ML17333A779
| ML17333A779 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 01/31/1997 |
| From: | Minor J, Russo M, Sampson J AMERICAN ELECTRIC POWER CO., INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9702120368 | |
| Download: ML17333A779 (8) | |
Text
CATEGORY j REGULAT INFORMATION DISTRIBUTION STEM (RIDS)
AC('ESSION, NBR, 9702120368
'DOC.DATE: 97/01/31 NOTARIZED:
NO DOCKET FACZL:5'0;316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION RUSSO,ME'merican Electric Power Co., Inc.
MINOR,JW American Electric Power Co., Inc.
SAMPSON,J.R.
American Electric Power Co., Inc.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Jan 1996 for Donald C.Cook Nuclear Plant, Unit 2.W/970204 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD3-3 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN3 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME HICKMAN,J ILE CENTER 1
1 1
1 1
1 EXTERNAL: LITCO BRYCE,J H
NRC PDR 1
1 1
1 NOAC 1
1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL
. '10
American Electric Cook Nuclear Plant One Cook Place Bndgman, Ml 49106 616 465 5901 February 4, 1997 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D.C. 20555 Gentlemen:
Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of January 1997 is submitted.
Respectfully, Q4 J.R. Sampson Plant Manager Attachment c:
NRC Region III D.R. Hahn R.C. Callen S.
Hamming INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett S.J. Brewer D.W. Paul J.A. Kobyra D.L. Noble W.H. Schalk D.G. Turner B.L. Bartlett M.E. Russo 9702i20368 'P70i3i
'v;PDR 'P,ADQCK 050003i6
'R PDR r
I l'>
~~,gs
},>
, L
t t
N.R.C. OPERATING DATA REPORT DOCKET NO.
50 - 316 DATE Feb..4, 1997 COMPLETED BY JW Minor TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name
- 2. Reporting Period
- 3. Licensed Thermal Power (MWt)
- 4. Name Plate Rating (Gross MWe)
- 5. Design Electrical Rating (Net MWe)
- 6. Maximum Dependable Capacity (GROSS M
- 7. Maximum Dependable Capacity (Net MWe)
D. C. Cook Unit 2 Jan-97 3411 1133 1090 We) 1100 1060 Notes:
- 8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9.
Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
- 11. Hours in Reporting Period
- 12. No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Gen. (MWH)
- 17. Gross Electrical Energy Gen. (MWH)
- 18. Net Electrical Energy Gen. (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate This Month 744.0 744.0 0.0 744.0 0.0 2413989.3 794520.0 768100.0 100.0 100.0 97.4 94.7 0.0 Year-to-Date 744.0 744.0 0.0 744.0 0.0 2413989.3 794520.0 768100.0 100.0 1'00.0 97.4 94.7 0.0 Cumulative 167304.0 116755.9 0.0 113191.6 0.0 349592256.3 113298910.0 109150666.0 68.7 68.7 62.4 60.7 14.1
- 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None
- 25. IfShut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50- 316 D.C. Cook Unit 2 Feb. 4, 1997 JW Minor 616465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
JANUARY1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1/1/97 1/2/97 1/3/97 1/4/97 1/5/97 1/6/97 1/7/97 1/8/97 1/9/97 1/10/97 1/11/97 1/12/97 1/13/97 1/14/97 1/15/97 1/16/97 932 533 574 1047 1081 1085 1082 1075 1070 1068 743 963 1093 1091 1097 1091 1/17/97 1/18/97 1/19/97 1/20/97 1/21/97 1/22/97 1/23/97 1/24/97 1/25/97 1/26/97 1/27/97 1/28/97 1/29/97 1/30/97 1/31/97 1086 1086 1086 1083 1093 1096 1094 1095 1093 1095 1094 1096 1093 1095 1095
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 Feb. 4, 1997 ME Russo 616-697-5100 1 of2 MONTHLYOPERATING ACTIVITIES-JANUARY1997 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100% RTP.
Reactor power was reduced to 55% RTP on January 1 to facilitate Main Feedpump control repairs.
The unit was restored to 100% RTP on January 4 at 0530.
Reactor power was reduced to 70% RTP on January 10 to facilitate planned Steam Generator Stop Valve Dump Valve testing. The unit was restored to 100% RTP on January 12 at 1440.
The unit exited this reporting period in Mode 1 at 100% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of January was 794520 MWH.
DETAILS 01-01-97 01-02-97 0840 0925 2023 0030 1050 Main Feedpump differential pressure controller failure. Commenced rapid power reduction.
Reactor power stabilized at 84% RTP.
Commenced Reactor power reduction to facilitate Main Feedpump control repairs.
Reactor power stabilized at 55% RTP.
Commenced Reactor power reduction to facilitate Nuclear Instrumentation calibration.
01-03-97 01-04-97 01-10-97 01-11-97 01-12-97 1136 1551 0530 2102 0241 0400 1440 Reactor power stabilized at 52% RTP.
Commenced Reactor power ascension.
Reactor power stabilized at 100% RTP.
Commenced Reactor power reduction to facilitate planned Steam Generator Stop Valve Dump Valve testing.
Reactor power stabilized at 70% RTP.
Commenced Reactor power ascension.
Reactor power stabilized at 100% RTP.
DETAILS (cont'd)
DOCKS 0
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 Feb. 4, 1997 ME Russo 616-697-5100 2 of,2, 01-20-97 0855 0932 1130 1315 Commenced Reactor power reduction due to a potential problem with a Main Feedpump lube oil trip pressure switch.
Reactor power reduction halted at 95% RTP following pressure switch defeat.
Commenced Reactor power ascension.
Reactor power stabilized at 100% RTP.
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE
'I 50 - 316 D.C. Cook Unit2'-
Feb. 4, 1997 ME Russo 616-697-5100 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - JANUARY1997 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.
DATE TYPE" HOURS REASON2 REACTOR3 REPORT NO.
CODE4 CODE5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 253 010197 F
N/A A
N/A NIA JK FC Reactor power was reduced to 55% RTP 010297 at 0030 to facilitate Main Feedpump control repairs following a controller failure 010197 at 0840. The unit was restored to 100%
RTP 010497 at 0530.
254 011097 S
N/A N/A N/A NIA NIA Reactor power was reduced to 70% RTP 011097 to facilitate planned Steam Generator Stop Valve Dump Valve testing. The unit was restored to 100% RTP 011297 at 1440.
1 F: Forced S: Scheduled 2
Reason:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (ExpIain)
H: Other (Explain) 3 Method:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 Exhibit I: Same Source