ML17329A609
| ML17329A609 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 06/30/1992 |
| From: | Doreen Turner INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | |
| Shared Package | |
| ML17329A606 | List: |
| References | |
| NUDOCS 9209150082 | |
| Download: ML17329A609 (2) | |
Text
~
~
~
v EVISED N.R.C-OPERATING DATA REPORT DOCKET NO.
50-316 DATE 14-Aug-92 COMPLETED BY DG Turner TELEPHONE 616-465-5901 OPERATING STATUS
- l. Unit Name D.
C.
Cook Unit 2
- 2. Reporting Period June 92
- 3. Licensed Thermal Power (MWt) 3411 4.
Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090 6.
Maximum Dependable Capacity (GROSS MWe) 1100 7.
Maximum Dependable Capacity (Net MWe) 1060 notes Revised to reflect correct Reactor Critical hours.
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
This Mo.
Yr.
- 11. Hours in Reporting Period 720.0 12.
No. of Hrs. Reactor Was Critical 358. 0
- 13. Reactor Reserve Shutdown Hours 0.0 14.
Hours Generator on Line 0.0
- 15. Unit Reserve Shutdown Hours 0.0 16.
Gross Therm.
Energy Gen.
(MWH) 36372 17.
Gross Elect.
Energy Gen.
(MWH) 0
- 18. Net Elect.
Energy Gen.
(MWH) 0
- 19. Unit Service Factor 0.0
- 20. Unit Availability Factor 0.0
- 21. Unit Capacity Factor (MDC Net) 0.0
- 22. Unit Capacity Factor (DER Net) 0.0
- 23. Unit Forced Outage Rate ERR 24.
Shutdowns Scheduled over Next Six Months (Type, to Date 4368.0 1611.4 0.0 1253.1 0.0 3698067 1161610 1118492 28.7 28.7 24.2 23.3 0.0 Date,and Cumm.
127080.0 84799.5 0.0 82853.2 0.0 256392700 83429760 80363364 66.4 66.4 60.8 59.1 12.9 Duration):
- 25. If Shut Down At End of Report period, Estimated Date of Startup:
- 26. Units in Test Status (prior to Commercial Operation):
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved 9209150082 920904 PDR ADQCK 05000316 R
0
~
>p 1