N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-316 DATE 03/Dec/96 COMPLETED BYJohn W. Minor TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit 2
- 2. Reporting Period NOV/96
- 3. Licensed Thermal Power (MWt) 3411 4.
Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090 6.
Maximum Dependable Capacity (GROSS MWe) 1100 7.
Maximum Dependable Capacity (Net MWe) 1060 notes
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through
- 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
11.
Hours in Reporting Period 12.
No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 14.
Hours Generator on Line
- 15. Unit Reserve Shutdown Hours 16.
Gross Therm.
Energy Gen.
(MWH) 17.
Gross Elect.
Energy Gen.
(MWH)
- 18. Net Elect.
Energy Gen.
(MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate 24.
Shutdowns Scheduled over Next Six None This Mo.
Yr. to Date 720.0 8040.0 720.0
'943.6 0.0 0.0 720.0 6897.9 0.0 0.0 2370397 23008721 780340 7457800 754500 7209246 100.0 85.8 100.0 85.8 98.9 84.6 96.1 82 '
0.0 0.2 Months (Type, Date,and Cumm.
165816.0 115267.9 0.0 111703.6 0.0 344643185 111664160 107569209 68.4 68.4 62.0 60.4 14.3 Duration):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 96i2ih0326 9hi203 PDR ADOCK 050003ih R
~
~
AVERAGE DAILY POWER LEVEL (MWe-Net)
MONTH DOCKET NO.
50-316 UNIT TWO DATE
'3/Dec/96 COMPLETED BYJohn W., Minor TELEPHONE 616-465-5901 NOV/96 DAY 96/11/01 96/11/02 96/11/03 96/11/04 96/11/05 96/11/06 96/11/07 96/11/08 96/11/09 96/11/10 96/11/11 96/11/12 96/11/13 96/11/14 96/11/15 96/ll/16 AVERAGE DAILY POWER LEVEL 1088 1086 1088 1087 1085 1086 1087 1086 1087 1088 1092 1090 1087-1089 1093 1088 DAY 96/11/17 96/11/18 96/11/19 96/11/20 96/11/21 96/11/22 96/11/23 96/11/24 96/11/25 96/11/26 96/11/27 96/11/28 96/11/29 96/11/30 AVERAGE DAILY POWER LEVEL 1093 1094 1091 1093 1092 984 330 721 1093 1086 1091 1094 1085 1085
DOCKET NO:
50-316 UNIT NAME:
D.C.
Cook Unit 2 COMPLETED BY:
M.E. Russo TELEPHONE:
616-697-5100 DATE:
December 3,
1996 PAGE:
Page 1 of 1
MONTHLY OPERATING ACTIVITIES NOVEMBER 1996 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100%
RTP.
Reactor power was reduced to 30%
RTP November 23 at 0404 for a planned oil addition to ¹3 Reactor Coolant Pump.
Reactor power was restored to 100%
RTP November 24 at 2056.
The unit exited this reporting period in Mode 1 at 100%
RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of November was 780340 MWH.
DETAILS 11-22-96 11-23-96 11-24-96 1540 0404 1340 1750 0446 0507 0715 2056 Commenced power reduction to 30%
RTP for a planned oil addition to ¹3 Reactor Coolant Pump.
Reactor power stabilized at 30%
RTP.
Commenced power ascension.
Reactor power stabilized at 47%
RTP.
Commenced power ascension.
Reactor power stabilized at 48.5%
RTP.
Commenced power ascension.
Reactor power stabilized at 100%
RTP;
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: NOVEMBER 1996 DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
PAGE:
50-316 D.C.
COOK UNIT 2 December 3,
1996 M.E. Russo 616-697-5100 Page 1 OF 1
DURATION NO.
DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON REACTOR REPORT NO.
CODE CODE TO PREVENT RECURRENCE 252 112296 S
N/A N/A N/A N/A N/A Reactor power was reduced to 30%
RT 112396 at 0404 for a planned oil addition to
$ 3 Reactor Coolant Pump.
Reactor power was stabilized at 100%
RTP 112496 at 2056.
1 F:
Forced S:
Scheduled F
G:
H:
2 Reason:
A:
Equipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and License Examination Administrative Operational Error (Explain)
Other (Explain) 3 Method:
1:
Manual 2:
Manual Scram 3:
Other (Explain)
Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5Exhibit I:
Same Source