ML17329A127
| ML17329A127 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 07/31/1991 |
| From: | Blind A, Gillett W INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9108210052 | |
| Download: ML17329A127 (9) | |
Text
ACCELERATED DIPIBUTION DEMON~ON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9108210052 DOC.DATE: 91/07/31 NOTARIZED: NO DOCKET g
FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana 6
05000315 AUTH.NAME AUTHOR AFFILIATION GILLETT,W.T.
BLIND,A.A.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for July 1991 for DC Cook Nuclear Plant.W/910808 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specks NOTES RECIPIENT ID CODE/NAME PD3-1 LA COLBURN,T.
INTERNAL: AEOD/DOA NRR/D~LQ/~B10 1L~
1 EXTERNAL: EGGG BRYCE,J.H NSIC COPIES LTTR ENCL 3
3 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD3-1 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGN3 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
R D
NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 14
~ Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 August 8, 1991 ENEMAMSl NSCNIGQM PQUPM U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of July 1991 is submitted.
Respectfully, A.A. Blind Plant Manager Attachment co NRC Region III D.R.
Hahn EPRI Nuclear Safety Analysis Center R.C. Callen S.
Hamming J.G.
Keppler INPO Records Center ANI Nuclear Engineering Department D.H. Williams, Jr.
E.E. Fitzpatrick, J.F.
Kurgan J.J.
Markowsky D.A. Timberlake D.W. Paul T.O. Argenta S.H. Steinhart J.L. Leichner J.A. Isom W.T. Gillett E.A. Smarrella J.C. Krieger B.A. Svensson D.F. Krause E.C.
Schimmel 9108210052 91073i PDR AGOCK 05000315 R
FDR
N.R.C.
OPERATING DATA REPORT DOCKET NO ~
50-315 DATE 1-AUG-91 COMPLETED BY WT GILLETT TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit 1
- 2. Reporting Period JULY 1991
- 3. Licensed Thermal Power (MWt) 3250 4.
Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1020 6.
Maximum Dependable Capacity (GROSS MWe) 1056 7.
Maximum Dependable Capacity (Net MWe) 1000 notes
- 8. If Changes Occur in Capacity Ratings (Xtems no.
3 through
- 7) Since Last Report;; Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
See asterics>>
below.
11.
12.
13.
14
~
-15.
16.
17
~
18.
19.
20.
21
'2.
23.
24.
Hours in Reporting Period No. of Hrs. Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator on Line Unit, Reserve Shutdown Hours Gross Therm.
Energy Gen.
(MWH)
Gross Elect.
Energy Gen.
(MWH)
Net Elect.
Energy Gen.
(MWH)
Unit', Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)
Unit Capacity Facto (DER Net)
Unit Forced Outage Rate Shutdowns Scheduled over Next Six None This Mo.
Yr. to Date 744.0 5087.0 744.0 4168.7 0.0 0.0 744.0 3952.5 0.0 0.0 2394216 12314498 755010 3953870 727310 3808706 100.0 77.7 100.0 77.7 95.8 73.4 94.9
- 72. /
0.0 3.2 Months (Type, Date,and Cumm.
145343. 0 107555.7 463.0 105581.3 321.0 307744146 100085100 96242179 73 '
73.7 65.9 64.0
6.9 Duration)
- 25. If Shut.
Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast INITIALCRXTICALXTY INITIALELECTRICITY COMMERCXAL OPERATION Achieved
+ Item No. 5:
Design Electrical Rating (DER) NET MRe has been changed effective July 1, 1991.
This reduction is the result of the steam condenser tube replacement with stainless steel tubes, which cause a
high turbine exhaust pressure.
+ Item No. 7:
Maximum dependable capacity (MDC) NET MNe, effective July 1, 1991, will be 1000, during the period from May through October and 1020 during the period from November through April.
These NET ratings and capabilities reflect historical data on generating capability due to changes in lake water temperature.
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
50-315 UNIT ONE DATE Ol-Aug-91 COMPLETED BY WT GILLETT TELEPHONE 616-465-5901 MONTH JUL. 91 DAY
.1 2
3 4
5 6
7 8
9 10 11 12 13 14 15 16 AVERAGE DAILY POWER LEVEL 975 974 972 970 965 966 976 974 980 978 989 989 989 996 988 975 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL 980 960 974 971 971 969 968 975 975 983 981 980 983 995 984
UNIT SHUTDONNS AND POWER REEXJCTIONS REPORT MONTH: July 1991 DOCKET NO:
UNIT NAME:
DATE:
CKX!!PE'TED BY:
TEXZZEONE 50-315 D.C.
COOK UNIT 1 A~ 8, 1991 E.C. Schimmel (616) 465-5901 M"IHOD OF SHIJITENG LICENSEE IX3RATION DOWN EVENT SYSTEM CCMPONEPZ CMJSE AND CORREXTDlE ACTION TO NO.
IRTE TYPE HOURS REASON REACIQR REEORT NO.
CODE CODE PREVEFZ RFAXHREKCE None
'Ihere were no unit shutdowns or significant pcarer reductions frm the maximum @carer level of 100~ during the month.
1 2
F:
Forced Reason:
S:
Scheduled A:
Ecuipment Failure (Explain)
C:
Refueling D:
ReyQatory Restriction E:
Operator Training and License 1~mination F:
Achninistrative G:
Operational Error (Explain)
H:
Other (Explain) 3 Method':
Manual 2:
M'anual Scram 3:
Automatic Scrm 4:
Other (Explain) 4 5
Exhibit G - Instructions Exhibit I:
Same Source for preparation of data entry sheets for Licensee Event Report (IZR) File (NUREG 0161)
DOCKET NO:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE PAGE 50-315 D.C.
Cook Unit 1 E. C.
Schimmel (616) 465-5901 August 8, 1991 1 of 1 MONTHLY OPERATING ACTIVITIES - Jul 1991 HIGHLIGHTS The unit entered the reporting period at.
100% RTP. Unit power was reduced to 93% RTP beginning 2205 hours0.0255 days <br />0.613 hours <br />0.00365 weeks <br />8.390025e-4 months <br /> on 910705 for main turbine control valve testing.
The unit was restored to 100%
RTP at 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> on 910706.
Minor unit power reductions (1 to 2%) were experienced beginning 910714 due to increased condenser back pressure caused by elevated lake temperatures.
The main turbine control valves were being maintained at 1004 open.
The power levels ranged between 984 and 99% RTP through the end of the month.
The unit exited the reporting period at 994 RTP.
Gross electrical generation for the month of July was 755010 MWH.
DETAILS 07/05/91 2205 2345 07/06/91 0210 0500 Commenced unit power reduction to 93%
RTP for main turbine control valve testing.
The unit is at 93% RTP.
Commenced unit power increase to 1004 RTP.
The unit is at 100% RTP.
DOCKET NO:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE:
PAGE'0-315 D.C.
Cook Unit 1 E.C.
Schimmel (616) 465-5901 August 8, 1991 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE Jul 1991 There were no major safety-related maintenance items during the month of July.
~
~