PS NO.

G<

REPORT

~79

~

~02 3 'w

~03

~L

~

~0 21 22

'22 29 27

<5 29 20

'1 22 ACTION PUTUR 5

~ 7 4 SCT SHUTQOWN ATTACHMSNT NPROM PRIMS COMP.

CQMPON SNT TAKSN ACTION QN PLANT MSTHQQ

~

HOURS +22 SVSMITTSO PORM SUS.

SV PPLI SR MANUPACTVRSR

~MS< LJS MS<

"s LJS Ls0 MiP ~S 22 25

~

40 41 4'2 42 47 CAUSE OESCRIPTION ANO CORRECTIVE ACTIONS Q27 o

hort te corrective action has been to tern oraril re air the B & C

~I I

CVCS holdu tanks.

Permanent re airs and installation of vacuum reliefs are being effected on the A tank with work to be done serially on B

& C tanks.

The unit was shutdown and repairs were completed to preclude abnormally hot water from being transferred to the holdup tanks.

7 5

9 9ACILITY~

STATUS

~20

~YiQ44 Miami Herald newspaper August 10, 1979 7

5

~ 0<

M. A. Schoppman NRC USE ONLY SS dil

$0 PHOt E (305) 552-3802 It'909 $ 70 5~5

li t

REPORTABLE OCCURRENCE 250-79-25 LICENSEE EVENT REPORT

'PAGE TNO Additional Event Descri tion and Probable Conse uences:

During power operation, the B CVCS holdup tank was ruptured as a result of low internal tank pressure.

The most probable cause of the low internal pressure was condensation of steam inside the tank when a large quantity of relatively cool water from a normal letdown contacted the hot contents of the tank.

The tank temperature was abnormally high due to a previous transfer of hot water from the Unit No.

3 Reactor Coolant Dra'in Tank to the B CVCS holdup tank.

During this occurrence, the cover gas system could not respond rapidly enough to replace the condensed steam.

The tank rupture resulted in a release of a gaseous mixture with a total activ-ity of 5.6 curies; this represents 0.0059% of the quarterly gas release limit.

Tank Data:

13,000 ft3 15 psig internal pressure 200 F

0 psig external pressure

Cv