ML17333A541

From kanterella
Jump to navigation Jump to search
Amends 211 & 196 to Licenses DPR-58 & DPR-74,modifying TS to Delete SR Demonstrating Operability of Emergency Power Supply for Pressurizer Power Operated Relief Valves & Block Valves
ML17333A541
Person / Time
Site: Cook  
Issue date: 08/15/1996
From: John Hickman
NRC (Affiliation Not Assigned)
To:
Shared Package
ML17333A542 List:
References
NUDOCS 9608210176
Download: ML17333A541 (15)


Text

gP,R RE00

~o Cy ClO p

~O

+a*++

UNITED STATES NUCLEAR REGULATORY COMMISSlON WASHINGTON, D.C. 20555-0001 INDIANA M C

GAN POWER COMPANY OC

0. 50-3 5

ONALD C.

COOK UC P ANT UN T 0

ENDMENT TO FAC ITY OP RATING LICENSE Amendment No. >>>

License No.

DPR-58 The Nuclear Regulatory Commission (the Commission) has found that:

A.

B.

C.

D.

E.

The application for amendment by Indiana Michigan Power Company (the licensee) dated January 12,

1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; The facility will oper ate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

96082iOi76 9608i5 PDR ADOCK 050003i5 P

PDR

J

'Ip

2.

Accordingly, the license is amended by changes to the Technica'i Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No.

DPR-58 is hereby amended to read as follows:

echnical S ecificat ons 3.

The Technical Specifications contained in Appendices A and B, as revised through Amendment No.

211

, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

This license amendment is effective as of the date of issuance, with full implementation within 45 days.

FOR THE NUCLEAR REGULATORY COMMISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

August 15, 1996 John B. Hickman, Project Manager Project Directorate III-I Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation

TTACHHENT TO LICENSE AHENDHENT NO.

211 TO FACILITY OPERATING LIC NSE NO.

DPR-58 DOCKET NO. 50-315 Revise Appendix A Technical Specifications by removing the pages identified below and inserting the attached pages.

The revised pages are identified by amendment number and contain vertical lines indicating the area of change.

REHOVE 3/4 4-36 INSERT 3/4 4-36

t t

3/4 LIMITINGCONDITIONS FOR OPERATION ANDSURVEILLANCEREQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM LIMITINGCONDITION FOR OPERATION (Continued) g.

With PORVs and block valves not in the same line inoperable due to causes other than excessive seat leakage, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore the valves to OPERABLE status or close and de~crgize the associated block valve and place the associated PORV in manual control in each respcctivc line. Apply the portions of ACTION c or d above, relating to the OPERATIONALMODE, as appropriate for two or three lines unavailable.

h.

The provisions of Specification 3.0.4 are not applicable.

SURVEILLANCERE UIREMENTS 4A.11.1 In addition to the requirements of Specification 4.0.5, each PORV shall be demonstrated OPERABLE:

At least once per 31 days by performance of a CHANNEL FUNCTIONALTEST, excluding valve operation, and At least once per 18 months by operating the PORV through one complete cycle of full travel during MODES 3 or 4, and C.

At least once per 18 months by operating solenoid air control valves and check valves in PORV control systems through one complete cycle of full travel, and d.

At least once per 18 months by performing a CHANNEL CALIBRATIONof the actuation instrumentation.

4A.11.2 Each block valve shall be demonstrated OPERABLE at least once per 92 days by operating the valve through one complete cycle of full travel unless the block valve is closed in order to meet the requirements of ACTION b, c, or d in Specification 3.4.11.

4.4.112 Deleted.

COOK NUCLEAR PLANT-UNITI Page 3/4 4-36 AMENDMENT444, 468,~ 211

JI tJ

'gS RE0Ij P

~

~4 0

Cy no lA0

+

~O

+**++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&4001 INDIANA M CHIGAN POW R

COMPANY OC ET NO. 50-6 ONALD C.

COOK UC EAR P ANT UNIT NO.

2 AMENDMENT TO FACI ITY OPERATING LICENSE Amendment No. 196 License No.

DPR-74 l.

The nuclear Regulatory Commission (the Commission) has found that:

A.

B.

C.

D.

The application for amendment by Indiana Michigan Power Company (the licensee) dated January 12,

1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health

.and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-74 is hereby amended to read as follows:

ec nical S ecific ti s

3.

The Technical. Specifications contained in Appendices A and B,

as revised through Amendment No.

196, are hereby incorporated in the license.

The licensee shall operate the facility in accordance

" with the Technical Specifications.

This license amendment is effective as of the date of issuance, with full implementation within 45 days.

FOR THE NUCLEAR REGULATORY COMNISSION P John B. Hickman, Project Manager Project Directorate III-I Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

p>gush 15, 1996

II II 4h

ATTACHMENT TO LICENSE AMENDMENT NO.

196 FACILITY OPERATING LICENSE NO. DPR-74 OCK T NO. 50-316 Revise Appendix A Technical Specifications by removing the pages identified below and inserting the attached pages.

The revised pages are identified by amendment number and contain vertical lines indicating the area of change.

QfM~OV 3/4 4-33 INSERT 3/4 4-33

t1

~

3/4 LIMI'IINGCONDITIONS FOR OPERATION ANDSURVEILLANCEREQUIREMENTS 3/4.4 REACTOR COOLANTSYSTEM REACTOR C OLANTSYSTEM LIMITINGCONDITION FOR OPERATION Continued g.

With PORVs and block valves not in the same line inoperable due to causes other than excessive seat leakage, vrithin 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore the valves to OPERABLE status or close 2nd dmnergize the associated block valve and place the associated PORV in manual control in each respective line. Apply the portions of ACTION c or d above, relating to the OPERATIONALMODE, as appropriate for two or three lines unavailable.

h.

The provisions of Specification 3.0.4 are not applicable.

SURVEILLANCERE UIREMENTS 4.4.11.1 In addition to the requirements of Specification 4.0.5, each PORV shall be demonstrated OPERABLE:

a.

At least once per 31 days by performance of a CHANNEL FUNCTIONALTEST, excluding valve operation, and b.

At least once per 18 months by operating the PORV through one complete cycle of full travel during MODES 3 or 4, and c.

At least once per 18 months by operating solenoid air control valves and check valves in PORV control systems through one complete cycle of full travel, and d.

At least once per 18 months by performing a CHANNEL CALIBRATIONof the actuation instrumentation.t 4.4.11.2 Each block valve shall be demonstrated OPERABLE at least once per 92 days by operating the valve through one complete cycle of full travel unless the block valve is closed in order to meet the requirements of ACTION b, c, or d in Specification 3A.ll.

4.4.11.3 Deleted.

'The provisions of Technical Specification 4.0.8 are applicable.

COOK NUCLEAR PLANX'-UNIT2 Page 3/4 4-33 AMENDMENTm, uS, m,~ 196

0