Forwards IE Inspec Rept 50-250/78-22 & 50-251/78-22 on 780912-15 & Notice of Violation
ML17338A334
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/03/1978
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17338A333 List:
References
NUDOCS 7812050242
Download: ML17338A334 (4)


See also: IR 05000250/1978022

Text

gpss REQQ

0

4O

lv

1

O

4y*y0

In Reply Refer To:

RII:ALC

50-250/78-22

50-251/78-22

J

UNITE D STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30303

NOV 03

1978

Florida Power

and Light Company

Advanced

Systems

and Technology

Attn:

Dr. R. E. Uhrig, Vice President

P. 0.

Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by Mr. A. L. Cunningham of this

office on September

12-15,

1978, of activities authorized

by NRC Operating

License

Nos.

DPR-31

and DPR-41 for the Turkey Point Plant Unit 3 and

4

facilities, and to the discussion of our findings held with Mr. Y. M. Gaafer

at the conclusion of the inspection.

Areas

examined during the inspection

and our findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection consisted

of selective

examinations of procedures

and representative

records, inter-

views with personnel,

and observations

by the inspector.

We have examined actions

you have taken with regard to previously identified

inspection findin'gs.

These

are discussed

in the enclosed

inspection report.

During the inspection it was found that certain activities under your

license

appear to be in noncompliance with NRC requirements.

This item and

references

to pertinent requirements

are listed in the Notice of Violation

enclosed

herewith

as Appendix A.

Corrective actions to prevent recurrence

were completed prior to the Conclusion of this inspection;

therefore,

a

reply is not requested.

In accordance

with Section

2.790 of the NRC's "Rules of Practice," Part 2,-

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document

Room. If

this report contains

any information that you (or your contractor) believe

to be proprietary, it is necessary

that you make

a written application

within 20 days to this office to withhold such information from public

disclosure.

Any such application must include

a full statement

of the

reasons

on the basis of which it is claimed that the information is

proprietary,

and should

be prepared

so that proprietary information

-BOgfg>

HOv

OS

1978

Florida Power

and Light Company

-2-

identified in the application is contained in a separate

part of the

document.

If we do not hear from you in this regard within the specified

period,

the report will be placed in the Public Document

Room.

Should you have

any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

Enclosures:

l.

. Appendix A, Notice

of Violation

2.

Inspection Report Nos.

50-250/78-22

50-251/78-22

J.

T. Sutherland,

Chief

Fuel Facility and Materials

Safety Branch

cc w/encl:

Mr. H. E. Yaeger,

Plant Manager

Turkey Point Plant

P. 0.

Box 013100

9250 West Flagler Street

Miami, Florida

33101

0

Alp

~

L