Monthly Operating Rept for Nov 1995 for DC Cook Nuclear Plant Unit 2
ML17333A213
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 11/30/1995
From: Blind A, Janisse J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9512140124
Download: ML17333A213 (7)


Text

DICER.I EW CCEI ERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9512140124 DOC.DATE: 95/11/30 NOTARIZED: NO DOCKET N

FACIL:50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Xndiana M

05000316 AUTH.NAME AUTHOR AFFILIATION JANISSE,J.D.

Indiana Michigan Power Co.

(formerly Indiana 6 Michigan Ele p

BLIND,A.A.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operatinq rept for Nov 1995 for Donald C Cook Nuclear Plant Unxt 2.W/951204 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

0 RECIPIENT XD CODE/NAME PD3-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAL LXTCO BRYCE iJ H

NRC PDR COPXES-LTTR ENCL 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME HICKMAN,J L

E RGN3 NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 Y,,'

0'i iiOTE TO ALL"RIDS" RE CI PI EYTS:

PLEASE HELP US TO REDUCE iviiSTE!CONTACT'I'HE DOC!.'iIEYTCONTROL DESK, ROOM Pl-37 (EXT. 504.

OS3 ) TO I'.LDIlhr'ATEYOUR iA!ilL P ROi!

DISTRIBUTION LIS'I'S I'OR DOCl,'MEN'I'S YOI'OY'"I'E!'.D!

TOTAL NUMBER OF COPXES REQUIRED:

LTTR 9

ENCL 9

Indiana Michigan ~

Power Company Cook hfuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 December 4,

1995 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of November 1995 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment c:

NRC Region III D.R.

Hahn R.C. Callen S.

Hamming INFO Records Center ANI Nuclear Engineering E.E. Fitzpatrick W.G. Smith, Jr.

S.J.

Brewer D.W. Paul S.H. Steinhart J.L. Leichner B.L. Bartlett D.G. Turner Visitor Center Manager M.E. Russo Department 140049 9512140124 951130

'PDR ADOCK 05000316

~

(i R,

.,,;;,PDR,

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-316 DATE 04/Dec/95 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 2

2. Reporting Period Nov 1995 notes
3. Licensed Thermal Power (MWt) 3411 4.

Name Plate Rating (Gross MWe) 1133

5. Design Electrical Rating (Net MWe) 1090 6.

Maximum De'pendable Capacity (GROSS MWe) 1100 7.

Maximum Dependable Capacity (Net MWe) 1060

8. If Changes Occur in Capacity Ratings (items no.

3 through

7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 10 'easons For Restrictions. If Any:

This Mo.

Yr. to Date Cumm.

ll. Hours in Reporting Period 720.0 8016.0 157032.0 12.

No. of Hrs. Reactor Was Critical 720.0 7563.8 107580 '

13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator'on Line 720. 0 7526.6 104061.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Therm.

Energy Gen.

(MWH) 2448176 25047109 319145291

17. Gross Elect.

Energy Gen.

(MWH) 801230 8080010

, 103387000

18. Net Elect.

Energy Gen.

(MWH) 775854 7809869 99567304 19'nit Service Factor 100.0 93.9 67.3

20. Unit Availability Factor 100.0 93.9 67 '
21. Unit Capacity Factor (MDC Net) '01.7 91.9 60.6
22. Unit Capacity Factor (DER Net) 98.9 89.4 59 F 1
23. Unit Forced Outage Rate 0.0 6.1 15.2 24.

Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):

Refuelin outa e to be in March 23 1996 for an estimated duration of 50 da s.

25. If Shut Down At End of Report Period, Estimated Date of Startup:

N.

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

MONTH DOCKET NO ~

50-316 UNIT TWO DATE 04/Dec/95 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 Nov 1995 DAY 95/11/01 95/11/02 95/11/03 95/11/04 95/11/05 95/11/06 95/11/07 95/11/08 95/11/09 95/11/10 95/11/11 95/11/12 95/11/13 95/11/14 95/11/15 95/11/16 AVERAGE DAILY POWER LEVEL 1070 1062 1059 1075 1079 1075 1080 1082 1073 1067 1083 1079 1074 1082 1074 1074 DAY 95/11/17 95/11/18 95/11/19 95/11/20 95/11/21 95/11/22 95/11/23 95/11/24 95/11/25 95/11/26 95/11/27 95/11/28 95/11/29 95/11/30 AVERAGE DAILY POWER LEVEL 1070 1051 1081 1085 1084 1087 1086 1085 1089 1080 1085 1086 1084 1087

DOCKET NO:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE:

PAGE:

50-316 D.C.

Cook Unit 2 M.E. Russo 616-465-5901 December 4,

1995 Page 1 of 1

MONTHLY OPERATING ACTIVITIES NOVEMBER 1995 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100%

RTP.

Reactor power was decreased to 95%

RTP November 17, 1995 at 0021 to place Moisture Separator Reheaters in service.

Power ascension to 100%

RTP commenced November 17, 1995 at 1455 and was attained November 17, 1995 at 1635.

The unit exited this reporting period in Mode 1 at 100%

RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of November was 801230 MWH.

DETAILS 11-16-95 11-17-95 2110 0021 1455 1635 Commenced Reactor power decrease to 95%

RTP to place Moisture Separator Reheaters in service.

Reactor power stabilized at 95% RTP.

Commenced Reactor power ascension to 100% RTP.

Reactor power stabilized at 100%

RTP.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: NOVEMBER 1995 UNIT NAME:

DATE COMPLETED BY:

TELEPHONE:

PAGE:

p r D.C.

COOK UNIT 2i December 4,

1995 M.E. Russo 616-465-5901 Page 1 OF 1 DURATION NO.

DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON REACTOR REPORT NO.

CODE CODE TO PREVENT RECURRENCE, None There were no unit shutdowns or significant power reductions fro~

100'b RTP this month.

1 F:

Forced S:

Scheduled 2

Reason:

A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain)

Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File.

(NUREG 0161) 5Exhibit I:

Same Source

~r

~ 'q ~

ff~

I r c E