Forwards IE Insp Repts 50-250/79-12 & 50-251/79-12 on 790312-15 & Notice of Violation
ML17338A804
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/20/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17338A802 List:
References
NUDOCS 7906260611
Download: ML17338A804 (4)


See also: IR 05000250/1979012

Text

~R AEONS~

Vp0

nO

C

'+n +w*e+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30303

APR 2

0 1979

In Reply Refer To:

RII:EHV

50-250/79-12

50-251/79"12

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

P. 0.

Box 529100

Miami, FL

33152

Gentlemen:

This refers to the inspection conducted

by E. H. Verdery of this office on

March 12"15,

1979, of activities authorized

by NRC License Nos.

DPR-31 and

DPR-41 for the Turkey Point Units 3 and

4 facility, and to the discussion of

our findings held with H. E. Yaeger at the conclusion of the inspection.

Areas

examined during the inspection

and our findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations

of procedures

and representative

records,

interviews

with personnel,

and observations

by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements.

This item and references

to pertinent requirements

are listed in the Notice of Violation enclosed

here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10,

Code of

Federal Regulations.

Section 2.201 requires

you to submit to this office,

within 20 days of your receipt of this notice,

a written statement

or expla-

nation in reply including:

{1) corrective steps

which have been taken by you

and the results

achieved;

(2) corrective steps

which will be taken to avoid

further noncompliance;

and {3) the date

when full compliance will be achieved.

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part 2,

T'tl

10

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the

NRC s Public Document

Room. If

is

l

th's

t

ontains

any information that you {or your contractor) believe to be

ithin 20

proprietary, it is necessary

that you make

a written application wi

in

days to this office to withhold such information from public disclosure.

Any

such application must include

a full statement

of the reasons

on the basis of

which it is claimed that the information is proprietary,

and should be prepared

so that proprietary information identified in the application is contained in

a separate

part of the document.

If we do not hear

from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

V906 8 6pg/)

(J

gpR 2

0 1979

Florida Power and Light Company

"2-

Should you have any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

Richard

C. Iewis, Ac ing Chief

Reactor Operations

and Nuclear

Support Branch

Enclosure:

l.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-250/79-12

and 50-251/79-12

cc w/encl:

H. E. Yaeger, Plant Manager

P. 0.

Box 013100

Miami, FL

33101