ML17333A559
| ML17333A559 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 08/31/1996 |
| From: | Janisse J, Minor J, Sampson J AMERICAN ELECTRIC POWER CO., INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9609170608 | |
| Download: ML17333A559 (8) | |
Text
CATEGORY 1 p,
REGULA'<<I INFORMATION DISTRIBUTIOYSTEM (RIDE)
C i< ACCESSION NBR:9609170608 DOC,.DATE: 96/08/31 NOTARIZED:
NO DOCKET I FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 AUTH.NAME AUTHOR AFFILIATION MINOR,J.W.
American Electric Power Co., Inc.
JANISSE,J.D.
American Electric Power Co., Inc.
SAMPSON,J.R.
American Electric Power Co., Inc.
RECIP.INAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Aug 1996 for DC Cook Nuclear Plant Unit 1.W/960904 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAL: LITCO BRYCE,J H
NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME HICKMAN,J FILE CENTER 1
GN9 NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 D
U E
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL 9
/
gP I C
American ElectricP~
Cook Nuclear Plant One Cook Place Bfidgman, Ml49106 616 465 5901 September 4,
1996 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit' Technical Specification 6.9.1.10, the attached Monthly, Operating Report for the month of August 1996 is submitted.
spectfully, J.R.
S son Plant Manager Attachment c:
NRC Region III D.R.
Hahn R.C. Callen S.
Hamming INPO Records Center ANI Nuclear Engineering Department E.ED Fitzpatrick A.A. Blind P.A. Barrett W.G. Smith, Jr.
S.J.
Brewer D.W. Paul S.H. Steinhart DE L. Noble W. H. Schalk D. G. Turner B.LE Bartlett M.E.
Russo g~/i 9609i70608 96083i t
PDR.
ADQCK 050003i5 R'DR
I.
~
. ~
'I l
i, 4
I'
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-315 DATE 04/Sep/96 COMPLETED BY JW Minor TELEPHONE 616-465-5901 OPERATING STATUS 1
~ Unit Name D.
C.
Cook Unit 1
- 2. Reporting Period August 1996
- 3. Licensed Thermal Power (MWt) 3250 4.
Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1020 6.
Maximum Dependable Capacity (GROSS MWe) 1056 7.
Maximum Dependable Capacity (Net MWe) 1000 notes
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through
- 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
Hours in Reporting Period No. of Hrs. Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator on Line Unit Reserve Shutdown Hours Gross Therm.
Energy Gen.
(MWH)
Gross Elect.
Energy Gen.
(MWH)
Net Elect. Energy Gen.
(MWH)
Unit Service Factor Unit Availability Factor Unit,Capacity Factor (MDC Net)
Unit Capacity Factor (DER Net)
Unit Forced Outage Rate Shutdowns Scheduled over Next Six None This Mo.
Yr. to Date 744.0 5856.0 744.0 5834.1 0.0 0.0 744.0 5820.0 0.0 0.0 2066282 18306413 670760 6023940 643802 5809698 100.0 99.4 100.0 99.4 86.5 99.2 84.8 97.3 0.0 0.6 Months (Type, Date,and Cumm.
189936 '
143826.4 463.0 141454.1 321.0 417724294 135636310 130487797 75.3 75.3 68.5 66.8
6.0 Duration)
- 25. If Shut. Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
50-315 UNIT ONE DATE 04/Sep/96 COMPLETED BY JD JANISSE TELEPHONE 616-465-5901 MONTH August 1996 DAY 96/08/01 96/08/02 96/08/03 96/08/04 96/08/05 96/08/06 96/08/07 96/08/08 96/08/09 96/08/10 96/08/11 96/08/12 96/08/13 96/08/14 96/08/15 96/08/16 AVERAGE DAILY POWER LEVEL 895 890 892 866 857 846 841 839 846 861 875 877 874 869 851 858 DAY 96/08/17 96/08/18 96/08/19 96/08/20 96/08/21 96/08/22 96/08/23 96/08/24 96/08/25 96/08/26 96/08/27 96/08/28 96/08/29 96/08/30 96/08/31 AVERAGE DAILY POWER LEVEL 867 866 856 853 850 849 856 876 874 870 872 873 874 874 881
DOCKET NO:
50-315 UNIT NAME:
D.C.
Cook Unit 1 COMPLETED BY:
616-697-5100 DATE:
September 4,
1996 PAGE:
Page 1 of 1
MONTHLY OPERATING ACTIVITIES AUGUST 1996 HIGHLIGHTS*
The unit entered this reporting period in Mode 1 and stable at 88.5%
RTP.
Reactor power was decreased on separate occasions to no less than 84%
RTP due to Main Transformer thermal limitations as a result of increased ambient temperature conditions.
The unit exited this reporting period in Mode 1 at 86%
RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of August was 670760 MWH.
DETAILS*
08-03-96 1236 Commenced power reduction due to Main Transformer thermal limitations.
08-05-96 1330 1250 Reactor power stabilized at 86.5%
RTP.
Commenced power reduction due to Main Transformer thermal limitations'8-09-96 08-31-96 1515 2137 2246 0900 1100 Reactor power stabilized at 84.6%
RTP.
Commenced Main Turbine control valve testing.
Completed Main Turbine control valve testing.
Commenced power ascension to 86%
RTP.
Reactor power stabilized at 86%
RTP.
- All time entries above are Eastern Standard Time (EST).
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: AUGUST 1996 DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
PAGE:
50-315 D.C.
COOK UNIT 1 September 4,
1996 M.E.
Russo 616-697-5100 Page 1 of 1 DURATION NO.
DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT REASONS REACTOR~
REPORT NO CODE'ODEs CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE None There were no unit shutdowns or significant power reductions from 100%
RTP this month.
1 F:
Forced S:
Scheduled 2
Reason:
A:
Equipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and License Examination F:
Administrative G:
Operational Error (Explain)
H:
Other (Explain) 3 Method:
1:
Manual 2:
Manual Scram 3:
Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5Exhibit I:
Same Source