ML17328A474
| ML17328A474 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 09/30/1990 |
| From: | Blind A, Gillett W INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9010160054 | |
| Download: ML17328A474 (7) | |
Text
.ACCELERATED DIUBUTION DEMONS'TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9010160054 DOC.DATE: 90/09/30 NOTARIZED: NO DOCKET FACIL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana 05000316 AUTH.NAME AUTHOR AFFILIATION GILLETT,W.T.
(formerly Indiana
& Michigan Ele BLIND,A.A.
(formerly Indiana
& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Sept 1990 for DC Cook Nuclear Plant Unit 2.W/901004 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES D
RECIPIENT ID CODE/NAME PD3-1 LA COLBURN,T.
COPIES LTTR ENCL 3
3 1
1 RECIPIENT ID CODE/NAME PD3-1 PD COPIES LTTR ENCL 1
1 D
INTERNAL: AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 RGN3 1
1 2
2 1
1 1
1 AEOD/DSP/TPAB 1
1 NRRJ D~RQ/
10 1
EG FILE 1
1 D
EXTERNAL: EG&G BRYCE,J.H NSIC 1
1 1
1 NRC PDR 1
1 I
D S
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 16 ENCL 16 D
D
Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 October 4, 1990 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of September 1990 is submitted.
Respectfully, z,o A.A. Blind Plant Manager Attachment ci B.A.
NRC D.R.
EPRI R.C.
S.L.
J.G.
M.P.
J.F.
J.J.
D.A.
D.W.
T.O.
S.H.
J.A.
W.T.
E.A.
J.C.
E.C.
Svensson Region III Hahn Nuclear Safety Analysis Center Callen Hall Keppler Records Center uclear Engineering Department Williams, Jr.
Alexich Kurgan Markowsky Timberlake Paul Argenta Steinhart Isom Gillett Smarrella Krieger Schimmel 9010160054 900'P-0 PDR 'DOCK 050003kb R
N-R.C.
OPERATING DATA REPORT DOCKET NO.
50-316 DATE 01-Oct-90 COMPLETED BY WT GILLETT TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit 2
- 2. Reporting Period SEP 90
- 3. Licensed Thermal Power (MWt) 3411 4.
Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1100 6.
Maximum Dependable Capacity (GROSS MWe) 1100 7.
Maximum Dependable Capacity (Net MWe) 1060 notes
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through
- 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
11
'2
'3' l4.
15
'6.
17
'8.
19.
20.
21
~
22.
23
'4.
This Mo.
Yr. to Date Hours in Reporting Period 720.0 6551.0 No. of Hrs. Reactor Was Critical 0 ~ 0 3788.5 Reactor Reserve Shutdown Hours 0.0 0.0 Hours Generator on Line 0'.0 3770.2 Unit Reserve Shutdown Hours 0.0
~
'.0 Gross Therm.
Energy Gen.
(MWH) 0 12062932 Gross Elect.
Energy Gen.
(MWH) 0 39402'50 Net Elect.
Energy Gen.
(MWH) 0 3802660 Unit Service Factor 0.0 57.6 Unit Availability Factor 0.0 57.6 Unit Capacity Factor (MDC Net) 0.0 54.8 Unit Capacity Factor (DER Net) 0.0 52 '
Unit Forced Outage Rate ERR 10.1 Shutdowns Scheduled over Next Six Months (Type, Date,and Cumm.
111743.0 73964.5 0 '
'72499.7
- '0.0 222940822 72736360 70048318 66.3 66.3 60.4 58.8 13 '
Duration):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
October 14 1990
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
50-316 UNIT TWO DATE 02-Oct-90 COMPLETED BY WT GILLETT TELEPHONE 616-465-5901 DAY 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 MONTH AVERAGE DAILY POWER LEVEL 0
00, 0
0 0
0 0
0 0
0 0
0 0
0 0
SEP 90 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 AVERAGE DAILY POWER LEVEL 0
0 0
0 0
0 0
0 0
0 0
0 0
0
UNIT SHUIDOWNS AND POWER EUZKKTIONS REPORT MOÃIH:
September 1990 DOCKlK'O:
UNIT NAME DATE:
COMEKZZED BY:
TEUPHONE 50-316 D.C.
COOK UNIT 2 October 6, 1990 E.C. SchiIttmel (616) 465-5901 METHOD OF SHKLTING LICENSEE IX1RATION DOWN EVEÃZ SYSTEM CCHPONEÃZ CAUSE AND CORRZCTIVE ACTION TO NO.
DATE TYPE1 HOURS ERSON REACIOR REPORT NO CODE CODE5 PREVENT REKX1RR1XCE 209 900630 S
(Con't) 720 N/A ZZZZZZ
%he unit was removed fram service at 0225 hours0.0026 days <br />0.0625 hours <br />3.720238e-4 weeks <br />8.56125e-5 months <br /> on 900630 for the Cycle 7-8 Refueling Outage. At the end of the month, the unit was in made 5, cold shutdawn, with the reactor coolant sy.tern filland vent procedure in progress 1
2 F
Forced Rein:
S:
Scheduled A:
Ecpipment Failure (Explain)
C:
Refueling D:
Regulatory Restriction E:
Operator Training and License lamination F:
Adnuni~~tive G:
Operational Error (Explain)
H:
Other (Explain) 3 Method 1:
Manual 2:
Manual Scram 3:
Other (Explain) 4 5
Ihdubit G Instructions Ihddhit I:
Same Saurce for preparation of data entry sheets for Licensee Event Report (LER) File (NUE HG 0161)
DOCKET NO:
UNIT NAME:
COMPLETED BY:
TELEPHONE DATE:
PAGE:
50-316 D.C.
Cook Unit 2 E.C.
Schimmel (616) 465-5901 October 4, 1990 1 of 1 MONTHLY OPERATING ACTIVITIES Se tember 1990 HIGHLIGHTS The unit, entered the reporting period in mode 6 with the reactor core unloaded.
Fuel loading commenced at 0306 hours0.00354 days <br />0.085 hours <br />5.059524e-4 weeks <br />1.16433e-4 months <br /> on September 2,
1990. Fuel reloading was complete at. 0853 hours0.00987 days <br />0.237 hours <br />0.00141 weeks <br />3.245665e-4 months <br /> on September 4,
1990.
The unit entered mode 5 at 1155 hours0.0134 days <br />0.321 hours <br />0.00191 weeks <br />4.394775e-4 months <br /> on September 14, 1990.
The reactor coolant system was drained to reduced inventory beginning 2110 hours0.0244 days <br />0.586 hours <br />0.00349 weeks <br />8.02855e-4 months <br /> on September 24, 1990 to complete maintenance activities on reactor coolant pump f13.
Reactor coolant system reduced inventory was exited at 1359 hours0.0157 days <br />0.378 hours <br />0.00225 weeks <br />5.170995e-4 months <br /> on September 29, 1990.
The unit exited the reporting period in mode 5.
Gross electrical generation for the month of August was 0 MWH.
DETAILS 09/02/90 0306 09/02/90 0333 09/04/90 0853 09/14/90 1155 09/24/90 2110 09/25/90 0413 09/29/90 1313 1359 Commenced reactor core fuel reload.
The unit is in mode 6.
Fuel reloading is complete.
The unit is in mode 5.
Commenced draining the reactor coolant system to reduced inventory.
The reactor coolant system is at reduced inventory to perform maintenance activities on the g13 reactor coolant pump.
Commenced refilling the reactor coolant system.
Reactor coolant system reduced inventory status is exited.
DOCKET NO:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE:
PAGE'0-316 D.C.
Cook Unit 2 E.C.
Schimmel (616) 465-5901 October 4, 1990 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE Se tember 1990 Replaced the rotor and seals on the east centrifugal charging pump.
Replaced the motor on 2-QM0-452, the reactor coolant system letdown volume control tank to chemical and volume control system charging pump train B shutoff valve.
Replaced the valve stem and disc on 2-IMO-222, the west containment spray pump to spray additive eductor shutoff valve.