ML17338A868

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 790220-23
ML17338A868
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/26/1979
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML17338A865 List:
References
50-250-79-07, 50-250-79-7, 50-251-79-07, 50-251-79-7, NUDOCS 7907240065
Download: ML17338A868 (2)


Text

APPENDIX A NOTICE OF VIOLATION Florida Power and Light Company Turkey Point 3 and 4

License Nos.

DPR-31 8 DPR-41 Based on the NRC inspection February 20-23, 1979, certain of your activities were apparently not conducted in full compliance with NRC requirements as indicated below.

These items have been categorized as described in corre-spondence to you dated December 31, 1974.

As required by 10 CFR 50, Appendix B, Criterion IX, measures shall be established to assure that special processes, including welding, heat

treating, and nondestructive testing, are controlled and accomplished by qualified personnel using qualified procedures in accordance with applic-able
codes, standards, specifications,
criteria, and other special requirements.

FPSL Topical equality Assurance Report, Section 9.0 identi-fies leak testing as a special process.

equality Procedure 9.2 requires that personnel performing special processes be certified and certification be maintained current.

Contrary to the above, local leak rate testing during the period of December, 1978 through February 1979 was performed by uncertified personnel.

This is a deficiency.

~

~

0 4