Monthly Operating Rept for Dec 1996 for DC Cook Nuclear Plant Unit 1.W/970103 Ltr
ML17333A731
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/31/1996
From: Minor J, Russo M, Sampson J
AMERICAN ELECTRIC POWER CO., INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9701140216
Download: ML17333A731 (7)


Text

REGULAT INFORMATION DISTRIBUTIO ZSTEM (RIDS)

ACCESSION NBR:9701140216 DOC;DATE: 96/12/31 NOTARIZED: NO DOCKET ¹ FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH. NAME AUTHOR AFFILIATION MINOR,J.W. American Electric Power Co., Inc.

RUSSO,M.E. American Electr.ic Power Co., Inc.

SAMPSON,J.R. American Electric Power Co., Inc.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Dec 1996 for DC Cook Nuclear Plant Unit 1.W/970103 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-3 PD 1 1 HICKMAN,J 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 NTER 1 1 NRR/DRPM/PECB 1 1 OC 1 1 RGN3 1 1 EXTERNAL: LITCO BRYCEgJ H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

~

I American Electric Cook Nuclear Plant One Cook Place Bndgman, Ml 49106 616 465 5901 January 3, 1-997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of December 1996 is submitted.

Respectfully, J.RE Sampson Plant Manager Attachment NRC Region III D. R. Hahn R.C. Callen S. Hamming INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett S.J. Brewer D.W. Paul J.A. Kobyra D.L. Noble W. H. Schalk D.G. Turner B.L. Bartlett M.E. Russo 9701140216 961231 R,Vl/V'<

1 PDR ADOCK 05000315

~ ~

PDR J

N.R.C. OPERATING DATA REPORT DOCKET NO. 50"315 DATE 03/Jan/97 COMPLETED BYJohn W. Minor.

TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 1

'2. Reporting Period DEC/96 notes

3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity (GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions. If Any:

This Mo. Yr. to Date Cumm.

11. Hours in Reporting Period 744.0 8784.0 192864.0
12. No. of Hrs. Reactor Was Critical 744.0 8595.0 146587.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 463. 0
14. Hours Generator on Line 744. 0 8574.7 i144208.8
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Therm. Energy Gen. (MWH) 2272187 26386917 425804797
17. Gross Elect. Energy Gen. (MWH) 753100 8687540 138299910
18. Net Elect., Energy Gen. (MWH) 726063 8373262 133051361
19. Unit Service Factor 100.0 97.6 75.6
20. Unit Availability Factor 100.0 97.6 75.6
21. Unit Capacity Factor (MDC Net) 97.6 95.3 68.8
22. Unit Capacity Factor (DER Net) 95.7 93.5 67.1
23. Unit Forced Outage Rate 0.0 2.4 6.0
24. Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):

Refue in outa e to be in Februar 28 19 7 for an estimated duration of 48 days.

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO. 50-315 UNIT ONE DATE 03/Jan/97 COMPLETED BYJohn W. Minor TELEPHONE 616-465-5901 MONTH DEC/96 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 96/12/01 972 96/12/17 981 96/12/02 972 96/12/18 983 96/12/03 974 96/12/19 979 96/12/04 973 96/12/20 983 96/12/05 972 96/12/21 981 96/12/06 972 96/12/22 979 96/12/07 974 96/12/23 976 96/12/08 972 96/12/24 978 96/12/09 970 96/12/25 979 96/12/10 975 96/12/26 974 96/12/11 971 96/12/27 977 96/12/12 973 96/12/28 971 96/12/13 972 96/12/29 976 96/12/14 975 96/12/30 977 96/12/15 982 96/12/31 977 96/12/16 984

~

~ J

~ ~

DOCKET NO: 50-315 UNIT NAME: D.C. Cook Unit 1 COMPLETED BY: M.E. Russo TELEPHONE: 616-697-5100 DATE: January 3, 1997 PAGE: Page 1 of 1 MONTHLY OPERATING ACTIVITIES DECEMBER 1996 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 93.5% RTP.

Only minor adjustments to reactor power were experienced as a result of Main Turbine control valve testing and Main Transformer operating limitations The unit exited this reporting period in Mode 1 at 94% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of December was 753100 MWH.

DETAILS 12-13-96 2010 Commenced power reduction to facilitate Main Turbine control valve testing.

2300 Reactor power stabilized at 92% RTP.

2320 Commenced testing.

12-14-96 0200 Completed testing. Commenced power ascension.

0428 Reactor power stabilized at 93.7% RTP.

1030 Commenced power ascension to reduce Main Transformer operating limit margin.

1500 Reactor power stabilized at 94.7% RTP.

12-23-96 1825 Commenced power reduction due to Main Transformer operating limitations.

1855 Reactor power stabilized at 93.7% RTP.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-315 UNIT NAME: D.C. COOK UNIT 1 REPORT MONTH: DECEMBER 1996 DATE: January 3, 1997 .

COMPLETED BY: M.E. Russo TELEPHONE: 616-697-5100 PAGE: Page 1 of 1 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE HOURS REASON REACTOR REPORT NO. CODE CODE TO PREVENT RECURRENCE None There were no unit shutdowns or significant power reductions this month.

1 2 3 4 5 F: Forced Reason: Method: Exhibit G Instructions Exhibit 1: Same S: Scheduled A: Equipment Failure (Explain) 1: Manual for preparation of data Source B: Maintenance or Test 2: Manual Scram entry sheets for Licensee C: Refueling 3: Automatic Scram Event Report (LER) File D: Regulatory Restriction 4: Other (Explain) (NUREG 0161)

E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)