ML17329A252

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1991 for DC Cook Unit 1.W/
ML17329A252
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/31/1991
From: Blind A, Gillett W
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9111190016
Download: ML17329A252 (7)


Text

ACCELERATED DISTRIBUTION DEMONSTPA.TION SYSTEM 4'p' REGULATORY INFORMATXON DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9111190016 DOC.DATE: 91/10/31 NOTARIZED: NO DOCKET g

FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 AUTH.NAME AUTHOR AFFILIATION GILLETT,W.T.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele BLIND,A.A.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION R

SUBJECT:

Monthly operating rept for Oct 1991 for DC Cook Unit 1.W/

911106 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR J ENCL I

SIZE:

TXTLE: Monthly Operating Report (per Tech Specs)

NOTES:

D RECIPIENT ID CODE/NAME PD3-1 LA COLBURN,T.

INTERNAL: AEOD/DOA NRR/DJ Pg/QPEB10 R G~F

~ E~--

1 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 3

3 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD3-1 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGN3 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 D

D R

D NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 14

Indiana Michigan~

Power Company ~

Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 November 6, 1991 INWSLNA NECKEGQN PQSFM U.S. Nuclear Regulatory Commission ATTN:

Document. Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of October 1991 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment co NRC Region III D.R. Hahn R.C. Callen S.

Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department D.H. Williams, Jr.

E.E. Fitzpatrick R.L.

Simms J.J.

Markowsky D.A. Timberlake D.W. Paul T.O. Argenta S.H. Steinhart J.L. Leichner J.A.

Isom W.T. Gillett E.A. Smarrella J.C. Krieger B.A. Svensson D.F. Krause E. C. Schimmel

~GOOg Zj 9111-190016 91103i PDR=

ADOCK 050003l5 R

PDR

N.R.C.

OPERATING DATA REPORT DOCKET NO..

50-315 DATE 04-Nov-91 COMPLETED BY WT GILLETT TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D. C.

Cook Unit 1

2. Reporting Period OCT.91
3. Licensed Thermal Power (MWt) 3250 4.

Name Plate Rating (Gross MWe) 1152

5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity (GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000 notes
8. If Changes Occur in Capacity Ratings (Items no.

3 through 7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe)

10. Reasons For Restrictions. If Any:

ll. Hours in Reporting Period 12.

No. of Hrs. Reactor Was Critical

13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Therm.

Energy Gen.

(MWH)

17. Gross Elect.

Energy Gen.

(MWH)

18. Net Elect.

Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Six None This Mo.

Yr. to Date 745.0 7296.0 745.0 6290 '

0.0 0 ~ 0 745.0 6063.2 0.0 0.0 2410148 19007225 774800 6082630 747353 5859877

~ 100. 0 83 '

100.0 83.1 98.3 78 '

97.4 78.2 0.0 3.6 Months (Type, Date,and Cumm ~

147552.0 109677.3

~ 463 '

107692.0 321 0

314436873 102213860 98293350 74 '

74 '

66.3 64 '

6.9 Duration)

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

50-315 UNIT ONE DATE 04-Nov-91 COMPLETED BY WT GILLETT TELEPHONE 616-465-5901 DAY 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 MONTH AVERAGE DAILY POWER LEVEL 999 1003 999 1006 988 1004 1001 1004 1004 1002 1000 1005 1004 1005 1004 1005 OCT.91 DAY 17 18 19 20 21 22 23 24-25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL 1007 1005 1008 1008 1006 1008 1007 1011 1009 1002 1004 1005 1004 1011 1011

UNIT SH:HGDNNS AND PON1% REIXJCTIONS REPORT MMK: Octo'ber 1991 DOCKEZ NO'NIT QME GATE CCMPL'ET') BY:

'ItZZPK5E:

50-315 D.C. mOK UNIT 1 Nov~ 6, 1991 E.C. Schimmel (616) 465-5901 MEIHOD OF S1K2ZI!ING IZCENSEE IXRATION DOWN EVER SYSTEM CCMK51ÃZ CAUSE AND OOBRECZIVE ACTION TO, NO.

DATE TYPE HOURS RZASON2 REACIOR3 REPORT NO.

mDE mDE5 PR1Vzm REZORImcE None

'Ihere were no unit shubiawns or significant power reductions fmm the imdmum power level of 100% during the 1

2 F:

Forced Reason:

S:

Scheduled A:

Equipnezrh Failure (Explain)

C:

Refueling D:

Regulatory Restriction E:

Operator Train~

License 1~mination F:

Achnini:~tive G:

Operational Error (Explain)

H:

Other (Explain) 3 Method 1:

Hanml 2:

Manual Scram 3:

Aubxatic Scram 4

Otler (Explain) 4 5

ExtUbit G Instructions Exhibit I:

Same Source for preparation of data entry sheets for Licensee Event Report (IZR) File (NUREG 0161)

~

V

~

I DOCKET NO~

UNIT NAME~

COMPLETED BY:

TELEPHONE:

DATE:

PAGE0 50-315 D.C.

Cook Unit 1 E.C.

Schimmel (616) 465-5901 November 6, 1991 1 of 1 MONTHLY OPERATING ACTIVITIES - October 1991 HIGHLIGHTS The unit entered the reporting period at 99.5% RTP. Unit power was decreased to 944 RTP starting 0040 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> on 911005 for main turbine control valve testing. Unit power was restored to 100% RTP at 0815 hours0.00943 days <br />0.226 hours <br />0.00135 weeks <br />3.101075e-4 months <br /> on 911005.

The unit exited the reporting period at 1004 RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of October was 774800 MWH.

DETAILS 10/05/91 0040 0200 0440 0815 Commenced unit power decrease to 94% RTP for main turbine control valve testing.

The unit is at 94% RTP.

Commenced unit power increase to 1004 RTP.

The unit is at 1004 RTP.

o v

DOCKET NO UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE:

PAGE 50-315 D.C.

Cook Unit 1 E.C.

Schimmel (616) 465-5901 November 6, 1991 1 of 1 K47OR SAFETY-RELATED MAINTENANCE October 1991 There were no major safety-related maintenance items during the month of October.