ML17333A706

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1996 for Donald C. Cook Nuclear Plant Unit 2
ML17333A706
Person / Time
Site: Cook 
Issue date: 10/31/1996
From: Minor J
AMERICAN ELECTRIC POWER CO., INC.
To:
Shared Package
ML17333A703 List:
References
NUDOCS 9612160330
Download: ML17333A706 (2)


Text

N.R.CD OPERATING DATA REPORT DOCKET NO.

50-316 DATE 15/Nov/96 COMPLETED BYJohn W. Minor TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 2

2. Reporting Period OCT/96
3. Licensed Thermal Power (MWt) 3411 4.

Name Plate Rating (Gross MWe) 1133

5. Design Electrical Rating (Net MWe) 1090 6.

Maximum Dependable Capacity (GROSS MWe) 1100 7.

Maximum Dependable Capacity (Net MWe) 1060 notes

8. If Changes Occur in Capacity Ratings (Items no.

3 through

7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

11.

Hours in Reporting Period 12.

No. of Hrs. Reactor Was Critical

13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Therm.

Energy Gen.

(MWH) 17.

Gross Elect.

Energy Gen.

(MWH) 18.

Net Elect.

Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Six None This Mo.

Yr. to Date 744.0 7320.0 744.0 6223.6 0.0 0.0 744.0 6177.9 0.0 0.0 2531841 20638324 822460 6677460 795646 6454746 100.0 84.4 100.0 84.4 100.9 83.2 98.1 80.9 0.0 0.2 Months (Type, Date,and Cumm.

165096.0 114547.9 0.0 110983.6 0.0 342272788 110883820 106814709 68.2 68.2 61.8 60.2 14.4 Duration):

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial, Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 9bi2ib0330 9bi203 PDR ADOCK 0500031b R

PDR

te

~