Monthly Operating Rept for June 1995 for Donald C Cook Nuclear Plant Unit 1.W/950706 Ltr
ML17332A842
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 06/30/1995
From: Blind A, Bussone G, Joseph Turner
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9507140142
Download: ML17332A842 (7)


Text

PRIORITY (ACCELERATED RIDS PROCESSING) 4 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9507140142 DOC.DATE: 95/06/30 NOTARIZED: NO DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH. NAME AUTHOR AFFILIATION TURNER,J. Indiana Michigan Power Co.

BUSSONE,G.F. Indiana Michigan Power Co.

BLIND,A.A. Indiana Michigan Power Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operatinq rept for June 1995 for Donald C Cook Nuclear Plant Unzt 1.W/950706 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 PD 1 1 HICKMAN,J 1 1 INTERNAL: AEOD/SPD/RRAB 1 ' 1 LE CENTER 1 1 1 NRR/DISP/PgPB 1 NRR B 1 1 RGN3 1 1 EXTERNAL LITCO BRYCE i J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5DS (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

/

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 INWANSl MICHIGAN PSPM July 6, 1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of June 1995 is submitted.

Respectfully,

.A. Blind

~ ~

Plant Manager Attachment c: NRC Region D.R. Hahn III R.C. Callen S . Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick W.G. Smith, Jr.

S.J. Brewer D.W. Paul, S.H. Steinhart J.L. Leichner J.A. Isom D.G. Turner E.A. Smarrella M.E. Russo A

9507140142 950b30 PDR ADOCK 050003i5 R PDR

"4 N.R.C. RATING DATA REPORT DOCKET NO. 50-315 DATE 03/Jul/95 COMPLETED BYJanisse/Turner TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 1
2. Reporting Period June 1995 notes
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity (GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) '1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through Last Report Give Reasons 7). Since
9. Power Level To Which Restricted.
10. Reasons For Restrictions. If If Any (Net MWe)

Any:

This Mo. Yr. to Date Cumm.

11. Hours in Reporting Period ~

720.0 4344.0 179664.0

12. No. of Hrs. Reactor Was Critical 720.0 4344.0 136254.9
13. Reactor Resexve Shutdown Hours 0.0 0.0 463. 0
14. Hours Generator on Line 720.0 4344.0 1341'67.6
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Therm. Energy Gen. (MWH) 1868061 13551283 395671861
17. Gross Elect. Energy Gen. (MWH) 596760 4418510 128423950
18. Net Elect. Energy Gen. (MWH) 571230 4261814 123543129
19. Unit Service Factor 100.0 100.0 75.6
20. Unit Availability Factor 100.0 100.0 75.6
21. Unit Capacity Factor (MDC Net) 79.3 98.1 68.6
22. Unit Capacity Factor (DER Net) 77.8 96.2 66.8
23. Unit Forced Outage Rate 0.0 0.0 5.6
24. Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):

15 1995 for an estimated

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

DOCKET NO. 50-315 UNIT ONE DATE 03/JU1/95 COMPLETED BYJanisse/Turner TELEPHONE 616-465-5901 MONTH June 1995 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 95/06/01 1019 95/06/17 . 569 95/06/02 1002 95/06/18 514 95/06/03 1018 95/06/19 519 95/06/04 1021 95/06/20 536 95/06/05 1018 95/06/21 543 95/06/06 1017 95/06/22 543 95/06/07 1013 95/06/23 544 95/06/08 '1021 9S/06/24 544 95/06/09 1021 95/06/25 543 95/06/10 1017 95/06/26 546 95/06/11 1013 95/06/27 . 550 95/06/12 1016 95/06/28 S40 95/06/13 1022 95/06/29 541 95/06/14 1017 95/06/30 540 95/06/15 1006 95/06/16 990

DOCKET NO: 50-315 UNIT NAME: D.C. Cook Unit 1 COMPLETED BY: G.F. Bussone TELEPHONE: 616-465-5901 DATE: July 6, 1995 PAGE: Page 1 of 1 MONTHLY OPERATING ACTIVITIES JUNE 1995 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100% RTP.

The unit exited this reporting period in Mode 1 at 57% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of June was 596760 MWH.

DETAILS 06-02-95 1915 Commenced Reactor power reduction to 92% RTP to conduct Main Turbine control valve testing.

2154 Reactor power stabilized at 92% RTP.

06-03-95 0047 Turbine control valve testing completed.

Commenced Reactor power ascension to 100% RTP.

0227 Reactor power stabilized at 100% RTP.

J 06-16-95 1900 Commenced Reactor power reduction to 55% RTP for a planned West Main Feed Pump outage.

06-17-95 1017 Reactor power stabilized at 55% RTP.

06-19-95 1417 Commenced Reactor power ascension to 57% RTP to meet increased grid demand.

1600 Reactor power stabilized at 57% RTP.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME: D AC. COOK UNIT. 1 DATE July 6, 1995 REPORT MONTH: JUNE 1995 COMPLETED BY: G.F. Bussone TELEPHONE: 616-465-5901 PAGE Page 1 of l.

METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE HOURS REASON REACTOR REPORT NO. CODE CODE TO PREVENT RECURRENCE 316 950617 S 325.7 N/A N/A N/A Reactor power was decreased to 55% RTP on 950617 at 1017 in support of a planned West Main Feed Pump outage. Reactor power was increased to 57% RTP on 950619 to meet increased grid demand.

1 2 3 4 5 F: Forced Reason: Method: Exhibit G Instructions Exhibit I: Same S: Scheduled A: Equipment Failure (Explain) 1: Manual for, preparation of data Source B: Maintenance or Test 2: Manual Scram entry sheets for Licensee C: Refueling 3: Automatic Scram Event Report (LER) File D: Regulatory Restriction 4: Other (Explain) (NUREG 0161)

E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)