Forwards IE Insp Repts 50-250/78-27 on 781106-09 & Notice of Violation
ML17338A426
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/01/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17338A422 List:
References
NUDOCS 7901170439
Download: ML17338A426 (3)


See also: IR 05000250/1978027

Text

0

0O

I

0

C

lA0

Vj

+a*++

Reply Refer To:

II:EHV

50-250/78-27

50-251/78-27

NUCI,>OR REGULA'TORY CUMMlbSIVN

REGION II

101 MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30303

DEt,'1

1978

Florida Power and Light Company

Advanced

Systems

and Technology

ATTN:

Dr. R. E. Uhrig, Vice President

Post Office Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by Mr. E. H. Verdery of this

office on November 6-9,

1978 of activities authorized by NRC License

Nos.

DPR-31

and DPR-41 for the Turket Point Units 3 and

4 facilities,

and to the discussion of our findings held with Mr. J. K. Hays at the

conclusion of the inspection.

Areas

examined during the inspection

and our findings are discussed

in

the enclosed

inspection report.

Within these

areas,

the inspection

consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the inspectors.

We have

examined actions

you have taken with regard to previously

identified inspection findings.

These

are discussed

in the enclosed

inspection

report.

During the inspection, it was found that certain activities under your

license

appear to be in noncompliance with NRC requirements.

These

items

and references

to pertinent

requirements

are listed in the Notice

of Violation enclosed

herewith

as Appendix A.

This notice is sent to

you pursuant to the provisions of Section 2.201 of the NRC's "Rules of

Practice," Part 2, Title 10,

Code of Federal Regulations.

Section 2.201

requires

you to submit to this office, within 20 days of your receipt of

this notice,

a written statement

or explanation in reply including:

(l)

corrective steps

which have been'aken

by you,

and the results

achieved;

(2) corrective steps

which will be taken to avoid further noncompliance;

and (3) the date

when full compliance will be achieved.

During the inspection it was determined

from a review of operating

logs

and records that the noncompliance identified as Item

B in the Notice of

Violation sent to you with our letter dated February

21,

1978 did occur

as stated in that our followup review failed to disclose additional

information which would change

our finding; therefore,

you are requested

to submit an additional written reply to this office, within 20 days of

your receipt of this letter which provides

the information required by

Section 2.201(a) of )0

CFR 2.

ggogzv6%3g

0

'f f4 $4,1C

~i ~

Florida Power

and

Light Company

[)P~

1

1S78

In accordance

with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public Document

Room. If this report contains

any information that you (or your contrac-

tor) believe to be proprietary, it is necessary

that you make

a written

application within 20 days to this office to withhold such information

from public disclosure.

Any such application must include

a full state-

ment of the reasons

on the basis of which it is claimed that the informa-

tion is proprietary,

and should be prepared

so that proprietary information

identified in the application is contained in a separate

part of the

document.

If we do not hear from you in this regard within the specified

period,

the report will be placed in the Public Document

Room.

Should you have

any questions

concerning this 'letter,

we will be glad to

discuss

them with you.

Sincerely,

F. J. Iong, Chic

Reactor Operations

and

Nuclear Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-250/78-27

and 50-251/78-27

cc w/enclosures:

Mr. H. E. Yaeger,

Plant Manager

Turkey Point Plant

Post Office Box 013100

9250 West Flagler Street

Miami, Florida

33101