Forwards IE Insp Repts 50-250/79-07 & 50-251/79-07 on 790220-23 & Notice of Violation
ML17338A867
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/03/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17338A865 List:
References
NUDOCS 7907240029
Download: ML17338A867 (3)


See also: IR 05000250/1979007

Text

1PR REQy~

tp.

~4

0

4

n

~+

'

a~

n +a*++

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

10'I MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30303

MAY 8

1919

In Reply Refer To:

RII:AHJ

50-250/79"07

50"251/79-07

Florida Power and light Company

ATTN:

R. E. Uhrig, Vice President

P. 0. Box 529100

Miami, Fl

33152

Gentlemen:

This refers to the inspection

conducted

by A. H. Johnson of this office on

February 20-23,

1979, of activities authorized by NRC license

Nos.

DPR-31

and

DPR-41 for the Turkey Point Units 3 and

4 facility, and to the discussion of

our findings held with J.

K. Hays at the conclusion of the inspection.

Areas

examined

during the inspection

and our findings are

discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations

of procedures

and representative

records,

interviews

with personnel,

and observations

by the inspector.

We have

examined actions you have taken with regard to previously identified

enforcement

matters

and

unresolved

items.

The status

of these

items is

discussed in the enclosed report.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements.

This item and references

to pertinent requirements

are listed in the Notice of Violation enclosed here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the

NRC's

"Rules of Practice,"

Part 2, Title 10,

Code of

Federal

Regulations.

Section

2'01 requires

you to submit to this office,

within 20 days of your receipt of this notice,

a written statement

or expla-

nation in reply including:

(1) corrective steps

which have been taken by you

and the results

achieved;

(2) corrective steps

which will be taken to avoid

further noncompliance;

and (3) the date when full compliance will be achieved.

In accordance

with Section 2.790 of the

NRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document

Room. If this

report contains

any information that you (or your contractor) believe to be

proprietary, it is necessary

that you

make

a written application within 20

days to this office to withhold such information from public disclosure.

Any

such application must include

a full statement

of the reasons

on the basis of

which it is claimed that the information is proprietary,

and should be prepared

so that proprietary information identified in the application is contained in

'790'/240 OQ P

P

Florida Power and I,ight Company

NAY 3

1979

a separate

part of the document. If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

Should

you have

any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

E.C,

Richard

.

ewis, Acting Chief

Reactor Operations

and Nuclear

Support Branch

Enclosures:

l.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-250/79-07

and 50-251/79-07

cc w/encl:

H. E. Yaeger, Plant Manager

P. 0.

Box 013100

Miami, FL

33101

4