Monthly Operating Rept for Sept 1992 for DCP Unit 1.W/
ML17329A633
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/30/1992
From: Blind A, Costello G, Doreen Turner
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9210130389
Download: ML17329A633 (10)


Text

xcczr.mAYKo O juamrox ozMowS arrow SvSrzM REGULA Z INFORMATION DISTRIBUTIO STEM (RIDS)

ACCESS?08 NBR:9210130389 DOC.DATE: 92/09/30 NOTARIZED:

NO DOCKET FAGIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 AUTH.NAME AUTHOR AFFILIATION TURNER,D.G.

Indiana Michigan Power Co.

BLIND,A.A.

Indiana Michigan Power Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Sept 1992 for DCP unit 1.W/

921005 ltr.

DISTRIBUTION CODE IE24D COPIES RECEIVED'LTR i

ENCL t SIZE'ITLE:

Monthly Operating Report (per Tech Specs)

NOTES:

S RECIPIENT ID CODE/NAME PD3-1 LA STANG,J INTERNAL: AEOD/DOA NRR/DLPQ/LPEB10 01 EXTERNAL: EGEG BRYCEPJ.H NSIC COPIES LTTR ENCL 3

3 1

1 1

l.

1 1

1 1

1 1

1 1

RECIPIENT ID CODE/NAME PD3-1 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGN3 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM P!-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

S TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 14

0

'c I

Indiana Michigan~

Power Company ~

Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 October 5, 1992 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit. 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of September 1992 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment C

NRC Region III D.R.

Hahn R.C. Callen S.

Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department D.H. Williams, Jr.

E.E. Fitzpatrick R.L.

Simms W.G. Smith, Jr.

D.A. Georgantis D.W. Paul S.H. Steinhart J.L. Leichner J.A.

Isom D.G. Turner E.A. Smarrella J.C. Krieger B.A. Svensson D.F. Krause E. C.

Schimmel

> Cih.li. I."J 9210130389 920930 PDR

  • DOCK 05000215 R

PDR ZEa

~

~

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-315 DATE 01-Oct-92 COMPLETED BY DG Turner TELEPHONE 616-465-5901 OPERATING STATUS

l. Unit Name D.

C.

Cook Unit 1

2. Reporting Period September 92
3. Licensed Thermal Power (MWt) 3250 4.

Name Plate Rating (Gross MWe) 1152

5. Design Electrical Rating (Net MWe) 1020 6.

Maximum Dependable Capacity (GROSS MWe) 1056

7. Maximum Dependable Capacity (Net MWe) 1000 notes
8. If Changes Occur in Capacity Ratings (Items no.

3 through

7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

This Mo.

Yr. to Date ll. Hours in Reporting Period 720.0 6576.0 12.

No. of Hrs. Reactor Was Critical 0.0 4156.9

13. Reactor Reserve Shutdown Hours 0.0 0.0
14. Hours Generator on Line 0 '

4156.9

15. Unit Reserve Shutdown Hours 0.0 0.0
16. Gross Therm.

Energy Gen.

(MWH) 0 11729928

17. Gross Elect.

Energy Gen.

(MWH) 0 3746530

18. Net Elect.

Energy Gen.

(MWH) 0 3595487

19. Unit Service Factor 0.0 63.2
20. Unit Availability Factor 0.0 63.2
21. Unit Capacity Factor (MDC Net) 0.0 54.7
22. Unit Capacity Factor (DER Net) 0.0 53.5
23. Unit Forced Outage Rate ERR 0.0 24.

Shutdowns Scheduled over Next Six Months (Type, Date,and Cumm.

155592-0 115298.2 463.0 113312 '

321.0 330914618 107492290 103367196 73.8 73.8 66.0 64.3

6.6 Duration)

25. If Shut Down At End of Report Period, Estimated Date of Startup:

921017

26. Units in Test Status (Prior to Commercial Operation):

Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

50-315 UNIT ONE DATE 01-Oct-92 COMPLETED BY DG Turner TELEPHONE 616-465-5901 DAY 1

2 3

5 6

7 8

9 10 11 12 13 14 15 16 MONTH September 92 AVERAGE DAILY POWER LEVEL DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL

UNIT SHUTKNNS AND PQ'KR REDUCTIONS REPORT MAIS:

September 1992 UNIT NAME:

D.C.

COOK UNIT 1 IRTE:

October 1, 1992 CCMEKZTED BY:

G.J. Costello TEXEP%iONE:

(616) 465-5901 MHSOD OF SHUITIN3 IZCENSEE DURATION DOWN EVENT TYPE1 HOURS R1RSON REACTOR3 REPORT NO.

SYSTEM COMPONEÃZ CAUSE AND CORRECTIVE ACTION TO CODE CGDE5 PREVENT RECUHFUXCE 301 920622 S

Cont'd 720 B/C N/A N/A N/A The unit remained shutdown for the cycle 12 to 13 maintenance/refueling outage th~ out this reporting period~

1 2

F:

Forced Reason:

S:

Scheduled A:

Ecru.pment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Opexwtor Training and License

$Mmunation F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4 5

Exhibit G Instructions Exhibit I:

Same Source for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161)

~

~

DOCKET NO UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE PAGE 50-315 D.C.

Cook Unit 1 G.Z. Costello, (616) 465-5901 October 1,

1992 1 of 1 MONTHLY OPERATING ACTIVITIES SEPTEMBER 1992 HIGHLIGHTS The unit entered the reporting period loaded and the reactor coolant system shutdown during this reporting period to 13 maintenance/refueling outage.

in Mode 6, with the core off drained.

The unit remained in support of the cycle 12 Mode 6, refueling was entered on September 18 and the reactor core reload was completed on September 20.

The reactor head was set on September 22.

The unit exited this reporting period in Mode 5.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of September was 0

MWH.

DETAILS 9-18-92 1349 Commence fuel reload from the spent fuel pool to the core.

1436 Entered Mode 6, first fuel assembly placed in the vessel.

9-20-92 9-22-92 9-25-92 1718 All fuel assembles are in the core.

0701 Reactor vessel head is set.

0333 Entered Mode 5.

DOCKET NO:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE:

PAGE'0-315 D.C.

Cook Unit 1 E.C.

Schimmel (616) 465-5901 October 5, 1992 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE Se tember 1992 There were no major safety-related maintenance items during the month of September.

l V