Forwards SALP Repts 50-315/89-01 & 50-316/89-01 for Mar 1988 - June 1989
ML17328A116
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/31/1989
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Alexich M
AMERICAN ELECTRIC POWER SERVICE CORP.
Shared Package
ML17328A117 List:
References
NUDOCS 8909080183
Download: ML17328A116 (4)


See also: IR 05000315/1989001

Text

RECIPIENT

ID CODE/NAME

PD3-1 LA

GIITTER~J.

COPIES

LTTR ENCL

1

0

1

1

RECXPIENT

ID CODE/NAME

PD3-1

PD

COPIES

LTTR ENCL

1

1

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8909080183

DOC.DATE: 89/08/31

NOTARIZED: NO

DOCKET

FACXL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana

&

05000315

50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana

&

05000316

AUTH.NAME

AUTHOR AFFILIATION

DAVIS,A B

Region 3, Ofc of the Director

RECIP.NAME

RECIPIENT AFFXLIATXON

ALEXICH,M.P.

American Electric Power Service Corp.

SUMECT: Forwards

SALP Repts 50-315/89-01

& 50-316/89-01 for

880301-890630

'ISTRIBUTION

CODE'.

XE40D

COPXES RECEIVED:LTR

ENCL

SIZE:

TITLE: Systematic

Assessment

of Licensee

Performance

(SALP) Report

NOTES:

9

8

A

INTERNAL: AEOD/DOA

COMMXSSION

NRR SHANKMAN,S

NRR/DLPQ/PEB 10

NRR/DREP/EPB

10

NRR/DRXS DIR 9A

NRR/DRXS/SIB 9A

NUDOCS ABSTRACT

OGC/HDS1

RGN3 'ILE

01

EXTERNAL

L ST LOBBY WARD

NRC PDR

1

1

5

5

1

1

1

1

1

1

1

1

1

1'

1

1

1

1

1

1

1

1

1

AEOD/DSP/TPAB

DEDRO

NRR/DLPQ/HFB 10

NRR/DOEA/EAB 11

NRR/DREP/RPB

10

NRR/DRIS/SGB

9D

NRR/PMAS/XLRB12

OE~XR

REG FILE

02~

LPDR

NSIC

1

1

1

1

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

.TOTAL NUMBER OF COPIES

REQUIRED: LTTR'1

ENCL

30

'

~0u'

pC

n0

pJ ~

C

0

C

O~

ly

o~

+o*e+

UNITED STATES

NUCLEAR REGULATORY COINMISSION

RMION III

7$ $ ROOSKVKLT ROAD

OI CN CLLYN, ILLINOIS 40137

AUG v'

(gQg

Docket No. 50-315

Docket No. 50-316

American Electric Power Service

Corporation

Indiana Michigan Power Company

ATTN:

Mr. Milton P. Alexich

Vice President

Nuclear Operations Division

1 Riverside Plaza

Columbus,

OH

43216

Gentlemen:

Enclosed for your review, prior to our scheduled

meeting

on September

26,

1989,

is the

SALP 8 Board Report for the Donald

C.

Cook Nuclear Generating

Plant,

covering the period from March 1,

1988 through June 30,

1989.

In accord with NRC policy, I have reviewed the

SALP Board Assessment

and concur

with their ratings.

It is my view that the conduct of nuclear activities in

connection with the O.C. Cook facility shows

an appropriate

concern for nuclear

safety.

Although the current performance

has

improved

as

compared to previous

SALP periods, I believe

O.C.

Cook needs to maintain its effort to sustain this

long-term improving trend in order to achieve

superior performance.

Highlights

of the report are set forth below:

'1.

The assessment

of performance of D.C. Cook indicated six .Category

2

ratings

and two Category

1 ratings.

There were

no areas of decline since

the previous

SALP Report.

2.

The area of Plant Operations

received

a Category

1 rating which is an

improvement from the Category

2 and improving rating received during

the previous

SALP period.

This improvement

was largely a result of a

reduction in enforcement,

a reduced

number of events,

and overall conservative

operating philosophy.

However, this is not a strong Category

1 rating;

therefore,

your continued attention in this functional area is appropriate

and needed.

3.

The area of Emergency

Preparedness

received

a Category

1 rating which is

an improvement from the Category

2 rating received during the previous

SALP period based

on good or improving performance

in all facets of this

functional area.

8909080i83 89083i

PDR

ADOCK 050003i5

9

PDC

American Electric Power Service

Corporation

AUG'

1989

4.

There were occasions

during this assessment

period when the licensee

failed to evaluate root causes

when addressing

problems

and only performed

root cause

analysis after

NRC prompting.

These

instances

indicate

a need

for more extensive evaluation in approaching

operational

decisions.

5.

In view of the large

number of contractor personnel

at D.C. Cook and the

plant problems contributed

by this group, greater control appears

appropriate.

While you will have sufficient opportunity *to present your comments at the

meeting

on September

26, 1989,

we also solicit written comments within 30 days

after the meeting.

Your comments,

a summary of our meeting,

and

my disposition

of your comments will be issued

as

an Appendix to the enclosed

SALP Board

Report.

In accordance

with Section

2.790 of the NRC's "Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and the

SALP Board

Report will be placed in the NRC's Public Document

Room.

Should you have any questions

concerning

the

SALP Report,

we would be pleased

to discuss. them with you.

Sincerely,

zg&R=

A. Bert Davis

Regional Administrator

Enclosure:

SALP 8 Board Report

Nos. 50-315/89001;

50-316/89001

cc w/enclosure:

, Plant Manager

Licensin

ee Management

Branch

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service

Commission

EIS Coordinator,

USEPA

Region

5 Office

American Electric Power

Ser vice

Corporati on..

Distribution Cont'd

Michigan Department, of

Public Health

J.

M. Taylor,

DEOR

T. E. Morley, Director,

NRR

K. M. Carr,

Chairman

K. C. Rogers,

Commissioner

J.

R. Curtiss,

Commissioner

T. M. Roberts,

Commissioner

J. 0. Thoma,

NRR, Acting Director,

Project Directorate III"1

J.

G. Giitter,

NRR Project Manager

J.

Lieberman, Director, Office

of Enforcement

E.

M. McKenna,

SALP Coordinator,

NRR

J.

F. Mechselberger,

NRR

RIII PRR

State Liaison Officer, State

Of Michigan

INPO

L. A. Reyes,. RII

M. J.

Pearson,

RIII