ACCELERATED DISTRIBUTION DEMONSTPA.TION SYSTEM REGUDRTCO INFORMATION DISTRIBUTIONOSTEM (RIDE)
DOCKET FAQIL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION TURNER Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele MICHAELSON Indiana Michigan Power Co. (formerly Indiana S Michigan Ele BLIND,A.A.
Indiana Michigan Power Co. (formerly Indiana a Michigan Ele RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operati t for June 1992 for DC Cook Nuclear Plant, Unit 2.W 92070 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD3-1 LA STANGFJ INTERNAL: AEOD/DOA RR~LQQ/LPEB10 REG 01 EXTERNAL:
EGGG BRYCEFJ.H NSIC COPIES LTTR ENCL 3
3 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD3-1 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGN3 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS'LEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 14
C I
b
\\
Indiana Michigan~
Power Company Cook Nuclear Plant One Cook Place Bridgrnan, Ml 49106 616 465 5901 R
July 7, 1992 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 2 Technical Specification 6,9.1.10, the attached Monthly Operating Report for the month of June 1992 is submitted.
Respectfully, A.A. Blind Plant Manager Attachment co NRC Region III D.R. Hahn R.C. Callen S.
Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department D.H. Williams, Jr.
E.E. Fitzpatrick R. L. Simms W.G. Smith, Jr.
D.A. Georgantis D.W. Paul S.H. Steinhart J.L. Leichner J.A. Isom C.B.
Zygmont E.A. Smarrella J,C. Kriecier B.A. Svensson D.F. Krause E.C.
Schimmel
r'
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-316 DATE 08-Jul-92 COMPLETED BY Turner/Michaelson TELEPHONE 616-465-5901 D.
C.
Cook Unit June OPERATING STATUS
- 1. Unit Name
- 2. Reporting Period
- 3. Licensed Thermal Power (MWt) 4.
Name Plate Rating (Gross MWe)
- 5. Design Electrical Rating (Net MWe) 6.
Maximum Dependable Capacity (GROSS MWe) 7.
Maximum Dependable Capacity (Net MWe) 2 92 3411 1133 1090 1100 1060 notes
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
- oP)$
I~O~
'Ho
,OO
- AIA
,'0'o h.~
iOQ h.OL AJR This Mo.
Yr.
720.0 406.0 0.0 0.0 0.0 37286 0
0 0.0 0.0 0.0 0.0 to Date 4368.0 1659.4 0.0 1253.1 0.0 3698981 1161610 1118492 28.7 28.7 24.2 23.3 0.0 Date,and ll. Hours in.Reporting Period 12.
No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours 16.
Gross Therm.
Energy Gen.
(MWH) 17.
Gross Elect.
Energy Gen.
(MWH)
- 18. Net Elect.
Energy Gen.
(MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate ERR 24.
Shutdowns Scheduled over Next Six Months (Type, Cumm.
127080.0 84847.5 0.0 82853.2 0.0 256393614 83429760 80363364 66.4 66.4 60.8 59.1 12.9 Duration):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
20712
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
50-316 UNIT TWO DATE 08-Jul-92 COMPLETED BY Turner/Michaelson TELEPHONE 616-465-5901 DAY 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 MONTH AVERAGE DAILY POWER LEVEL June 92 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 AVERAGE DAILY POWER LEVEL
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT~:
June 1992 DOCKET NO:
UNIT NAME:
DATE:
CCMPIZIK BY:
TlK1PHONE:
50-316 D.C.
COOK UNIT 2 July 3, 1992 G.J. ~D.lo (616) 465-5901 METHOD OF SHUTTING LI:CENSEE DURATION IXNN EVENT SYSTEM COMHNERZ CAUSE AND CORRECrIVE ACTION IO NO DATE TYFK HOURS REASON REACIOR REEQRP NO.
CODE CODE PRIWENT REXXJRRENCE 223 920222 S
Cont'd 720 B,C N/A N/A N/A The unit remained shutdown for the cycle 8 tc 9 maintenance/refueling
~
outage throughout this reporting period.
The low power physics testing has been completed.
The main turbine-generator has ~ienced a
vibration problem which is currently being evaluated/con~ted.
2 Forced Reason:
Scheduled A:
Ectuipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and License Examination F:
Administrative G:
Operational Error (Explain)
H:
Other (Explain) 3 Method:
1:
Manual 2:
Manual Scram 3:
Other (Explain) 4 5
Exhibit G Instructions Exhibit I:
Same Source for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161)
DOCKET NO:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE:
PAGE 50-316 D.C.
Cook Unit 2 G.J. Costello (616) 465-5901 July 3, 1992 1 of 1 MONTHLY OPERATING ACTIVITIES JUNE 92 HIGHLIGHTS The unit entered the reporting in Mode 5 with the Reactor Coolant System filled and vented and an average temperature of 187 F.
The reactor was made critical on June 15, 1992 at 0202.
Low power physics testing was completed on June 16, 1992 at 0135.
The first entry to Mode 1 was made on June 19, 1992 at 0107.
Following the initial entry to Mode 1, the reactor power has been changed during the remainder of this reporting period as required to support the main turbine vibration evaluation and balancing efforts.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of June was 0
MWH.
DETAILS 6-5-92 2120 2210 6-8-92 0223 6-9-92 0417 6-16-92 0017 Commenced RCS heatup.
The RCS is in Mode 4.
The RCS is in Mode 3.
RCS is at no-load pressure and temperature.
The reactor is in Mode 2.
0202 6-17-92 0135 6-19-92 0107 0312 The reactor is critical first time in cycle 9.
Low power physics testing is complete.
The reactor is in Mode l.
Rolled the Main Turbine for first time.
0951 Notification to NRC to report failure of FRV-240 to close during power reduction.
For the remainder of the month efforts have been on going to balance the main turbine.
The reactor power has been changed as required to support the main turbine vibration evaluation and balancing efforts.
DOCKET NO.
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE:
PAGE 50-316 D.C.
Cook Unit 2 E. C.
Schimmel (616) 465-5901 July 7, 1992 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE June 1992 There were no major safety-related maintenance items during the month of June.