Notice of Violation from Insp on 940328-0401.Violation Noted:On 940318 Procedure 12 Thp 6010 RPP.606, Operation of Radwaste Water Demineralization Sys, Inappropriate
ML17331B372
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/29/1994
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML17331B371 List:
References
50-315-94-06, 50-315-94-6, NUDOCS 9405100018
Download: ML17331B372 (1)


Text

NOTICE OF VIOLATION Indiana Hichigan Power Company Donald C.

Cook Nuclear Power Plant Docket No. 50-315 License Nos.

DRP-58 During an NRC inspection conducted from Harch 28 through April 1,

1994, a

violation of NRC requirements was identified.

In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions,"

10 CFR Part 2,

Appendix C (1993), the violation is listed below:

10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," requires that activities affecting quality shall be prescribed 'by a procedure of a type appropriate to the circumstances and shall be accomplished in accordance with these procedures.'ontrary to the above:

On Harch 18,

1994, Procedure 12 THP 6010 RPP.606 "Operation of the Radioactive Waste Water Demineralization System (RWDS)" was inappropriate to the circumstances in that the valve lineup failed to identify a valve required to be opened for the e'volution to be completed successfully.-

2.

On Harch 19, 1994, Procedure'2 OHP 4021.007.002 "Reactor Coolant Demineralizer Resin Sluicing and Replacement" was inappropriate to the circumstances in that the procedure failed to identify alternative flow paths and the valves whose positions needed to be verified to prevent those alternative flow paths.

This is a Severity Level IV violation (Supplement IV).

Pursuant to the provisions of 10 CFR 2.201, Donald C.

Cook is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, D.C. 20555 with a copy to the U.S. Nuclear Regulatory Commission, Region III, 801 Warrenville Road, Lisle, Illinois 60532-4351, and a copy to the NRC Resident Inspector at the Big Rock Point'Nuclear Plant within 30 days of the date of the letter transmitting this Notice of Violation (Notice).

This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation:

(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results

achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.

If an adequate reply is not received within the time specified, in this Notice, an order or a demand for information may be issued as to why the license should not. be modified, suspended, or revoked, or why such other action as may be proper should not be taken.

Where good cause is shown, consideration will be given to extending the response time.

Dated at Lisle, Illinois this ~(~day of April 1994 9'405i00018 940429 PDR ADOCK 050003l5 8