Monthly Operating Repts for Mar 1992 for DC Cook Nuclear Plant Unit 2
ML17329A456
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 03/31/1992
From: Blind A, Zygmont C
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9204210003
Download: ML17329A456 (7)


Text

ACCELERATED DIS UTION DEMONS TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

05000316 AUTH.NAME AUTHOR AFFILIATION ZYGMONT,C.B.

Indiana Michigan Power Co.

(formerly Indiana 6 Michigan Ele BLIND,A.A.

Indiana Michigan Power Co.

(formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operatin ts for Mar 1992 for DC Cook Nuclear Plant Unit 2.W/ 20410 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

D RECIPIENT ID CODE/NAME PD3-1, LA STANG,J INTERNAL: AEOD/DOA NRR/DLPQ/WPg 10

-EG~I=

EXTERNA EGGG BRYCE 1 J

~ H NSIC COPIES LTTR ENCL 3

3 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID 'CODE/NAME PD3-1 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGN3 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LIS1$ FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 14

Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 61 6 465 5901 April 10, 1992 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of March 1992 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment co NRC Region III D.R.

Hahn R.C. Callen S.

Hamming J.G.

Keppler INPO Records Center ANI Nuclear Engineering Department D.H. Williams, Jr.

E.E. Fitzpatrick R.L.

S imms W.G. Smith, Jr.

D.A. Georgantis D.W. Paul S.H. Steinhart J.L. Leichner J.A.

Isom C.B.

Zygmont E.A. Smarrella J.C. Krieger B.A. Svensson D.F. Krause E.C.

Schimmel 92042210003 920331 PDR 'DOCK 05000316 "R'DR

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-316 DATE 03-Apr-92 COMPLETED BY CB Zygmont TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 2

2. Reporting Period MAR.92
3. Licensed Thermal Power (MWt) 3411 4.

Name Plate Rating (Gross MWe) 1133

5. Design Electrical Rating (Net MWe) 1090 6.

Maximum Dependable Capacity (GROSS MWe) 1100 7.

Maximum Dependable Capacity (Net MWe) 1090 notes

8. If Changes Occur in Capacity Ratings (Items no.

3 through 7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

This Mo.

Yr.

744.0 0.0 0.0 0.0 0.0 0

0 0

0.0 0.0 0.0 0.0

11. Hours in Reporting Period 12.

No. of Hrs. Reactor Was Critical

13. Reactor Reserve Shutdown Hours 14.

Hours Generator on Line

15. Unit Reserve Shutdown Hours 16.

Gross Therm.

Energy Gen.

(MWH) 17.

Gross Elect.

Energy Gen.

(MWH)

18. Net Elect.

Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate ERR 24.

Shutdowns Scheduled over Next Six Months (Type, to Date 2184.0 1253.4 0.0 1253.1 0.0 3661695 1161610 1118492 57.4 57.4 47.0

46. 6 0.0 Date,and Cumm.

124896.0 84441.5 0.0 82853.2 0.0 256356328 83429760 80363364 67.6 67.6 61 '

60.2 12.9 Duration):

25. If Shut Down At End of Report Period, Estimated Date of Startup:

920528

26. Units in Test. Status (Prior to Commercial Operation):

Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

50-316 UNIT TWO DATE 03-Apr-92 COMPLETED BY CB Zygmont TELEPHONE 616-465-5901 DAY 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 MONTH AVERAGE DAILY POWER LEVEL MAR.92 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL

UNIT SHUTIXNNS AND PONER REDUCTIONS REEGRC MCÃI8:

March 1992 DOCKZr NO:

UNIT NAME DATE OXPIZXKD BY:

TEZZPHONE 50-316 D.C.

COOK UNIT 2 April 3, 1992 G.J. Costello (616) 465-5901 MEIHOD OF SHVIT3ZG LICENSEE DURATION IXNN EVENT SYSTEM ~NENT CAUSE AND CORRECTS ACZION TO NO DATE TYPE1 HOURS REASON2 REACloR3 REPORT NO.

CODE cODE5 PREvzm I zcmmwCE None The unit remained shutdawn for the maintenance/rmfue1ing outage through out this reporting period.

1 2

F:

Forced Reason:

S:

Scheduled A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method 1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4 5

Exhibit G Instructions Exhibit I:

Same Source for preparation of data entry sheets for Licensee Event Report (IZR) File (NUREG 0161)

DOCKET NO:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE PAGE:

50-316 D.C.

Cook Unit 2 G.J. Costello (616) 465-5901 April 3, 1992 1 of 1 MONTHLY OPERATING ACTIVITIES March 1992 HIGHLIGHTS The unit, entered the reporting period with the reactor coolant system in Mode 5, Cold Shutdown.

Mode 6, Refueling was entered on March 8, 1992 and the reactor core off loading was completed on March 17, 1992.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of March was 0

MWH.

DETAILS 3-8-92 1914 3-15-92 1928 3-17-92 2321 The RCS is in Mode 6

Commenced fuel off load from the core to the spent fuel pool Completed the core off load from the reactor vessel 3-17-92 2338 All fuel assembles are stored in the spent fuel pool

DOCKET NO:

UNIT NAME'OMPLETED BY:

TELEPHONE:

DATE:

PAGE:

50-316 D.C.

Cook Unit 2 E.C.

Schimmel (616) 465-5901 April 10, 1992 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE - March 1992 There were no major safety-related maintenance items during the month of March.