CATEGORY 1 REGULATOlOINFORMATION DISTRIBUTION LITEM (RIDE)
ACCESSION NBR:9709160323 DOC.DATE: 97/08/31 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 AUTH.NAME AUTHOR AFFILIATION MINOR,J.W.
Indiana Michigan Power Co. (formerly Indiana a Michigan Ele SAMPSON,J.R.
Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Aug 1997 for Donald C Cook Nuclear Plant, Unit 1.W/970908 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
..,TITLE:,Monthly. Operating.-Report.~(per"Tech--Specs)
NOTES:
E RECIPIENT ID CODE/NAME PD3-3 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN3 EXTERNAL: LITCO BRYCEFJ H
NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
~
1 1
1 RECIPIENT ID CODE/NAME HICKMAN,J FILE CENTE '1 OC/ DBA/PAD NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 D
0 E
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.
TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
I
~ g
~
Indiana L'lichtgan Power Company Cook Nuctear Pfant
~
One Cook Place Bridgman, MI49106 U.S. Nuclear ReguIatory Commission ATTN: Document Control Desk Washington, D.C. 20555 September 8, 1997 Gentiemen, Pursuant to the requirements of Donald C. Cook NucIear Plant Unit 1
Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of August 1997 is submitted.
in erely, J.R. Sa son Plant Manager ljc Attachment c:
"NRC Region III D.R. Hahn R.C. Callen S.
Hamming B.
Lewis INPO Records Center ANI Nuclear Engineerin E.E. Fitzpatrick A.A'. Blind P.A. Barrett S.J. Brewer D.W. Paul J.A. Kobyra D.L. Noble W.H. Schalk D.G. Turner B.L. Bartlett g Department LGv"045 9709ih0323 97083l PDR ADQCK 05000315 R
PDR llllllllllllllllllllllllllllllllllllllll
l
~R.C. OPERATING DATAREPORT
~
~
~
DOCKET NO.
50 - 315 DATE September 5, 1997 COMPLETED BY JW Minor TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name
- 2. Reporting Period
- 3. Licensed Thermal Power (MWt)
- 4. Name Plate Rating (Gross MWe)
- 5. Design Electrical Rating (Net MWe)
- 6. Maximum Dependable Capacity (GROSS M
- 7. Maximum Dependable Capacity (Net'MWe)
D. C. Cook Unit1 Aug-97 3250 1152 1020 We) 1056 1000 Notes:
- 8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9.
Power Level To Which Restricted, IfAny (Net Mwe):
- 10. Reasons For Restrictions, IfAny:
- 11. Hours in Reporting Period
- 12. No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Gen. (MWH)
- 17. Gross Electrical Energy Gen. (MWH)
- 18. Net Electrical Energy Gen. (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate This Month 744.0 744.0 0.0 744.0 0.0 2397634.2 778890.0 751831.0 100.0 100.0 101.1 99.1 0.0 Year-to-Date 5832.0 4507.8 0.0 4422.5 0.0 13776913.6 4515740.0 4354961.0 75.8 75.8 74.7 73.2 0.0 Cumulative 198696.0 151095.1 463.0 148631.3 321.0 439581710.6 142815650.0 137406322.0 75.6 75.6 69.0 67.2 5.8
- 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None
- 25. IfShut Down At End of Report Period, Estimated Date of Startup:
None
- 26. Units in Test Status (Prior to Commercial Operation):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved
DOCKET NO.
UNITNAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit1 September 5, 1997 JF Center 616-697-5098 1 of1 MONTHLYOPERATING ACTIVITIES-August 1997 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100% RTP.
The unit exited this reporting period in Mode 1 at 100% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of August was 778890 MWh.
DETAILS"-
8/01/97 08/02/97 8/28/97 8/30/97 1855 2053 0217 1035 1008 1445 0300 1300 Commenced Reactor power reduction for Main Turbine Control Valve testing.
Reator power stabilized at 92% RTP.
Commenced Reactor power ascension following completion of testing.
Reactor power stablized at 100% RTP.
Commenced Reactor power reduction due to thermal condition in Lake Michigan and a minor instrument adjustment.
Reator power stabilized at 90.5% RTP.
Commenced Reactor power ascension following completion of adjustment and change in lake temperature.
Reactor power stablized at 100% RTP.
Alltimes are in Eastern Standard Time (EST).
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50 - 315 D.C. Cook,Unit 1 September 5, 1997 JW Minor 616465-5901 AVERAGE DAILYPOWER LEVEL (lNWe-Net)
August 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 8/1/97 8/2/97 8/3/97 8/4/97 8/5/97 8/6/97 8/7/97 8/8/97 8/9/97 8/10/97 8/11/97 8/12/97 8/13/97 8/14/97 8/15/97 8/16/97 1001 998 1009 1016 1029 1024 1012 1013 1015 1014 1017 1019 1024 1028 1021 1021 8/17/97 8/1 8/97 8/1 9/97 8/20/97 8/21/97 8/22/97 8/23/97 8/24/97 8/25/97 8/26/97 8/27/97 8/28/97 8/29/97 8/30/97 8/31/97 1016 1016 1019 1018 1020 1026 1022 1018 1018 1017 1014 972 914 966 1012
DOCKET NO.
UNITNAME DATE COMPLETED BY TELEPHONE PAGE 50- 315 D.C. Cook Unit 1(
September 5, 199'7 -'.
JF Center 616497-5098 1 of1 UNITSHUTDOWNS AND POWER REDUCTIONS - August 1997 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.
DATE TYPE" HOURS REASON2 REACTOR3 REPORT NO.
CODE4 CODE5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE None There were no unit shutdowns or significant power reductions this month.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT: