PRIORITY (ACCELERATED RIDS PROCESSING) 4 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9507140142 DOC.DATE: 95/06/30 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 AUTH.NAME AUTHOR AFFILIATION TURNER,J.

Indiana Michigan Power Co.

BUSSONE,G.F.

Indiana Michigan Power Co.

BLIND,A.A.

Indiana Michigan Power Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operatinq rept for June 1995 for Donald C Cook Nuclear Plant Unzt 1.W/950706 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs NOTES:

RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DISP/PgPB RGN3 EXTERNAL LITCO BRYCE iJ H

NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

RECIPIENT ID CODE/NAME HICKMAN,J LE CENTER 1

NRR B

NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL

DESK, ROOM OWFN 5DS (415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

/

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 10

Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 INWANSl MICHIGAN PSPM July 6, 1995 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of June 1995 is submitted.

Respectfully,

~

~

.A. Blind Plant Manager Attachment c:

NRC Region III D.R.

Hahn R.C. Callen S.

Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick W.G. Smith, Jr.

S.J.

Brewer D.W. Paul, S.H. Steinhart J.L. Leichner J.A.

Isom D.G. Turner E.A. Smarrella M.E. Russo A

9507140142 950b30 PDR ADOCK 050003i5 R

PDR

"4 N.R.C.

RATING DATA REPORT DOCKET NO.

50-315 DATE 03/Jul/95 COMPLETED BYJanisse/Turner TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 1

2. Reporting Period June 1995
3. Licensed Thermal Power (MWt) 3250 4.

Name Plate Rating (Gross MWe) 1152

5. Design Electrical Rating (Net MWe) 1020 6.

Maximum Dependable Capacity (GROSS MWe) 1056 7.

Maximum Dependable Capacity (Net MWe)

'1000 notes

8. If Changes Occur in Capacity Ratings (Items no.

3 through 7). Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

11.

Hours in Reporting Period

~

12.

No. of Hrs. Reactor Was Critical

13. Reactor Resexve Shutdown Hours 14.

Hours Generator on Line

15. Unit Reserve Shutdown Hours 16.

Gross Therm.

Energy Gen.

(MWH) 17.

Gross Elect.

Energy Gen.

(MWH)

18. Net Elect.

Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Six This Mo.

Yr. to Date Cumm.

720.0 4344.0 179664.0 720.0 4344.0 136254.9 0.0 0.0 463. 0 720.0 4344.0 1341'67.6 0.0 0.0 321.0 1868061 13551283 395671861 596760 4418510 128423950 571230 4261814 123543129 100.0 100.0 75.6 100.0 100.0 75.6 79.3 98.1 68.6 77.8 96.2 66.8 0.0 0.0 5.6 Months (Type, Date,and Duration):

15 1995 for an estimated

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

DOCKET NO.

50-315 UNIT ONE DATE 03/JU1/95 COMPLETED BYJanisse/Turner TELEPHONE 616-465-5901 DAY 95/06/01 95/06/02 95/06/03 95/06/04 95/06/05 95/06/06 95/06/07 95/06/08 95/06/09 95/06/10 95/06/11 95/06/12 95/06/13 95/06/14 95/06/15 95/06/16 June 1995 1019 1002 1018 1021 1018 1017 1013

'1021 1021 1017 1013 1016 1022 1017 1006 990 MONTH AVERAGE DAILY POWER LEVEL DAY 95/06/17 95/06/18 95/06/19 95/06/20 95/06/21 95/06/22 95/06/23 9S/06/24 95/06/25 95/06/26 95/06/27 95/06/28 95/06/29 95/06/30 AVERAGE DAILY POWER LEVEL 569 514 519 536 543 543 544 544 543 546

. 550 S40 541 540

DOCKET NO:

50-315 UNIT NAME:

D.C.

Cook Unit 1 COMPLETED BY:

G.F.

Bussone TELEPHONE:

616-465-5901 DATE:

July 6, 1995 PAGE:

Page 1 of 1 MONTHLY OPERATING ACTIVITIES JUNE 1995 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100%

RTP.

The unit exited this reporting period in Mode 1 at 57% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of June was 596760 MWH.

DETAILS 06-02-95 06-03-95 J

06-16-95 06-17-95 06-19-95 1915 2154 0047 0227 1900 1017 1417 1600 Commenced Reactor power reduction to 92%

RTP to conduct Main Turbine control valve testing.

Reactor power stabilized at 92% RTP.

Turbine control valve testing completed.

Commenced Reactor power ascension to 100%

RTP.

Reactor power stabilized at 100%

RTP.

Commenced Reactor power reduction to 55%

RTP for a planned West Main Feed Pump outage.

Reactor power stabilized at 55% RTP.

Commenced Reactor power ascension to 57%

RTP to meet increased grid demand.

Reactor power stabilized at 57% RTP.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JUNE 1995 UNIT NAME:

DATE COMPLETED BY:

TELEPHONE:

PAGE D AC.

COOK UNIT. 1 July 6, 1995 G.F.

Bussone 616-465-5901 Page 1 of l.

DURATION NO.

DATE TYPE HOURS METHOD OF SHUTTING DOWN REASON REACTOR LICENSEE EVENT SYSTEM REPORT NO.

CODE COMPONENT CAUSE AND CORRECTIVE ACTION CODE TO PREVENT RECURRENCE 316 950617 S

325.7 N/A N/A N/A Reactor power was decreased to 55%

RTP on 950617 at 1017 in support of a planned West Main Feed Pump outage.

Reactor power was increased to 57%

RTP on 950619 to meet increased grid demand.

1 F:

Forced S:

Scheduled 2

Reason:

A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4Exhibit G Instructions for,preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5Exhibit I: