Monthly Operating Rept for Sept 1995 for DC Cook Unit 1
ML17332A965
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/30/1995
From: Janisse J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17332A964 List:
References
NUDOCS 9510160285
Download: ML17332A965 (4)


Text

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-315 DATE 03/Oct/95 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS

l. Unit Name D.

C.

Cook Unit 1

2. Reporting Period Sep 1995 notes
3. Licensed Thermal Power (MWt) 3250 4.

Name Plate Rating (Gross MWe) 1152

5. Design Electrical Rating (Net MWe) 1020 6.

Maximum Dependable Capacity (GROSS MWe) 1056 7.

Maximum Dependable Capacity (Net MWe) 1000

8. If Changes Occur in Capacity Ratings (Items no.

3 through

7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

11.

Hours in Reporting Period 12.

No. of Hrs. Reactor Was Critical

13. Reactor Reserve Shutdown Hours 14.

Hours Generator on Line

15. Unit Reserve Shutdown Hours
16. Gross Therm.

Energy Gen.

(MWH) 17.

Gross Elect Energy Gen.

(MWH)

18. Net Elect. Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Six This Mo 720 0

0 0

0 0

0 0

0 0

Months Y

.0

.0.

.0

.0

.0 0

0 0

.0

.0

.0

.0

.0

r. to Date 6552.0 4682.0 0.0 4659.4 0.0 14279008 4645030 4476987 71.1 71.1 68.3 67.0 12.6 e,Date,and Cumm.

181872.0 136592.9 463 '

134483.0 321.0 396399585 128650470 123758302 74.8 74.8 67.8 66.1

6.0 Duration)

25. If Shut Down At End of Report Period, Estimated Date of Startup:

October 20, 1995

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

MONTH DOCKET NO.

50-315 UNIT

'NE DATE 03/Oct/95 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 Sep 1995 DAY 95/09/01 95/09/02 95/09/03 95/09/04 95/09/05 95/09/06 95/09/07 95/09/08 95/09/09 95/09/10 95/09/11 95/09/12 95/09/13 95/09/14 95/09/15 95/09/16 AVERAGE DAILY POWER LEVEL DAY 95/09/17 95/09/18 95/09/19 95/09/20 95/09/21 95/09/22 95/09/23 95/09/24 95/09/25 95/09/26 95/09/27 95/09/28 95/09/29 95/09/30 AVERAGE DAILY POWER LEVEL

DOCKET NO:

50-315 UNIT NAME:

D.C.

Cook Unit 1

COMPLETED BY:

G.F.

Bussone TELEPHONE:

616-465-5901 DATE:

October 9,

1995 PAGE:

Page 1 of 1 MONTHLY OPERATING ACTIVITIES SEPTEMBER 1995 HIGHLIGHTS The unit entered this reporting period in Mode 6 at 0%

RTP for Main Transformer replacement and the cycle 14 to 15 maintenance/refueling outage.

Movement of fuel into the vessel and entry into Mode 6 with fuel commenced on 09-28-95.

Fuel movement was halted on 09-29-95 due to a damaged fuel assembly.

There were no challenges to the pressurizer safety valves or power operated relief valves.

The unit exited this reporting period in Mode 6 at 0% RTP.

Gross electrical generation for the month of September was 0 MWH.

DETAILS 09-28-95 09-29-95 2250 EST Entered Reactor Mode 6 with fuel.

0150 EST Fuel movement halted due to a damaged fuel assembly.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH:

SEPTEMBER 1995 UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

PAGE:

D.C.

COOK UNIT 1 1

~

October" 9, 1995 G.F.

Bussone 616-465-5901 Page 1 of' DURATION NO.

DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON REACTOR REPORT NO.

CODE CODE TO PREVENT RECURRENCE 318 950716 S

720.0 B,C N/A N/A N/A The unit remained shutdown for the cycle 14 to 15 maintenance/refueling outage throughout this reporting period.

F:

S:

Forced Scheduled 2

Reason:

A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5Exhibit I:

Same Source