UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 101 MARIETTASTREET, N.W.
ATLANTA,GEORGIA 30303 RePort NoeI 50-250/78-27 and 50-251/78-27 Docket No.:
50-250 and 50-251 License NoeI DPR-31 and DPR-41 Licensee:
Florida Power and Light Company P.
O.
Box 023100 9250 West Flagler Street Miami, Florida 33101 Facility Name:
Turkey Point Units 3 and 4
Inspection conducted:
November 6-9, 1978 Inspectors:
E.
H. Verdery S. A. Elrod Approved by:
Z C.
R.
C. Lewis, Chief Reactor Projects Section No.
2 Reactor Operations and Nuclear Support Branch Date Ins ection Summar Ins ection on November 6-9 1978 (Re ort Nos. 50-250/78-27 and 50-251/78-27)
Areas Ins ected:
- Routine, unannounced inspection of plant operations; licensee corrective actions on items of noncompliance; licensee actions on reportable events; tour of accessible plant areas; and follow-up on open and unresolved items.
The inspection involved 64 inspector-hours on-site by two NRC inspectors.
Results:
Of the five areas inspected, no items of noncompliance were found in three areas; two apparent items of noncompliance were found in two areas (infraction - failure to establish and implement housekeeping and removal of combustible materials program (250/78-27-01, 251/78-27-01)
- paragraph I-5a; infraction - failure to conduct gC surveillance as required (250/78-27-02, 251/78-27-02)
- paragraph I-5b).
One previously cited item of noncompliance denied by the licensee was confirmed as noncompliance - paragraph I-6.