CATEGORY j.
REGULATOb.
INFORMATION DISTRIBUTION.
STEM (RIDS) i
'ACCESSION NBR:9602150410 DOC.DATE: 96/01/31 NOTARIZED:
NO DOCKET ¹ FACIL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION JANISSE,J.D.
Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele RUSSO,M.E.
Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele SAMPSON,J.R.
Indiana Michigan Power Co. (formerly Indiana a Michigan Ele RECIP.NAME RECIPIENT 'AFFILIATION
SUBJECT:
Monthly operating rept for Jan 1996 for Donald C.
Cook Nuclear Plant, Unit 2 TS 6.9.l.lO.W/960205 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT I.'D CODE/NAME PD3-3:
PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAL: LITCO BRYCE,J H
NRC PDR COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1
1 HICKMAN,J 1
1 LE CENTER 1
1
'3 1
1 NOAC 1
1 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTETH CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED(
TOTAL NUMBER OF COPIES REQUIRED:
LTTR
-9 ENCL 9
kl I
r I
I
February 5,
1996 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of January 1996 is submitted.
Respectfully, J.R.
Sampson Plant Manager Attachment c:
NRC Region III D.R.
Hahn R.C. Callen S.
Hamming INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett W.G. Smith, Jr.
S.J.
Brewer D.W. Paul S.H. Steinhart J.L. Leichner B.L. Bartlett D.G. Turner W.H. Schalk M.E. Russo 9602i504i0 960i3i PDR ADQCK 050003i6
<<R PDR JQUUQQ
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-316 DATE 05/Feb/96 COMPLETED BY J D Janisse TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit 2
- 2. Reporting Period Jan 1996
- 3. Licensed Thermal Power (MWt) 3411 4.
Name Plate Rating (Gross MWe) 1133 5
~ Design Electrical Rating (Net MWe) 1090 6.
Maximum Dependable Capacity (GROSS MWe) 1100 7.
Maximum Dependable Capacity (Net MWe) 1060 notes
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through
- 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
This Mo.
Yr. to Date Cumm.
11.
Hours in Reporting Period 744.0 744.0 158520.0 12.
No. of Hrs. Reactor Was Critical 744.0
,744.0 109068.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14.
Hours Generator on L'ine 744.0 744.0 105549.7
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Therm.
Energy Gen.
(MWH) 2530858 2530858 324165322 17.
Gross Elect.
Energy Gen.
(MWH) 833150 833150 105039510
- 18. Net Elect.
Energy Gen.
(MWH) 805914 805914 101165877
- 19. Unit Service Factor 100.0 100.0 67.6
- 20. Unit Availability Factor 100.0 100.0 67.6
- 21. Unit Capacity Factor (MDC Net) 102.2 102.2 61.0,
- 22. Unit Capacity Factor (DER Net) 99.4 99.4 59.4
- 23. Unit Forced Outage Rate 0.0 0.0 15.0 24.
Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):
Refuelin outa e to be in March 23,, 1996 for an estimated duration of 50 da s.
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
4
,~
U AVERAGE DAILY POWER LEVEL (MWe-Net)
MONTH DOCKET NO.
50-316 UNIT TWO DATE 05/Feb/96 COMPLETED BY J D Janisse TELEPHONE 616-465-5901 Jan 1996 DAY 96/01/01 96/01/02 96/01/03 96/01/04 96/01/05 96/01/06 96/01/07 96/01/08 96/01/09 96/01/10 96/01/11 96/01/12 96/01/13 96/01/14 96/01/15 96/01/16 AVERAGE DAILY POWER LEVEL 1086 1088 1081 1049 1090 1074 1085 1086 1086 1086 1086 1086 1081 1086 1088 1084 DAY 96/01/17 96/01/18 96/01/19 96/01/20 96/01/21 96/01/22 96/01/23 96/01/24 96/01/25 96/01/26 96/01/27 96/01/28 96/01/29 96/01/30 96/01/31 AVERAGE DAILY POWER LEVEL 1085 1084 1085 1083 1084 1086 1081 1083 1084 1082 1082 1084 1084 1085 1084
DOCKET NO:
UNIT NAME:
COMPLETED BY'ELEPHONE:
DATE:
PAGE:
50-316 D.C.
Cook Unit 2 M.E. Russo 616-465-5901 February 5,
1996 Page 1 of 1 MONTHLY OPERATING ACTIVITIES JANUARY 1996 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100%
RTP.
Reactor power was decreased to 95%
RTP January 4,
1996 at 0005 to conduct Main Turbine control valve testing.
Reactor power was stabilized at 100$ January 4,
1996 at 1815.
The unit exited this reporting period in Mode 1 at 100%
RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of January was 833150 MWH.
DETAILS 01-03-96 01-04-96 1905 0005 1700 1815 Commenced Reactor power reduction to 95%
RTP to conduct Main Turbine control valve testing.
Reactor power stabilized at 95% RTP.
Main Turbine control valve testing completed.
Commenced Reactor power ascension to 100%
RTP.
Reactor power stabilized at 100%
RTP.
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JANUARY 1996 UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE PAGE:
D C COOK UNIW 2 February 5,
1996 M.E. Russo 616-465-5901 Page 1 OF 1
DURATION NO.
DATE TYPE HOURS METHOD OF SHUTTING DOWN REASON REACTOR LICENSEE EVENT SYSTEM REPORT NO.
CODE COMPONENT CAUSE AND CORRECTIVE ACTION CODE TO PREVENT RECURRENCE None There were no unit shutdowns or~
significant power reductions f~
100%
RTP this month.
1 F:
Forced S:
Scheduled 2
Reason:
A:
Equipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and License Examination F:
Administrative G:
Operational Error (Explain)
H:
Other (Explain) 3 Method:
1:
Manual 2:
Manual Scram 3:
Other (Explain) 4 5
Exhibit G Instructions Exhibit I:
for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161)
Same Source
.0 0
f I