ML17333A535
| ML17333A535 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 07/31/1996 |
| From: | Sampson J, Doreen Turner AMERICAN ELECTRIC POWER CO., INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9608130022 | |
| Download: ML17333A535 (9) | |
Text
CATEGORY j.
REGULATO INFORMATION DISTRIBUTION
.STEM (RIDS)
..c<
A'gCESSIOK~ NBP.:9608130022 DOC.DATE: 96/07/31 NOTARIZED: NO DOCKET I FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 AUTH.NAME AUTHOR AFFILIATION TURNER,D.G.
American Electric Power Co., Inc.
SAMPSON,J.R.
American Electric Power Co., Inc.
RECIP.NAME RECIPIENT 'AFFILIATION;
SUBJECT:
Monthly operating rept for July 1996 for DC Cook Nuclear Plant, Unit 1.W/960801 ltr.
I DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD3-1 PD COPIES LTTR ENCL 1
1 RECIPIENT ID CODE/NAME HICKMAN,J COPIES LTTR ENCL 1
1 INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAL LITCO BRYCE g J H
NRC PDR 1
1 1
1 1
1 1
RGN3 NOAC CENTER 1
1 1
1 1
1 1
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!,
TOTAL NUMBER OF COPIES REQUIRED:
LTTR i 9
ENCL 9
Et f
Pal 1
) ~
American ElectricP~
Cook Nuclear Plant One Cook Place r Bridgman, Ml 49106
" 6164655901 August 1, 1996 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of July 1996 is submit'ted.
Respectfully, J.R.
Sampson Plant Manager Attachment 3.201 03.
c NRC Region III D.RE Hahn R.C. Callen S.
Hamming INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett W.G. Smith, Jr.
S.J.
Brewer D.W. Paul S.H. Steinhart D.L. Noble W.H. Schalk D.G. Turner B.L. Bartlett M.E. Russo TE~<~i 9608i30022 96073i PDR ADOCK 050003i5 R
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-315 DATE 01/Aug/96 COMPLETED BY DG Turner TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name DE C.
Cook Unit 1
- 2. Reporting Period July 1996 notes
- 3. Licensed Thermal Power (MWt) 3250 4.
Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1020 6.
Maximum Dependable Capacity (GROSS MWe) 1056 7.
Maximum Dependable Capacity (Net MWe) 1000
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through
- 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
- 11. Hours in Reporting Period 12.
No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Therm.
Energy Gen.
(MWH)
- 17. Gross Elect.
Energy Gen.
(MWH)
- 18. Net Elect. Energy Gen.
(MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor 21'nit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate 24.
Shutdowns Scheduled over Next Six None This Mo.
Yr. to Date 744.0 5112.0 744.0 5090.1 0.0 0.0 744.0 5076.0 0.0 0.0 2320664 16240130 754470 5353180 727100 5165896 100.0 99.3 100.0 99.3 97.7 101.1 95.8 99 '
0.0 0.7 Months (Type, Date,and Cumm.
189192.0 143082.4 463.0 140710.1 321.0 415658011 134965550 129843995 75.2 75.2 68.4 66.7
6.0 Duration)
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (NWe-Net)
MONTH DOCKET NO.
50-315 UNIT ONE DATE 01/Aug/96 COMPLETED BY DG Turner TELEPHONE 616-465-5901 July 1996 DAY 96/07/01 96/07/02 96/07/03 96/07/04 96/07/05 96/07/06 96/07/07 96/07/08 96/07/09 96/07/10 96/07/11 96/07/12 96/07/13 96/07/14 96/07/15 96/07/16 AVERAGE DAILY POWER LEVEL 1012 1019 1037 1038 1017 998 974 969 993 1025 1015 1003 660 985 1016 992 DAY 96/07/17 96/07/18 96/07/19 96/07/20 96/07/21 96/07/22 96/07/23 96/07/24 96/07/25 96/07/26 96/07/27 96/07/28 96/07/29 96/07/30 96/07/31 AVERAGE DAILY POWER LEVEL 973 967 979 973 983 987 982 976 954 944 948 974 992 957 956
DOCKET NO:
50-315 UNIT NAME:
D.C.
Cook Unit 1 COMPLETED BY:
M.E. Russo TELEPHONE:
616-697-5100 DATE:
August 1, 1996 PAGE:
Page 1 of 3
MONTHLY OPERATING ACTIVITIES - JULY 1 6
HIGHLIGHTS*
The unit entered this reporting period in Mode 1 at 98%
RTP ascending to 100%
RTP following a power reduction to 93%
RTP for Main Transformer thermal limitations.
Reactor power was decreased to 92%
RTP July 5 and July 27 to facilitate Main Turbine control valve testing.
Reactor power was decreased to 58%
RTP July 13 at 0827 to remove the East Main Feed Pump from service to facilitate condenser leak checks.
Reactor power was stabilized at 100%
RTP July 14 at 0550.
Reactor power was decreased on four separate occasions to no less than 88.5%
RTP due to Main Transformer thermal limitations as a result of increasing ambient temperature conditions.
The unit exited this reporting period in Mode 1 at 88.5%
RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of July was 754470 MWH.
DETAILS*
07-01-96 0150 Reactor power stabilized at 100%
RTP.
07-05-96 1830 Commenced power reduction to 92%
RTP for Main Turbine control valve testing.
2025 Reactor power stabilized at 92% RTP.
07-06-96 0037 Commenced Reactor power ascension to 100%
RTP following testing.
0315 Reactor power stabilized at 100%
RTP.
) ~
~
DOCKET NO:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE:
PAGE:
50-315 D.C.
Cook Unit 1 M.E. Russo 616-697-5100 August 1, 1996 Page 2 of 3 MONTHLY OPERATING ACTIVITIES - JULY 1 6
DETAILS* (cont'd) 07-06-96 1024 Commenced power reduction due to Main Transformer thermal limitations.
07-09-96 1213 0859 1203 Reactor power stabilized at 95% RTP.
Commenced power ascension to 100% RTP.
Reactor power stabilized at 100%
RTP.
07-12-96 1100 Commenced power reduction due to Main Transformer thermal limitations.
1606 Reactor power stabilized at 95% RTP.
07-13-96 0100 Commenced power reduction for East Main Feedpump condenser leak checks.
07-14-96 0827 2030 0550 Reactor power stabilized at 58% RTP.
Commenced power ascension to 100%
RTP.
Reactor power stabilized at 100%
RTP.
07-16-96 1140 Commenced power reduction due to Main Transformer thermal limitations.
1421 Reactor power stabilized at 96.5%
RTP.
07-27-96 0625 Commenced power reduction to 92%
RTP for Main Turbine control valve testing.
0830 Reactor power stabilized at 92% RTP.
1235 Commenced Reactor power ascension to 96% RTP following testing.
1430 Reactor power stabilized at 96% RTP.
DOCKET NO:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE:
PAGE:
50-315 D.C.
Cook Unit 1 M.E. Russo 616-697-5100 August 1, 1996 Page 3 of 3 MONTHLY OPERATING ACTIVITIES JULY 1 96 DETAILS* (cont'd) 07-31-96 1855 Commenced power reduction due to Main Transformer hydrogen concentration increase.
2208 Reactor power stabilized at 88.5%
RTP.
- All time entries above are Eastern Standard Time (EST).
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JULY 1996 DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
PAGE:
50-315 D.C.
COOK UNIT '1 August 1, 1996 M.E. Russo 616-697-5100 Page 1 of 1 DURATION NO.
DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON REACTOR REPORT NO.
CODE CODE TO PREVENT RECURRENCE 327 960713 S
N/A N/A N/A N/A N/A Reactor power was reduced to 58%
RTP 960713 at 0827 EST.
The East Main Feedpump was removed from service to facilitate condenser leak checks.
Reactor power was stabilized at 100%
RTP 960714 at 0550 EST.
F S
Forced Scheduled 2
Reason:
A:
Equipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and License Examination F:
Administrative G:
Operational Error (Explain)
H:
Other (Explain) 3 Method:
1:
Manual 2:
Manual Scram 3:
Other (Explain) 4 Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 Exhibit I: