ML17338A409

From kanterella
Jump to navigation Jump to search
Forwards IE Inspec Repts 50-250/78-21 & 50-251/78-21 on 780911-15 & Notice of Violation
ML17338A409
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/06/1978
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17338A407 List:
References
NUDOCS 7812280342
Download: ML17338A409 (3)


See also: IR 05000250/1978021

Text

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA STREET, N.W.

ATLANTA,GEORGIA 30303

+~*~4

In Reply Refer To:

RII:DMC

50-250/78"21

50-251/78"21

NOV 06

1978

Florida Power and Light Company

Advanced

Systems

6 Technology

Attn:

Robert E. Uhrig, Vice President

P. 0.

Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by Mr. D. M. Collins of this

office on September

11-15,

1978, of activities authorized by NRC Operating

License Nos.

DPR-31

and DPR-41 for the Turkey Point Units 3 and 4

facilities, and to the discussion of our findings held with Mr. H. E. Yaeger

at the conclusion of the inspection.

Areas

examined during the inspection

and our findings are discussed

in

the enclosed

inspection report.

Within these

areas,

the inspection

consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the inspectors.

We have examined actions you have taken with regard to previously

identified enforcement matters..

These

are discussed in the enclosed

inspection report.

During the inspection, it was found that certain activities under your

license

appear to be in noncompliance with NRC requirements.

These items

and references

to pertinent requirements

are listed in the Notice of

Violation enclosed

herewith as Appendix A.

This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC's "Rules of

Practice," Part 2, Title 10,

Code of Federal Regulations.

Section 2.201

requires

you to submit to this office, within 20 days of your receipt of

this notice,

a written statement

or explanation in reply including:

(1)

corrective steps

which have been taken by you and the results

achieved;

(2) corrective steps

which will be taken to avoid further noncompliance;

and (3) the date

when full compliance will be achieved.

In accordance

with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public Document

Room. If this report contains

any information that you (or your contractor)

7812280 8YA

1

0

Florida Power and Light Company

believe to be proprietary, it is necessary

that you make

a written

application within 20 days to this office to withhold such information

from public disclosure.

Any such application must include

a full statement

of the reasons

on the basis of which it is claimed that the information

is proprietary,

and should be prepared

so that proprietary information

identified in the application is contained in a separate

part of

the'ocument.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document

Room,

Should you have any questions

concerning this letter,

we will be glad

to discuss

them with you.

Sincerely,

J.

T. Sutherland,

Chief

Fuel Facility and Materials

Safety Branch

Enclosures:

l.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-250/78-21

and 50-251/78-21

cc w/encl:

Mr. H. E. Yaeger, Plant Manager

Turkey Point Plant

P. 0. Box 013100

9250 West Flagler Street

Miami, Florida

33101