ML17335A373

From kanterella
Jump to navigation Jump to search
Forwards LER 97-011-02,re Operation Being Outside Design Bases for ECCS & Containment Spray Pumps for Switchover to Recirculation Sump Suction.Commitments Made by Util,Listed
Date released: 05/31/2018 Download: ML17335A373


LER 97-011-02:on 970822,operation Was Noted Outside Design Bases for ECCS & CSP for Switchover to Recirculation Sump Suction.Caused by Ineffective Change Mgt.Revised Procedure for Switchover 01(02) Ohp 4023.ES-1.3
ML17335A374
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/02/1998
From: Farlow S
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
Download: ML17335A374 (7)
Forwards LER 97-011-02,re Operation Being Outside Design Bases for ECCS & Containment Spray Pumps for Switchover to Recirculation Sump Suction.Commitments Made by Util,Listed
ML17335A372
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/02/1998
From: Sampson J
AMERICAN ELECTRIC POWER CO., INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML17335A372 (6)