Forwards Insp Repts 50-250/78-30 & 50-251/78-30 on 781205-07 & Notice of Violation
ML17338A470
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/15/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17338A471 List:
References
NUDOCS 7901310129
Download: ML17338A470 (3)


See also: IR 05000250/1978030

Text

e

In

~P,g AE0I '4/p.0

Cy

OO

+a**+

Reply Refer

To,:

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA STREET, N.W.

ATLANTA,GEORGIA 30303

DCC l 5 1978

RII:EHV

50-250/78-30

50-251/78-30

Florida Power and Light Company

Advanced

Systems

and Technology

ATTN:

Dr. R.

E. Uhrig, Vice President

Post Office Box 529100

,

Miami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by Mr. E. H. Verdery of this

office on December 5-7,

1978 of activities authorized

by NRC License

Nos.

DPR-31

and DPR-41 for the Turkey Point, Units 3 and

4 facilities,

and to the discussion of our findings held with Mr. H. E. Yaeger at the

conclusion of the inspection.

Areas

examined during the inspection

and our findings are discussed

in

the enclosed

inspection report.

Within these

areas,

the inspection

consisted

of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observations

by the inspector.

During the inspection, it was

found that certain activities under your

license

appear

to be in noncompliance with NRC requirements.

This item

and references

to pertinent requirements

are listed in the Notice of

Violation enclosed

herewith

as Appendix A.

This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC's "Rules of

Practice," Part 2, Title 10,

Code of Federal Regulations.

Section

2.2Pl'equires

you to submit to this office, within 20 days of your recept of

this notice,

a written statement

or explanation in reply including:

(l=)

corrective steps

which have been taken by you,

and the results

achieved;

(2) corrective steps

which will be taken to avoid further noncompliance;

and (3) the date

when full compliance will be achieved.

In accordance

with Section 2.790 of the

NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public Document

Room.

If this report contains

any information that you (or your contrac-

tor) believe to be proprietary, it is necessary

that you make

a written

application within 20 days to this office to withhold such information

Florida Power and

Light Company

'2"

UL' I 5 1978

from public disclosure.

Any such application must include

a full state-

ment of the reasons

on the basis of which it is claimed that the informa-

tion is proprietary,

and should be prepared

so that proprietary informa-

tion identified in the application is contained in a separate

part of

the document.

If we do not hear from you in this regard within the

specified period,

the report will be placed in the Public Document

Room.

Should you have

any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

F. J.

Long,

C

Reactor Operations

and

Nuclear Support Branch

Enclosures:

l.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-250/78-30

and 50-251/78-30

cc w/enclosures:

Mr. H. E. Yaeger,

Plant Manager

Turkey Point Plant

Post Office Box 013100

9250 West Flagler Street

Miami, Florida

33101