UNITED STATES NUCLEAR R EG ULATORY COMMISSION WASHINGTON, D. C. 20555 January 19, 1990 Docket Nos. 50-315/316 Hr. IIilton Alexich Indiana Yiichigan Power Company c/o American Electric Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43216
Dear Nr. Alexich:
SUBJECT:
REVIEW OF 60-DAY RESPONSE TO GENERIC LETTER 88-20, INDIVIDUAL PLANT EXANINATIONS (IPE)
(TAC NOS.
74398 AND 74399)
Re:
Donald C. Cook, Nuclear Plant Units I and 2
Generic Letter 88-20 requires, in part, that each operating reactor licenseq and construction permit holder:
(1) identify the approach and method selected for performing the IPE, (2) describe the method to be used, and (3) identify the schedule for performing the IPE and submitting the results to the NRC.
This information was to be submitted to the NRC within 60 days of issuance of Supplement I of the generic letter.
We have reviewed your letter dated October 24, 1989, submitted in response to the reporting requirements of the generic letter.
We conclude that your IPE approach, IIiethodology, and schedule are acceptable.
The NRC will accept one submittal for both units provided that the differences arid dependencies between units are appropriately addressed in the IPE.
In addition, it is expected that you will use prudent judgment in the use of a previously completed PRA by accounting for any plant-specific differences between your unit(s) and the proposed referenced PRA(s).
We anticipate that any possible additional analysis or reporting requirements, such as those from external events or from the Containment Performance Improvement
- Program, wi 11 not have any adverse effect on your schedule.
However, if your schedule should change, please notify the NRC of the proposed change and the reason for the change.
It should be noted, that the purpose of the IPE process is not to address and resolve issues that focus on rules previously issued (see NUREG-1335, Appendix C, Section 14.3).
Resolution of issues that are specifically related to rules; for example, 10 CFR; 50.44(c) are to be resolved outside of the IPE revieii process.
Primarily, your IPE review should focus on identifying those improvements which should be made to reduce the risk from severe accidents.
900i290i76 900ii9 PDR ADOCK 050003i5 P
PDC ZFo(
(I o Should you have any questions concerning the requirements of the generic letter, please contact Hr. michael L. Boyle, VRR at (301) 492-1308 or Nr. John H. Flack, RES at (301) 492-3979.
Sincer ely, cc:
See next page Joseph G. Giitter, Project l1anager Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects Office of Nuclear Reactor Regulation
Mr'. Milton Alexich Indiana Michigan Power Company Donald C.
Cook Nuclear Plant CC:
Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attorney General Department of Attorney General 525 West Ottawa Street Lansing, Michigan 48913 Township Supervisor Lake Township Hall Post Office Box 818 Bridgman, Michigan 49106 Al Blind, Plant Manager Donald C.
Cook Nuclear Plant Post Office Box 458 Bridgman, Michigan 49106 U.S. Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensville, V.ichigan 49127 Gerald Charnoff, Esquire Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.
Washington, DC 20037 Mayor, City of Bridgman Post Office Box 366 Bridgman, Michigan 49106 Special Assistant to the Governor Poom 1 - State Capitol Lansing, Michigan 48909 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health Department of Public Health 3500 N. Logan Street Post Office Box 30035 Lansing, Michigan 48909 Mr. S.
Brewer American Electric Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43216
Should you have any questions concerning the requirements -of the, generic letter, please contact Mr. Michael L. Boyle, NRR at (301) 492-1308 or Mr. John H. Flack, RfS at (301) 492-3979.
Sincerely, cc:
See next page DISTRIBUTION:
I Docket File NRC t Local PDRs PD31 Reading JZwolinski PShuttleworth JGiitter OGC fJordan ACRS(10)
MBoyle JFlack Joseph G. Giitter, Project Manager Project Directorate III-1 Division of Reactor Projects III, IV, V 8 Special Projects Office of Nuclear Reactor Regulation LA/P031:DRSP %~PM/P031 ORSP PSHUTTLEHDRTH J
1/jg/90 1
/90
(
D31: DRSP T
1 it'0
0 j
f h"
h q
e t I
T "lt
>I "I
44 (I ~
'h I I '
t t
1 l
4f
,I g ~
- I f