CATEGORY 1 REGULATOINFORMATION DISTRIBUTION TEM (RIDE)
ACCESSION NBR:9708140253 DOC.DATE: 97/07/31 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 AUTH.NAME AUTHOR AFFILIATION MINOR,J.W.
American Electric Power Co., Inc.
CENTER,J.F.
American Electric Power Co., Inc.
SAMPSON,J.R.
American Electr'ic Power Co., Inc.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Jul 1997 for DC Cook Nuclear Plant, Unit 1.W/970807 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD3-3 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN3 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME HICKMANFJ FILE C COPIES LTTR ENCL 1
1 1
1 1
1 EXTERNAL: LITCO BRYCE,J H
NRC PDR 1
1 1
1 NOAC 1
1 NOTE TO ALL MRIDSM RECIPIENTS:
PLEASE HELP US TO REDUCE WASTETH CONTACT 'THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
m S
i,
Indiana I'Iichigan Power Company Cook Nuclear Plant One Cook Place Bridgman, MI49106 U.S. Nuclear Regulatory Commission ATlN: Document Control Desk Washington, D.C. 20555 August 7, 1997 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1
Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of July 1997 is submitted.
Sincerely, J.R. Sampson Plant Manager
/jc Attachment NRC Region III D.R. Hahn R.C. Gal!en S. 'Hamming B.
Lewis INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett S.J. Brewer D.W. Paul J.A. Kobyra D.L. Noble W.H. Schalk D.G. Turner B.L. Bartlett
.M.E. Russo 9708i40253 97073i PDR ADOCK 05000315
$ 300bl II!II!Ill!fill!IIII!Illllilll!
IIIIIII
~
~
~
~R.C. OPERATING DATAREPORT DOCKET NO.
DATE COMPLETED BY TELEPHONE 50- 315 August 4, 1997 JW Minor 616-465-5901 OPERATING STATUS
- 1. Unit Name
- 2. Reporting Period
- 3. Licensed Thermal Power (MWt)
- 4. Name Plate Rating (Gross MWe)
- 5. Design Electrical Rating (Net MWe)
- 6. Maximum Dependable Capacity (GROSS M
- 7. Maximum Dependable Capacity (Net MWe)
D. C. Cook Unit1 Jul-97 3250 1152 1020 We) 1056 1000 Notes:
- 8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9.
Power Level To Which Restricted, IfAny (Net Mwe):
- 10. Reasons For Restrictions, IfAny:
- 11. Hours in Reporting Period
- 12. No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Gen. (MWH)
- 17. Gross Electrical Energy Gen. (MWH)
- 18. Net Electrical Energy Gen. (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate This Month 744.0 744.0 0.0 744.0 0.0 2412493.2 785950.0(
758775.0 100.0 100.0 102.0 100.0 0.0 Year-to-Date 5088.0 3763.8 0.0 3678.5 0.0 11379279.4 3736850.0 3603130.0 72.3 72.3 70.8 69.4 0.0 Cumulative 197952.0 150351.1 463.0 147887.3 321.0 437184076.4 142036760.0 136654491.0 75.5 75.5 68.9 67.1 5.8
- 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None
- 25. IfShut Down At End of Report Period, Estimated Date of Startup:
None
- 26. Units in Test Status (Prior to Commercial Operation):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved
1 DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50- 315 D.C. Cook Unit1 August 4, 1997 JW Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
JULY 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 7/1/97 7/2/97 7/3/97 7/4/97 7/5/97 7/6/97 7/7/97 7/8/97 7/9/97 7/10/97 7/1 1/97 7/12/97 7/13/97 7/14/97 7/15/97 7/1 6/97 1019 1018 1015 1002 1010 1019 1022 1034 1019 1027 1024 1024 1020 1021 1009 1012 7/1 7/97 7/1 8/97 7/1 9/97 7/20/97 7/21/97 7/22/97 7/23/97 7/24/97 7/25/97 7/26/97 7/27/97 7/28/97 7/29/97 7/30/97 7/31/97 1008 1007 1009 1015 1016 1026 1032 1036 1029 1019 1018 1012 1033 1036 1030
I DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 315 D.C. Cook Unit1 August 5, 1997 JF Center 616-697-5098 1 of1 MONTHLYOPERATING ACTIVITIES-JULY 1997 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100% RTP.
The unit exited this reporting period in Mode 1 at 100% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of July was 785950 MWh.
DETAILS-07-04-97 07-05-97 1825 Commenced Reactor power reduction to conduct Main Turbine control valve testing.
2020 Reactor power stablized at 91.5% RTP.
2345 Main Turbine control valve testing completed.
Commenced Reactor power ascension.
0315 Reactor power stablized at 100% RTP.
Alltimes are in Eastern Standard Time (EST).
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 315 D.C. Cook Unit 1-August 5, 1997 JF Center 616-697-5098 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - JULY 1997 METHOD OF SHUTI'ING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.
DATE TYPE" HOURS REASON2 REACTOR3 REPORT NO.
CODE CODE CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE None There were no unit shutdowns or significant power reductions this month.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source