ML17329A605

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Aug 1992 for DC Cook Unit 2 & Revised Repts for June & Jul,Reflecting Correction in June Unit 2,Item 12 Re Number of Hours Reactor Critical & Jul Unit 2,Item 23 Concerning Unit Forced Outage Rate
ML17329A605
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/04/1992
From: Blind A
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17329A606 List:
References
NUDOCS 9209150067
Download: ML17329A605 (3)


Text

ACCELERATED DISTRIBUTIONDEMON RATION SYSTEM REGULATORY INFQRNATIQN DISTR IBUT10 SYSTEN (R IDS)

ACCESSION NBR: 9209150067 DOC. DATE: 9'2/OV/04 NOTARIZED:

NO FACIL,59-316 Donald C.

Coak Nuclear Pacer Plant>

Unit 2i Indiana M

AUTH. NANE AUTHOR AFFILIATION BLIND>A. A.

Indiana Nichigan Power Co.

RECIP. NANE RECIPXENT AFFXLIATXON Document Control Branch (Document Control Desk)

DOCKET 0 05000316

SUBJECT:

Foreards manthlg operating rept for Aug 1'7'P2

5. revised R

monthly aperating repts far Jun 5 Jul 1792 for Donald C Caok unit 2.

.I DISTRIEUTIDN CEDE:

IESOD COPIES RECEIVED: LTR i ENCL /

SIZE:

W 7

p TITLE: Nonthlg Operating Report (per Tech Specs)

NOTES:

REC IP IENT ID CODE/NANE PD3-1 LA STANG> J COPXES LTTR ENCL 3

3 1

1 RECIPIENT XD CODE/NANE PD3-1 PD COP IES LTTR ENCL 1

INTERNAL: AEOD/DOA NRR/DLPG/LPEB10 EG 01 1

1 1

1 1

AEQD/DSP /TPAB NRR/DQEA/OEAB'GN3 1

1 1

EXTERNAL:

EGecG BRYCE> J. H NSIC

.1 1

1 NRC PDR

'OTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCU!vIENTCONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

L TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 14

Indiana Michigan~

Power Company ~

Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 September 4,

1992 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of August 1992 is submitted.

Also attached, please find revised copies of the "Operating Data Reports" for Unit 2 for the months of June and July, 1992.

These reports were revised to reflect a correction in the June Unit 2, Item 12 "No. of Hrs. Reactor Was Critical", and the July Unit 2, Item 23 "Unit Forced Outage Rate".

We apologize for any inconvenience this error may have caused.

Respectfully, A.A. Blind Plant Manager Attachment c:

NRC Region III D.R.

Hahn R.C. Callen S.

Hamming J.G.

Keppler INPO Records Center ANI Nuclear Engineering Department D.H. Williams, Jr.

E.E. Fitzpatrick R.L.

Simms W.G. Smith, Jr.

D.A. Georgantis D.W. Paul S.H. Steinhart J.L. Leichner J.A.

Isom D.G. Turner E.A. Smarrella J.C. Krieger B.A. Svensson D.F. Krause j QQOO <JE. C. Schimmel 9209150067 920904

PDR, ADOCK 05000316 R

. 'DR

~

~

II

'