ML17329A267
| ML17329A267 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 11/13/1991 |
| From: | Blind A INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | Davis A NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9112040200 | |
| Download: ML17329A267 (63) | |
Text
ACCELERATED DIS UTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9112040200 DOC.DATE: 91/11/13 NOTARIZED: NO DOCKET FACIL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION BLIND,A.A.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Lists tests
& exams tentatively scheduled to be performed during 1992 refueling outage scheduled to begin in mid Feb 1992.List of Class 1
& 2 welds scheduled to be examined per Second 10-yr Interval Long Term Plan encl.
DISTRIBUTION CODE:
A047D COPIES RECEIVED:LTR J ENCL Q SIZE:
TITLE: OR Submittal: Inservice Inspection/Testing/Relief from ASME Code NOTES D
A RECIPIENT ID CODE/NAME PD3-1 LA COLBURN,T.
INTERNAL: NRR/DET/ECMB 9H NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB EXTERNAL: EG&G BROWN,B NRC PDR COPIES LTTR ENCL 1
0 2
'2 1
1 1
1 1
0 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD3-1 PD NRR/DET/EMEB 7E OC~~B EG FILE 01 EG&G RANSOME,C NSIC COPIES LTTR ENCL 1
1 1
1 1
0 1
1 1
1 1
1 D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
n TOTAL NUMBER OF COPIES REQUIRED:
LTTR 15 ENCL 12 D
D
b
'I
- r
6 <t ct>
Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 Donald C.
Cook Nuclear Plant Unit 2 Docket No. 50-316 License No.
SUBJECT:
UNIT 2 REFUELING OUTAGE ISI U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D. C.
20555 Attn:
A. B. Davis November 13, 1991
Dear Mr. Davis:
Pursuant to the requirements of ASME Section XI, 1983 Edition with 1983 Summer Addenda, IWA-1400(c), the following is a listing for your review of tests and examinations tentatively scheduled to be performed during the 1992, Unit 2 Refueling Outage.
The Refueling Outage is scheduled to begin mid February, 1992.
Identification of specific valves (i.e. safety valves, check valves, etc.)
can be obtained by referencing the Cook Plant Valve Test Program for the Second Ten Year Inspection Interval.
Visual inspection of the Reactor Vessel internal surfaces accessible during normal Refueling Outages.
2 ~
3
~
4 ~
5 ~
Eddy Current Testing on 64 of the tubes on two (2) steam generators.
Visual examination of disassembled check valves to check internal integrity and operability.
(Will be performed by Indiana Michigan Power personnel.)
MT and VT of Primary Manway bolting on two (2) steam generators.
(Will be performed by Indiana Michigan Power personnel.)
Setpoint Test one (1) Pressurizer Safety Valve.
(Will be performed by Wyle Labs.)
r
( (9fi2040ZOO 99fffi3
'RDR ADOCK 050003i6 iI, 0
Synopsis of Unit 2 Tests November 13, 1991 Page 2 of 2 6.
Setpoint Test five (5) Main Steam Safety Valves.
(Will be performed by the Maintenance Department.)
7.
Setpoint Test twenty-four (24) Class 2 and 3 Safety Valves.
(Will be performed by the Maintenance Department.)
8.
Thirty (30) Hydrostatic Tests of Class 1, 2, and 3 Systems.
(Will be performed by Indiana Michigan Power personnel.)
9.
UT and surface examination of Class 1 and 2 pipe welds.
(will be performed by Southwest Research Institute and Indiana Michigan Power personnel.)
10.
Visual examination of Class 1 flange bolting.
(Will be performed by Indiana Michigan Power personnel.)
11.
Visual examination of Class 1 and 2 component supports.
(Will be performed by Indiana Michigan Power personnel.)
Please see the attached listing for Class 1 and 2 welds scheduled to be examined per the Second Ten Year Interval Long Term Plan.
If there are any comments or questions or if further information is needed, please feel free to contact me at (616) 465 5901i Extension 2401.
Sincerely, A. A. Blind Plant Manager AAB/cbm Attachments co D. H. Williams, Jr.
E. E. Fitzpatrick Z. R. Padgett G. Charnoff NFEM Section Chief NRC Resident Inspector File
s I
ISIC ISI Data Management System
,s o h
INDIANA MICHIGAN POP'EA ggLE4q 0+
(
0 C
I INDIANAMICHIGAN POWER COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992)~
SECOND PERIOD, SECOND INTERVAL SCHEDULED COMPONENTS November 8,
1991 REVISION 0
Prepared By:
Reviewed By:
Approved By:
N
f DATE:" 11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 ('1992),
SECOND PERIOD, SECOND INTERVAL CLASS 1
COMPONENTS PAGE:
1
SUMMARY
EXAMINATIONAREA NUMBER IDENTIFICATION REACTOR PRESSURE VESSEL AND CLOSURE HEAD ASME SEC. XI CATGY NDE ITEM NO NETH PROCEDURE CALIBRATION BLOCK/
SIZE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS RPV INTERIOR SURFACES AND CORE SUPPORT STRUCTURES 006010 RPV UPPER INTERNALS E SURFACES B-N-1 VT-3 AREAS ACCESSIBLE DURING NORNAL B13.10 REFUELING U.
CONT.
EXAMINE EACH PERIOD.
AUGMENTED VT-1 ON BAFFLE PLATE FASTENERSIN ONE QUADRANT (90 DEG.)
OF LOVER INTERNALS'
6,'I DATE: '1/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 1
COHPONENTS PAGE:
2 PRESSURIZER FIGURE A-4
SUMMARY
EXAMINATIONAREA NUMBER IDENTIFICATION ASHE SEC. XI CATGY NDE ITEH NO HETH PROCEDURE CALIBRATION'BLOCK/
SILE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS CIRCUMFERE T AL WELDS 006500 2-PRZ-15 UPPER HEAD TO UPPER SHELL B-B UT B2.11 RV-3 B
PRESS.
DH LONGITUDINALMELDS 006900 2-PRZ-19 LONGITUDINAL SEAM B-B UT B2.12 RV-3 8
PRESS.
DH EXAMINE 1 FOOT OF WELD LENGTH NEAR HEAD.
DATE 11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 1
COHPONENTS PAGE:
3 STEAN GENERATOR NO.
21 FIGURE A-5
SUMMARY
EXANINATION AREA NUHBER IDENTIFICATION ASHE SEC. XI CATGY NDE ITEM NO METH PROCEDURE CALIBRATION BLOCK/
SIZE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS CIRCUHFERENTIAL WELDS 008600 STH-21-01 LOWER HEAD TO TUBE SHEET B-B UT B2. 40 RV-3 I
CONT.
L1 NOZZLE INSIDE RADIUS SECTIONS 008700 STH-21-I-IRS INLET NOZZLE INSIDE RADIUSSECTION B-D UT B3.140 IR-CSCL-24-DCC B
CONT.
L1 008800 STH-2'1-0-IRS OUTLET NOZZLE INSIDE RADIUS SECTION B-D UT B3.140 IR-CSCL-24-DCC B
CONT.
L1 NOZZLE TO ELBOW AND ELBOW TO NOZZLE WELDS 008900 STH-21-02 ELBOW TO INLET NOZZLE B-F PT B5.70 UT CSS/CCS-MOCKUP-36-DCC B
CONT.
L1 FULL VOLUMETRIC UT EXAMINATION REQUIRED DUE TO NRC COMMITHENT.
009000 STH-21-03 OUTLET NOZZLE TO ELBOW B-F PT B5.70 UT CSS/CCS-HOCKUP-36-DCC B
CONT.
L1 FULL VOLUMETRIC UT EXAMINATION REQUIRED DUE TO NRC COMMITMENT.
L
~Q,
~
~
DATE: '1/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 1
COMPONENTS PAGE:
4 STEAN GENERATOR NO. 22 FIGURE A-5 SUHNARY EXANINATION AREA NUMBER IDENTIFICATION ASHE SEC. X!
CATGY NDE ITEN NO METH PROCEDURE CALIBRATION BLOCK/
SIZE SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS NOZZLE TO ELBOW AND ELBOW TO NOZZLE WELDS 009800 STM-22-02 ELBOW TO INLET NOZZLE 8-F PT 85.70 UT CSS/CCS-NOCKUP-36-DCC FULL VOLUMETRIC UT EXANINATION 8
REQUIRED DUE TO NRC CONT. L2 COHHITNENT.
009900 STH-22-03 OUTLET NOZZLE TO ELBOW 8-F PT 85.70 UT CSS/CCS-MOCKUP-36-DCC FULL VOLUMETRIC UT EXAMINATION 8
REQUIRED DUE TO NRC CONT. L2 COHHITHENT.
PRESSURE RETAINING BOLTING 2'ND LESS 010320 STH-22-OHB-1 THROUGH 16 OUTLET MANWAY BOLTING 8-G-2 VT-1 B7.30 HT PERFORM MT IN ACCORDANCE WITH I.E. BULLETIN 82-02 IF BOLTING IS REHOVED.
010360 STH-22-INB-1 THROUGH 16 INLET MANWAY BOLTING 8-G-2 VT-1 87.30 HT PERFORM HT IN ACCORDANCE WITH I.E. BULLETIN 82-02 IF BOLTING IS REHOVED.
~,
'IQ
DATE 11/08/91 REVISION:
0 COOK NUCLEAR PLANT UHIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 1
COMPONENTS PAGE:
5 STEAM GENERATOR NO. 23 FIGURE'A-S
SUMMARY
EXAHINATION AREA NUHBER IDENTIFICATION ASNE SEC. XI CATGY NDE ITEH NO NETH PROCEDURE CALIBRATION BLOCK/
SIZE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS OZZLE TO ELBOW AND ELBOW TO NOZZLE WELDS 010700 STH-23-02 ELBOW TO INLET NOZZLE B-F PT B5.70 UT CSS/CCS-MOCKUP-36-DCC FULL VOLUHETRIC UT EXAMINATION B
REQUIRED DUE TO NRC CONT. L3 COHMITHENT.
010800 STH-23-03 OUTLET NOZZLE TO ELBOW B-F PT 85.70 UT CSS/CCS-MOCKUP-36-DCC FULL VOLUHETRIC UT EXANINATION B
REQUIRED DUE TO NRC CONT. L3 COHMITHENT.
PRESSURE RETAINING BOLTING 2'ND LESS 011220 STM-23-OHB-1 THROUGH 16 OUTLET HANWAY BOLTING B-G-2 VT-1 B7.30 MT PERFORM HT IN ACCORDANCE WITH I.E. BULLETIN 82-02 IF BOLTING IS REMOVED.
011260 STH-23-IHB-1 THROUGH 16 INLET HANWAY BOLTING B-G-2 VT-1 B7.30 HT PERFORM HT IN ACCORDANCE WITH I.E. BULLETIN 82-02 IF BOLTING IS REHOVED.
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD.
SECOND INTERVAL CLASS 1
CONPONENTS PAGE:
6 REACTOR COOLANT SYSTE SUHHARY EXAHINATION AREA NUHBER IDENTIFICATION ASHE SEC. XI CATGY NDE ITEN NO NETH PROCEDURE CALIBRATION BLOCK/
SIZE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE 2-RC-18 FIG NO A-7 016600 2-RC-18-01N 6-IN. NOZZLE (BRANCH CONNECTION) 8-J PT 89.31 UT 37-CCSS-X-3.0<<9-DCC B
CONT. L2 LINE 2-RC>>28 FIG NO A-17 034200 2-RC-28-22 PIPE TO TEE 8-J PT 89.11 UT 33?8027 (4-SS-120-.430)
B CONT.
PRT SCHEDULED IN RESPONSE TO NRCB 88-08 SUPP. 2.
SEE MCAP-12143 SUPP.
1 FOR AUGHENTED UT REQUIREHENTS.
')34300 2-RC-28-23 TEE TO PIPE B-J PT 89.11 UT 33?8027 (4-SS-120-.430)
B CONT.
PRT SCHEDULED IN RESPONSE TO NRCB 88-08 SUPP.
2.
SEE MCAP-12143 SUPP.
1 FOR AUGNENTED UT REQUIREHENTS.
034400 2-RC-28-24 PIPE TO ELBOW 8-J PT 89.11 UT 3378027 (4-SS-120-.430)
B CONT.
PRT SCHEDULED IN RESPONSE TO NRCB 88-08 SUPP.
2.
SEE MCAP-12143 SUPP.
1 FOR AUGNENTED UT REQUIRENENTS.
LINE 2-RC-30 FIG NO A-19 041300 2-RC-30-06 PIPE TO TEE 8-J PT 89.11 UT 33?8027 (4-SS-120-.430)
B CONT.
PRT SCHEDULED IN RESPONSE TO NRCB 88-08 SUPP.
2.
SEE MCAP-12143 SUPP.
1 FOR AUGMENTED UT REQUIREHENTS.
L I
1g
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 1
COMPONENTS VALVE PRESSURE RETAINING BOLTING 2
AND LESS SUHHARY EXAMINATIONAREA NUHBER IDENTIFICATION ASME SEC. XI CATGY NDE ITEH NO HETH PROCEDURE CALIBRATION BLOCK/
SILE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS
-SI-59 F
G NO A-36 221000 SI-161-L4 FLANGE BOLTING B-G-2 VT-1 87.70 B
CONT. L4 LINE 2-RH-33 FIG NO A-59 222500 ICH-129 FLANGE BOLTING 8-G-2 VT-1 e7.70 I
I pig
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 1
COMPONENTS PAGE:
B WALWORTH MOTOR-OPERATED GATE VALVES 8'OHINAL SUMHARY EXAHINATION AREA NUHBER IDENTIFICATION ASME SEC. XI CATGY NDE ITEH NO METH PROCEDURE CALIBRATION BLOCK/
SILE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE 2-SI-60'IG NO A-37 225300 SI-IHO-315 VALVE BODY INTERNAL SURFACE 8-H-2 VT-3 812.50 ANNULUS ONE WALWORTH GATE VALVE TO BE EXAHINED BY IEH PERSONNEL DURING THE INTERVAL.
THE CHOICE DEPENDS ON MAINTENANCE REQUIREMENTS.
LINE 2-SI-62 FIG NO A-39 225400 S I-IMO-325 VALVE BODY INTERNAL SURFACE B-H-2 VT-3 812.50 ANNULUS
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 COMPONENTS STEAH GENERATOR NO.
21 FIGURE B-1 SUHMARY EXAMINATIONAREA NUMBER IDENTIFICATION ASME SEC. XI CATGY NDE ITEM NO METH PROCEDURE CALIBRATION BLOCK/
SIZE-SCHEDULE ACCESS/
LOCATION INSTRUCTIONS NOZZLE TO SHELL AND SHELL TO NOZZLE MELDS 300070 STM-21-FUN NOZZLE TO SHELL C-B MT C2.21 UT PL-3.0-CS-22-DCC B
CONT.
L1
~
h DATE 11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND, INTERVAL CLASS 2 COMPONENTS STEAM GENERATOR NO. 24 FIGURE'-4 SUMHARY EXAHINATION AREA NUHBER IDENTIFICATION ASHE
~
SEC. XI CATGY NDE ITEN NO METH PROCEDURE CALIBRATION BLOCK/
SILE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS CIRCUHFERENTIAL WELDS 300330 STH-24-04 TUBE SHEET TO STUB BARREL C-A UT C1.30 PL-3.0-CS-22-DCC B
CONT. L4
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 COHPONENTS EGENERATIVE HEAT EXCHANGER FIGURE B-5 ASHE SEC. XI CATGY NDE SUHHARY EXAHINATIONAREA NUHBER IDENTIFICATION ITEH NO NETH PROCEDURE CALIBRATION BLOCK/
SIZE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS CIRCUHFERENTIAL WELDS 300460 RHE-2-08 CAP TO SHELl.
C-A UT C1.20 9.625-CCSS-X-1.0-2-DCC 8
REGEN HXRH 300470 RHE-2-09 SHELL TO TUBE SHEET C-A UT C1.30 9.625-CCSS-X-1.0-2-DCC B
REGEN HXRH 300520 RHE-2-21 TUBE SHEET TO SHELL C-A UT C1.30 9.625-CCSS-X-1.0-2-DCC B
REGEN HXRH 300530 RHE-2-24 SHELL TO CAP C-A UT C1.20 9.625-CCSS-X-1.0-2-DCC B
REGEN HXRH
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 COHPONENTS BORON INJECTION TANK FIGURE B-9 SUHHARY EXAHINATION AREA NUHBER IDENTIFICATION ASME SEC. XI CATGY NDE ITEH NO NETH PROCEDURE CALIBRATION BLOCK/-
SIZE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS CIRCUHFERENTI L WELDS 300850 2-BIT-B SHELL. TO UPPER HEAD C-A UT C1.20 PL-3.0-CSCL-4-DCC B
BIT RH
DATE 11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 COMPONENTS EMERGENCY CORE COOLING
SUMMARY
EXAHINATION AREA NUHBER IDENTIFICATION ASNE SEC. XI CATGY NDE ITEN NO HETH PROCEDURE CALIBRATION BLOCK/
SIIE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE 2-SI-7 FIG NO B-10 310040 2-S I-7-04S PIPE TO ELBOM C-F PT C5.21 UT 18-SS-40-.562-32-DCC L
VESTIBULE 310160 2-S I-7-16S PIPE TO ELBOM C-F PT C5.11 M RHR PPRN 310340 2-SI-7-34S PIPE TO ELBOW C-F PT C5.11 W CTS PPRH LINE 2-SI-B FIG NO B-11 310860 2-S I-8-43F PIPE TO PUMP
'C-F PT C5.11 E CTS PPRM LI E 2-SI-9 FIG NO B-12 310930 2-SI-9-07F TEE TO VALVE C-F PT C5.11 B
VESTIBULE
= LINE 2-Si-62 FIG NO B-19 8 B-2 311950 2-SI-62-03F ELBOW TO VALVE C-F PT C5.21 UT 3378029 (8-SS-160-.81)
S U. CONT.
312240 2-SI-62-30S-PL 1
THROUGH 4 PIPE LUG C-C PT C3.20 S
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 COHPONENTS EHERGENCY CORE COOLING SUHHARY EXAHINATIONAREA NUHBER IDENTIF ICATION ASHE SEC. XI CATGY NDE ITEN NO NETH PROCEDURE CALIBRATION BLOCK/
SIIE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE 2-Si-62 FIG NO B-19 R 8-2 312260 2-SI-62-31S-PL 1
THROUGH 4 PIPE LUG C-C PT C3.20 S
ANNULUS LINE 2-SI-77 FIG NO B-22 312430 2-SI-77-01F-PL 1
THROUGH 4 PIPE LUG C-C PT C3.20 ANNULUS LINE 2-SI-7 FIG NO B-24 S B-2 312750 2-SI-79-02S-PL 1
THROUGH 4 PIPE LUG C-C PT C3.20 S
ANNULUS 312770 2-SI-79-03S-PL 1
THROUGH 4 PIPE LUG C-C PT C3.20 ANNULUS LINE 2-RH-14 FIG NO B-26 313185 2-RH-14-15F-PS PIPE SUPPORT C-C PT C3.20 B
M CHG PPRH 313270 2-RH-14-23S PIPE TO ELBOM C-F PT C5.11 I
M RHR HXRH LINE 2-RH-16 FIG NO B-28 313790 2-RH-16-16S PIPE TO REDUCER C-F PT C5.11 I
E RHR HXRH
DATE 11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 CONPONENTS EHERGENCY CORE COOLING SUHNARY EXANINATION AREA NUNBER IDENTIFICATION ASNE SEC. XI CATGY NDE ITEN NO METH PROCEDURE CALIBRATION BLOCK/
SIIE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE 2-RH-18 FIG NO B-30 314130 2-RH-18-09F TEE TO PIPE C-F PT C5.11 W RHR HXRH LINE 2-RH-21 FIG NO B-33 315110 2-RH-21-08S PIPE TO FLANGE C-F PT C5.11 W RHR'HXRN LINE 2-RH-22 FIG NO B-34 315470 2-RH-22-13F ELBOW TO PIPE C-F PT C5.11 L
VESTIBULE LINE 2-RH-31 FIG NO B-37 8 B-3 316020 2-RH-31-19F ELBOW TO VALVE C-F PT C5.21 UT 3378029 (8-SS-160-.81)
I ANNULUS LINE 2-RH-32 FIG NO B-39 316040 2-RH-32-02S PIPE TO ELBOW C-F PT C5.21 UT 3378029 (8-SS-160-. 81)
I ANNULUS
1
~
f
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 COMPONENTS CHENICAL AND VOLUHE CONTROL SYSTE SUHHARY EXAHINATION AREA NUHBER IDENTIFICATION ASHE SEC. Xi CATGY NDE ITEM NO METH PROCEDURE CALIBRATION BLOCK/
SIZE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE 2-CS-79 FIG NO B-41 316190 2-CS-79-08F TEE TO PIPE C-F PT C5.11 W CHG PPRH
I a.
I
~
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 COMPONENTS CONTAINHENT SPRAY SYSTEH SUMNARY EXAHINATION AREA NUMBER IDENTIFICATION ASHE SEC. XI CATGY NDE ITEN NO METH PROCEDURE CALIBRATION BLOCK/
SIZE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE 2-CTS- 0 FIG NO B-44 316510 2-CTS-10-09S PIPE TO ELBON C-F PT C5.11 W CTS PPRH 316560 2-CTS-10-14S TEE TO ELBOW C-F PT C5.11 W CTS PPRH
l
~
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 COMPONENTS FEEDWATER SYSTEM SUHHARY EXAHINATIONAREA NUMBER IDENTIFICATION ASHE SEC. XI CATGY NDE ITEH NO NETH PROCEDURE CALIBRATION BLOCK/
SIZE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE 2-FW-71 FIG NO B-51 318520 2-FW-71-16F-PS C-C HT PIPE TO PENETRATION SEAL WELD C3.20 '
E HS ENC
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 CONPONENTS PAGE 19 MAIN STEAM SYSTEH SUMHARY EXAHINATION AREA NUHBER IDENTIFICATION ASME SEC. XI CATGY NDE ITEH NO HETH PROCEDURE CALIBRATION BLOCK/
SILE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE 2-HS-89 FIG NO B-62 320620 2-HS-89-12S-PS PENETRATION SUPPORT WELD C-C HT C3.20 B
ANNULUS LINE 2-HS-90 FIG NO B-63 320700 2-MS-90-07S TEE TO CAP C-F MT C5.21 UT 30-CS-X-1.00-38-DCC I
E HS ENC LINE 2-HS-91 FIG NO B-64 321020 2-MS-91-08F ELBOW TO PIPE C-F NT C5.21 UT 30-CS-X-1.00-38-DCC B
CONT. L2
DATE':
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 COHPONENTS PAGE:
20 MAIN STEAH ISOLATION VALVE-LINE2-HS-94 FIGURES B
ASHE SEC. Xi SUHHARY EXAMINATIONAREA CATGY NDE NUHBER IDENTIFICATION ITEM NO NETH PROCEDURE CALIBRATION BLOCK/
SiZE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS INTEGRAL ATTACHHENTS 3230TO MSIV-MRV-230-S2 C-C MT C3.40 I
U HS ENC
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 3 COMPONENTS CTS HEAT EXCHANGER WEST FIGURE B-7A
SUMMARY
EXAHINATION AREA NUHBER IDENTIF ICATION ASME SEC. Xl CATGY NDE ITEM NO METH PROCEDURE CALIBRATION BLOCK/
SILE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS INTEGRALLY WELDED VESSEL SUPPORTS 400040 W-CTSHEX-1VS VESSEL SUPPORT D-B VT-3 D2.20 W CTS HXRM 400070 W-CTSHEX-4VS VESSEL SUPPORT D-B VT-3 D2.20 W CTS HXRM
~
~
~
~
h 1'
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 1
COHPONENTS REACTOR COOLANT SYSTEM SUHMARY EXAMINATIONAREA NUMBER IDENTIFICATION ASHE SEC. XI CATGY NDE ITEM NO METH PROCEDURE CALIBRATION BLOCK/
SIZE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE 2-RC-28 FIG NO A-17 600400 2-GRC-R-500 REV. 3 PIPE SUPPORT COMPONENT F-C VT-3 F3.00 S
CONT.
PRT 600500 2-GRC-R-521 REV. 2 PIPE SUPPORT COHPONENT F-B VT-3 F2.00 B
CONT.
PRT 600600 2-GRC-R-502 REV.
1 PIPE SUPPORT COMPONENT F-B VT-3 F2.00 B
CONT.
PRT 600700 2-GRC-R-524 REV. 2 PIPE SUPPORT COMPONENT F-B VT-3 F2.00 B
CONT.
PRT 600800 2-GRC-R-503 REV. 2 PIPE SUPPORT COMPONENT F-B VT-3 F2.00 B
CONT.
PRT 600900 2-GRC-V-505 REV.
1 PIPE SUPPORT COMPONENT F-C VT-3 F3.00 VT-4 B
CONT.
PRT 601000 2-GRC-R-621 REV. 3 PIPE SUPPORT COMPONENT F-8 VT-3 F2.00 B
CONT.
PRT 601100 2-GRC-C-515 REV.
1 PIPE SUPPORT COHPONENT F-C VT-3 F3.00 VT-4 S
PRESS.
~
~
DATE:
11/08/91 REVISION:
COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 1
COHPONENTS REACTOR COOLANT SYSTEH
SUMMARY
EXAMINATIONAREA NUMBER IDENTIFICATION ASNE SEC. XI CATGY NDE ITEH NO METH PROCEDURE CALIBRATION BLOCK/
SILE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE
-RC-28 FIG NO A-17A 601200 2-ARC-R-5228 REV.
1 PIPE SUPPORT COHPONENT F-8 VT-3 F2.00 S
PRESS.
601400 2-GRC-C-519 REV. 2 PIPE SUPPORT COMPONENT F-C VT-3 F3.00 VT-4 PRESS.
DH LINE 2-RC-34 FIG NO A-23A 604400 2-GRC-R-565 REV.
1 PIPE SUPPORT COMPONENT F-C VT-3 F3.00 B
CONT. L4 604500 2-GRC-R-563 REV.
1 PIPE SUPPORT COMPONENT F-B VT-3 F2.00 S
CONT. L4 LINE 2-RC-512 FIG NO A-24 604700 2-GRC-R-545 REV. 3 PIPE SUPPORT COMPONENT F-8 VT-3 F2.00 B
CONT.
L1 604800 2-GRC-R-544 REV. 2 PIPE SUPPORT COMPONENT F-8 VT-3 F2.00 B
CONT.
L1 LINE 2-RC-5 3 FIG NO A-25 604850 2-GRC-R-542 REV.
1 PIPE SUPPORT COMPONENT F-8 VT-3 F2.00 8
CONT.
L1
DATE:
11/08/9'l AEVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTEAVAL CLASS 1
COHPONENTS REACTOR COOLANT SYSTE SUHHARY EXAHINATION AREA NUHBER IDENTIFICATION ASHE SEC. XI CATGY NDE ITEN NO HETH PROCEDURE CALIBRATION BLOCK/
SIZE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE 2-RC-514 FIG NO A-26 604900 2-GRC-R-561 REV.
1 PIPE SUPPORT COHPONENT F-8 VT-3 F2.00 8
CONT. L2 605000 2-GAC-R-560 AEV. 2 PIPE SUPPORT COHPONENT F-8 VT-3 F2.00 8
CONT. L2 LINE 2-RC-516 FIG NO A-28 605200 2-ARC-R-662 REV. 0 PIPE SUPPORT COHPONENT F-C VT-3 F3.00 S
CONT.
L3 605300 2-GRC-R-581 REV. 3 PIPE SUPPORT COMPONENT F-8 VT-3 F2.00 8
CONT. L3 605400 2-GRC-R-580 REV. 2 PIPE SUPPOAT COHPONENT F-8 VT-3 F2.00 8
CONT. L3 LINE 2-RC-517 FIG NO A-29
'05490 2-ARC-L-661 REV. 0 PIPE AESTRAINT COHPONENT F-C VT-3 F3.00 S
CONT. L3 605500 2-GRC-R-579 REV. 4 PIPE SUPPORT COHPONENT F-8 VT-3 F2.00 8
CONT. L3
~
~
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 1
COMPONENTS PAGE:
25 REACTOR COOLANT SYSTEN SUMHARY EXANINATION AREA NUHBER IDENTIFICATION ASHE SEC. XI CATGY NDE ITEH NO METH PROCEDURE CALIBRATION BLOCK/
S12E-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE 2-RC-519 FIG NO A-31 605600 2-GRC-R-569 REV. 2 PIPE SUPPORT COHPONENT F-B VT-3 F2.00 B
CONT. L4 LINE 2-RC-525 FIG NO A-32 605?00 2-ARC-R-551 REV. 2 PIPE SUPPORT COMPONENT F-B VT-3 F2.00 B
CONT. L4
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 1
COHPONENTS EMERGENCY CORE COOLING SUHHARY EXAHINATIONAREA NUMBER IDENTIFICATION ASHE SEC. XI CATGY NDE ITEM NO NETH PROCEDURE CALIBRATION BLOCK/
SIZE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE 2-SI-567 FIG NO A-42 607800 2-GS I-R-698 REV. 2 PIPE SUPPORT COHPONENT F-B VT-3 F2.00
'S CONT. L4 607900 2-GSI-R-697 REV.
1 PIPE SUPPORT COMPONENT F-8 VT-3 F2.00 S
CONT. L4 607950 '-GSI-V-696 REV.
1 PIPE SUPPORT COHPONENT F-C VT-3 F3.00 VT-4 S
CONT. L4
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 1
COMPONENTS PAGE:
27 CHEMICAL AND VOLUH CONT OL SYSTE SUHHARY EXAMINATIONAREA NUHBER IDENTIFICATION ASHE SEC. XI CATGY NDE ITEM NO HETH PROCEDURE CALIBRATION BLOCK/
SIIE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE 2-CS-119 FIG NO A-46 609205 2-GCS-R-511 REV. 2 PIPE SUPPORT COMPONENT F-8 VT-3 F2.00 I
CONT. L4 609210 2-GCS-R-529 REV. 2 PIPE SUPPORT COHPONENT F-B VT-3 F2.00 B
CONT.
PRT LINE 2-CS-68 FIG NO A-49 609245 2-GCS-R-515 REV. 2 PIPE SUPPORT COMPONENT F-B VT-3 F2.00 B
REGEN HXRM 609250 2-GCS-R-601 REV.
1 PIPE SUPPORT COMPONENT F-B VT-3 F2.00 8
REGEN HXRH 609255 2-GCS-R-507 REV. 2 PIPE SUPPORT COHPONENT F-B VT-3 F2.00 B'ONT. L4 609260 2-GCS-R-600 REV. 3 PIPE SUPPORT COHPONENT F-B VT-3 F2.00 8
CONT.
t r
~
~
I l
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 CONPONENTS SUHNARY EXAHINATION AREA NUNBER IDENTIFICATION REGENERATIVE HEAT EXCHANGER FIGURE B-5 ASNE SEC. XI CATGY NDE ITEN NO NETH PROCEDURE CALIBRATION BLOCK/
SIIE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS SUP ORT COHPONEN 700010 CS<<1 BRACKET F-C VT-3 F3.00 REGEN HXRN 700020 CS-2 BRACKET F-C VT-3 F3.00 REGEN HXRN
?00030 CS-3 BRACKET F-C VT-3 F3.00 REGEN HXRN 700040 CS-4 BRACKET F-C VT-3 F3.00 REGEN HXRN
~
~
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 COMPONENTS CHEMICAL AND VOLUME CONTROL TANK FIGURE B-6 SUNMARY EXANINATION AREA NUNBER IDENTIFICATION ASME SEC. XI CATGY NDE ITEN NO METH PROCEDURE CALIBRATION BLOCK/
SIZE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS SUP 0 CO OMEN 700100 2-CVCT-SC-C F-B VT-3 F2.00 VCT RN
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE
.OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 COMPONENTS PAGE:
30 RHR HEAT EXCHANGER EAST FIGURE B-8 SUHMARY EXAHINATIONAREA NUMBER IDENTIFICATION ASME SEC. XI CATGY NDE ITEM NO METH PROCEDURE CALIBRATION BLOCK/
SIZE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS SUPPORT COHPONENT 700160 E-RHRHEX-SC-2 F-B VT-3 F2.00 E
RHR HXRM
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 CONPONENTS EHERGENCY CORE COOLING SUHNARY EXAMINATIONAREA NUHBER IDENTIFICATION ASHE SEC. XI CATGY NDE ITEM NO NETH PROCEDURE CALIBRATION BLOCK/
SILE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE 2 SI 7 FIG NO 8- 0 710100 2-GRH-L-34 REV. 5 PIPE SUPPORT COMPONENT F-8 VT-3 F2.00 I
W RHR PPRH 710120 2-GRH-L-35 REV. 4 F-C VT-3 PIPE RESTRAINT COHPONENT
,F3.00 I
W RHR PPRH 710155 2-GCTS-L-68 REV. 4 PIPE SUPPORT COMPONENT F-8 VT-3 F2.00 L
VESTIBULE LINE 2-SI-8 FIG NO 8 11 710530 2-GCTS-R-70 REV. 3 PIPE SUPPORT CONPONENT F-8 VT-3 F2.00 E CTS PPRH 710540 2-GCTS-R-72 REV.6 PIPE SUPPORT COHPONENT F-8 VT-3 F2.00 E CTS PPRH LINE 2-RH-14 FIG NO 8-26 713090 2-GRH-R-19 REV. 3 PIPE SUPPORT COHPONENT F-C VT-3 F3.00 8
W CHG PPRN LINE 2-RH-15 FIG NO 8-27 713285 2-GRH-V-9 REV. 3 PIPE SUPPORT CONPONENT F-C VT-3 F3.00 VT-4 8
E RHR PPRH
I A
p DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 COHPONENTS EHERGENCY CORE COOLING SUHNARY EXAHINATION AREA NUNBER IDENTIFICATION ASHE SEC. XI CATGY NDE ITEN NO HETH PROCEDURE CALIBRATION BLOCK/
SIIE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE 2-R -15 FIG NO B-27
?133M 2-GRH-R-11 REV. 3 PIPE SUPPORT COHPONENT 1
F-C VT-3 F3.00 B
E CHG PPRN 713310 2-GRH-V-13 REV. 2 PIPE SUPPORT CONPONENT F-C VT-3 F3.00 VT-4 I
E RHR HXRH 7'13320 2-GRH-R-14 REV. 3 PIPE SUPPORT COHPONENT F-8 VT-3 F2.00 I
E RHR HXRH LINE 2-RH-17 IG NO B-2 713430 2-GRH-V-801 REV.
1 PIPE SUPPORT COHPONENT F-C VT-3 F3.00 VT-4 S
VESTIBULE LINE 2-RH-18 FIG NO B-30
?13860 2<<GCTS-V-42 REV ~ 2 PIPE SUPPORT COHPONENT F-C VT-3 F3.00 VT-4 W RHR HXRH 713870 2-GCTS-L<<43 REV. 2 PIPE SUPPORT CONPONENT F-B VT-3 F2.00 W RHR HXRN 713880 2-GCTS-L-44 REV. 2 PIPE SUPPORT COHPONENT F-B VT-3 F2.00 W RHR HXRH
a>
~
~
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIODS SECOND INTERVAL CLASS 2 COHPONENTS PAGE:
33 EHERGENCY CORE COOLING SUNHARY EXAHINATION AREA NUHBER IDENTIFICATION ASHE SEC. XI CATGY NDE ITEH NO HETH PROCEDURE CALIBRATION BLOCK/
SIIE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS L NE 2-RH-18 IG NO 6-30 713900 2-GCTS-R-45 REV.
5 PIPE SUPPORT COMPONENT F-B VT-3 F2.00 L
VESTIBULE 713940 2-GCTS-R-46 REV. 4 PIPE SUPPORT COHPONENT F-B VT-3 F2.00 L
VESTIBULE 713965 2-GCTS-L-47 REV.
5 PIPE SUPPORT COMPONENT F-8 VT-3 F2.00 L
VESTIBULE 713970 2-GCTS-R-48 REV. 4 PIPE SUPPORT CONPONENT F-B VT-3 F2.00 L
VESTIBULE 713985 2-GCTS-L-49 REV. 4 PIPE SUPPORT COMPONENT F-B VT-3 F2.00 L
VESTIBULE 714000 2-GCTS-R-50 REV. 4 PIPE SUPPORT COMPONENT F-8 VT-3 F2.00 L
VESTIBULE LINE 2-RH-19 FIG NO 6-31 714120 2-GCTS-V-54 REV.
1 PIPE SUPPORT COMPONENT F-C VT-3 F3 ~ 00 VT-4 S
E RHR HXRM 714140 2-GCTS-L-55 REV. 3 PIPE SUPPORT COMPONENT F-8 VT-3 F2.00 E
RHR HXRH
'ATh:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 COMPONENTS PAGE:
34 EHERGENCY CORE COOLING
SUMMARY
EXAHINATIONAREA NUHBER IDENTIFICATION ASHE SEC. XI CATGY NDE ITEN NO METH PROCEDURE CALIBRATION BLOCK/
SIZE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE 2-RH-19 FIG NO B-31 714180 2-GCTS-R-57 REV.
1 PIPE SUPPORT COMPONENT F-B VT-3 F2.00 E
RHR HXRH 714205 2-GCTS-R-58 REV. 3 PIPE SUPPORT CONPONENT F-C VT-3 F3.00 L
VESTIBULE 714260 2-GCTS-L-59 REV. 3 PIPE SUPPORT COMPONENT F-B VT-3 F2.00 L
VESTIBULE 714280 2-GCTS-R-60 REV. 2 PIPE SUPPORT COHPONENT F-C VT-3 F3.00 L
VESTIBULE
DATE:
11/OS/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 COMPONENTS PAGE:
35 CHEHICAL AND VOLUME CONTROL SYSTEH SUMNARY EXAHINATIONAREA NUMBER IDENTIFICATION ASME SEC. XI CATGY NDE ITEN NO NETH PROCEDURE CALIBRATION BLOCK/
SIZE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE 2-CS-79 FIG NO B-41 715430 2-GCS-R-94 REV.4 PIPE SUPPORT COMPONENT F-C VT-3 F3.00 VT-4 U CHG PPRN 715440 2-GCS-R-32 REV.4 PIPE SUPPORT COMPONENT F-B VT-3
, F2.00 E
CHG PPRN LINE 2-CS-80 FIG NO B-42 715450 2-GCS-V-95 REV. 3 PIPE SUPPORT COMPONENT F-C VT-3 F3.00 VT-4 E CHG PPRM
~
t4l V
0
>it. ~
IQ
~
~
yq DATE:
11/OB/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 COHPONENTS PAGE:
36 CONTAINHENT SPRAY SYS E
SUHMARY EXAHINATION AREA NUMBER IDENTIFICATION ASHE SEC. XI CATGY NDE ITEH NO METH PROCEDURE CALIBRATION BLOCK/
SIZE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LI E 2-CTS-10 FIG 0 B-44 715585 2-GCTS-R-1 REV. 3 PIPE SUPPORT COMPONENT F-B VT-3 F2.00 II CTS PPRH LINE 2-CTS-12 FIG NO B-46 716045 2-GCTS-R-16 REV. 7 PIPE SUPPORT COHPONENT l
F-B VT-3 F2.00 W CTS HXRH 716065 2-GCTS-R-17 REV.
7 PIPE SUPPORT COHPONENT F-B VT-3 F2.00 N CTS HXRH 716070 2-GCTS-R-31 REV.
5 PIPE SUPPORT COMPONENT F-B VT-3 F2.00 L
VESTIBULE 716080 2-GCTS-R-32 REV. 6 PIPE SUPPORT COMPONENT F-B VT-3 F2.00 L
VESTIBULE 716095 2-GCTS-R-32A REV.
5 PIPE SUPPORT COHPONENT F-8 VT-3 F2.00 L
VESTIBULE LI E 2-CTS-13 FIG NO B-47 716215 2-GCTS-V-6 REV. 3 PIPE SUPPORT COHPONENT F-C VT-3 F3.00 VT-4 E CTS PPRM
'DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOMD INTERVAL CLASS 2 COHPONENTS-PAGE:
37 CONTAINHENT SPRAY SYSTEN SUHMARY EXAMINATIONAREA NUMBER IDENTIFICATION ASNE SEC. XI CATGY NDE ITEH NO NETH PROCEDURE CALIBRATION BLOCK/
SILE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE
-CTS-13 IG 0 8-47 716230 2-GCTS-R-7 REV. 4 PIPE SUPPORT COMPONENT F-8 VT-3 F2.00 E CTS PPRM 716240 2-GCTS-L-8 REV. 4 PIPE SUPPORT COHPONENT F-8 VT-3 F2.00 E CTS PPRN 716270 2-ACTS-L-BA REV.
1 PIPE SUPPORT COMPONENT F-8 VT-3 F2.00 E CTS PPRN
'716275 2-ACTS-R-7A REV. 2 PIPE RESTRAINT COHPONENT F-8 VT-3 F2.00 E CTS PPRH 716310 2-GCTS-R-10 REV. 3 PIPE SUPPORT COMPONENT F-8 VT-3 F2.00 E CTS PPRN 716315 2-ACTS-R-108 REV. 0 PIPE RESTRAINT CONPONENT F-C VT-3 F3.00 E CTS HXRN 716355 2-GCTS-V-11 REV.
1 PIPE SUPPORT CONPONENT F-C VT-3 F3.00 VT-4 E CTS HXRN 716385 2-GCTS-V-12 REV. 2 PIPE SUPPORT COMPONENT F-C VT-3 F3.00 VT-4 E CTS HXRH
I
< ~
h
'bATt.:
11/08/91
, REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 COMPONENTS PAGE:
38 FEEDWATER SYSTE SUHHARY EXAMINATIONAREA NUMBER IDENTIFICATION ASHE SEC. XI CATGY NDE ITEH NO METH PROCEDURE CALIBRATION BLOCK/
SILE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE 2-FW-70 FIG NO B-50 750400 2-GFW-V-870 REV. 0 PIPE RESTRAINT COMPONENT F-C VT-3 F3.00 VT-4 S
E MS ENC 750500 2-GFW-L-871 REV. 0 PIPE RESTRAINT COMPONENT F-C VT-3 F3.00 I
E HS ENC 750600 2-FW-70-HANGER PIPE RESTRAINT COHPONENT F-8 VT-3 F2.00 I
E MS ENC ADDITIONALHANGER, NO I.D.
NUHBER.
SEE AEP DWG.
NO.
1-2-3952A.
LINE 2-FW-72 FIG NO B 52 751300 2-GFW-L-878 REV. 0 PIPE RESTRAINT COHPONENT F-B VT-3 F2.00 I
MS ACC 75'1400 2-GFW-V879 REV. 0 PIPE RESTRAINT COMPONENT F-C VT-3 F3.00 VT-4 MS ACC 751500 2-GFW-L-880 REV. 0 PIPE RESTRAINT COMPONENT F-C VT-3 F3.00 S
NS ACC 751600 2-GFW-V-881 REV.
1 PIPE RESTRAINT COHPONENT F-C VT-3 F3.00 VT-4 S
MS ACC 751700 2-GFW-L-882 REV.
1 PIPE RESTRAINT COMPONENT F-B VT-3 F2.00 8
HS ACC
- 1) ~
'ATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 CONPONENTS'AGE:
39 FEEDMATER SYSTE SUNHARY EXANINATION AREA NUNBER IDENTIFICATION ASHE SEC. XI CATGY NDE ITEN NO NETH PROCEDURE CALIBRATION BLOCK/
SILE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS IN 2-FM-72 FIG NO B-52 7517'lS 2-FM-72-ROD HANGER PIPE RESTRAINT CONPONENT F-8 VT-3 F2.00 S
NS ACC LINE 2 FW 74 FIG NO B-54 753200 2-FM-H-2 REV. 2 PIPE SUPPORT CONPONENT F-C VT-3 F3.00 VT-4 S
CONT. L2 LINE 2-FW-75 FIG NO B-55 753800 2-FM-H-3 REV. 2 PIPE SUPPORT COMPONENT F-C VT-3 F3.00 VT-4 S
CONT. L3 LINE 2-FM-76 FIG NO B-56 754600 2-FM-H-4 REV. 2 PIPE SUPPORT COHPONENT F-C VT-3 F3.00 VT-4 S
CONT. L4 LIN 2-FM-79 FIG NO B-59 756300 2-GFW-R-841 REV.
1 PIPE RESTRAINT CONPONENT r
F-8 VT-3 F2.00 E HS ENC 756400 2-GFM-R-840 REV.
1 PIPE RESTRAINT CONPONENT F-B VT-3 F2.00 E NS ENC 756500 2-GFW-L-839 REV. 0 PIPE RESTRAINT COHPONENT F-B VT-3 F2.00 I
E MS ENC
'I0 c
~
't r'c
V~
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 COMPONENTS PAGE:
40 AIN STEAM SYSTE SUHHARY EXAHINATION AREA NUMBER IDENTIFICATION ASHE SEC. XI CATGY NDE ITEH NO NETH PROCEDURE CALIBRATION BLOCK/
SILE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LINE 2-HS-89 FIG NO B-62
'757400 2-HSH-1 REV. 2 PIPE SUPPORT COMPONENT F-C VT-3 F3. 00 VT-4 B
CONT.
L1 LINE 2-MS-91 FIG NO B-64 759200 2-HSH-2 REV. 2 PIPE SUPPORT COMPONENT F-C VT-3 F3.00 VT-4 B
CONT. L2 LINE 2-HS-92 FIG NO B-65 759500 2-NS-92-05F-PS REV. 2 PIPE SUPPORT COMPONENT F-B VT-3 F2.00 I
W HS ENC 759600 2-HS-92-07S-PS REV. 2 PIPE SUPPORT COMPONENT F-8 VT-3 F2.00 I
W HS ENC
, HAIN STEAM ISOLATION VALVE-LINE2-MS-92 FIG NO B-65 8-76 759700 MSIV-HRV-220-S1 REV. 2 VALVE SUPPORT COMPONENT F-B VT-3 F2.00 I
W HS ENC INE 2-HS-93 FIG NO B-66 760600 2-MSS-5 REV. 2 PIPE RESTRAINT COMPONENT F-C VT-3 F3.00 VT-4 CONT. L3 LINE 2-HS-94 FIG'NO B-67 760700 2-HS-94-07S-PS REV. 2 PIPE SUPPORT COMPONENT F-8 VT-3 F2.00 I
W MS ENC
~
~
DATE:
11/08/91 REVISION:
0 COOK NUCLEAR PLANT UNIT 2 INSERVICE IMSPECTION SCHEDULE OUTAGE 2 (1992),
SECOND PERIOD, SECOND INTERVAL CLASS 2 COMPONENTS N S A
SYSTE SUHMARY EXAHINATION AREA NUHBER IDENTIFICATION ASHE SEC. XI CATGY NDE ITEM NO METH PROCEDURE CALIBRATION BLOCK/
SIZE-SCHEDULE-ACCESS/
LOCATION INSTRUCTIONS LIN 2-HS-94 FIG NO B-67 760&00 2-HS-94-0&S-PS REV. 2 PIPE SUPPORT COMPONENT F-B VT-3 F2.00 I
N HS ENC LINE 2-HS-193 FIG NO B-70 762200 2-GMS-V-1154 REV. 3 PIPE SUPPORT COMPONENT F-C VT-3 F3.00 VT-4 I
E HS ENC LINE 2-HS-194 FIG NO B-71 762300 2-GHS-V-1155 REV. 3 PIPE SUPPORT COMPONENT F-C VT-3 F3.00 VT-4 I
E HS ENC LINE 2-HS-195 FIG NO B-7 762400 2-GHS-L-1158 REV. 2 PIPE SUPPORT COHPONENT F-B VT-3 F2.00 B
U HS ENC 762600 2-GMS-V-1156 REV.
1 PIPE SUPPORT COMPONENT F-C VT-3 F3.00 VT-4 W HS ENC
0