ML17338A921

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-250/79-05 & 50-251/79-05 on 790501-03.No Noncompliance Noted
ML17338A921
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/29/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17338A923 List:
References
NUDOCS 7907260502
Download: ML17338A921 (4)


See also: IR 05000250/1979005

Text

~4

0

1

~gS 4E0Ij,

o

O

++*++

In Reply Refer To:

RII:EHV

50-250/79"05

50-251/79"05

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3'IOO

ATLANTA,GEORGIA 30303

MAY 2

9

1979

nt gI(Z~

Florida Power and Light Company

Attn:

R. E. Uhrig, Vice President

Advanced

Systems

and Technology

Post Office Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by E. H. Verdery of this office

on May 1-3,

1979 of activities authorized

by NRC License

Nos.

DPR-31

and DPR-41 for the Turkey Point facility, Units 3 and 4,

and to the

discussion of our findings held with H. E. Yaeger at the conclusion of

the inspection.

~

~

~

Areas

examined during the inspection

and our findings are discussed

in

the enclosed

inspection report.

Within these

areas,

the inspection

consisted

of selective

examinations of procedures

and representative

.records,

interviews with personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were

disclosed.

In accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title l0, Code of Federal Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public

Document

Room. If this report contains

any information that you (or

your contractor) believe to be proprietary, it is necessary

that you

make

a written application within 20 days to this office to withhold

such information from public disclosure.

Any such application must

include

a full statement

of the reasons

on the basis of which it is

claimed that the information is proprietary,

and should be prepared

so

that proprietary information identified in the application is contained

in a separate

part of the document.

If we do not hear from you in this

regard within the specified period,

the report will be placed in the

Public Document

Room.

Y

F

Florida Power and Light Company

-2-

MAY 2 9 197S

Should you have

any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

E-c.

R.

C.

is, Acting Chief

Reactor Operations

and

Nuclear Support Branch

Enclosures:

Inspection Report Nos. 50-250/79-05

and 50-251/79-05

cc w/enclosures:

H. E. Yaeger, Plant Manager

Post Office Box 013100

Miami, Florida

33101