ML17328A116
| ML17328A116 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 08/31/1989 |
| From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Alexich M AMERICAN ELECTRIC POWER SERVICE CORP. |
| Shared Package | |
| ML17328A117 | List: |
| References | |
| NUDOCS 8909080183 | |
| Download: ML17328A116 (4) | |
See also: IR 05000315/1989001
Text
RECIPIENT
ID CODE/NAME
PD3-1 LA
GIITTER~J.
COPIES
LTTR ENCL
1
0
1
1
RECXPIENT
ID CODE/NAME
PD3-1
COPIES
LTTR ENCL
1
1
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8909080183
DOC.DATE: 89/08/31
NOTARIZED: NO
DOCKET
FACXL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana
&
05000315
50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana
&
05000316
AUTH.NAME
AUTHOR AFFILIATION
DAVIS,A B
Region 3, Ofc of the Director
RECIP.NAME
RECIPIENT AFFXLIATXON
ALEXICH,M.P.
American Electric Power Service Corp.
SUMECT: Forwards
SALP Repts 50-315/89-01
& 50-316/89-01 for
880301-890630
'ISTRIBUTION
CODE'.
XE40D
COPXES RECEIVED:LTR
ENCL
SIZE:
TITLE: Systematic
Assessment
of Licensee
Performance
(SALP) Report
NOTES:
9
8
A
INTERNAL: AEOD/DOA
COMMXSSION
NRR SHANKMAN,S
NRR/DLPQ/PEB 10
NRR/DREP/EPB
10
NRR/DRXS DIR 9A
NRR/DRXS/SIB 9A
NUDOCS ABSTRACT
OGC/HDS1
RGN3 'ILE
01
EXTERNAL
L ST LOBBY WARD
NRC PDR
1
1
5
5
1
1
1
1
1
1
1
1
1
1'
1
1
1
1
1
1
1
1
1
AEOD/DSP/TPAB
DEDRO
NRR/DLPQ/HFB 10
NRR/DOEA/EAB 11
NRR/DREP/RPB
10
NRR/DRIS/SGB
9D
NRR/PMAS/XLRB12
OE~XR
REG FILE
02~
LPDR
1
1
1
1
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
.TOTAL NUMBER OF COPIES
REQUIRED: LTTR'1
ENCL
30
'
~0u'
pC
n0
pJ ~
C
0
C
O~
ly
o~
+o*e+
UNITED STATES
NUCLEAR REGULATORY COINMISSION
RMION III
7$ $ ROOSKVKLT ROAD
AUG v'
(gQg
Docket No. 50-315
Docket No. 50-316
American Electric Power Service
Corporation
Indiana Michigan Power Company
ATTN:
Mr. Milton P. Alexich
Vice President
Nuclear Operations Division
1 Riverside Plaza
Columbus,
OH
43216
Gentlemen:
Enclosed for your review, prior to our scheduled
meeting
on September
26,
1989,
is the
SALP 8 Board Report for the Donald
C.
Cook Nuclear Generating
Plant,
covering the period from March 1,
1988 through June 30,
1989.
In accord with NRC policy, I have reviewed the
SALP Board Assessment
and concur
with their ratings.
It is my view that the conduct of nuclear activities in
connection with the O.C. Cook facility shows
an appropriate
concern for nuclear
safety.
Although the current performance
has
improved
as
compared to previous
SALP periods, I believe
O.C.
Cook needs to maintain its effort to sustain this
long-term improving trend in order to achieve
superior performance.
Highlights
of the report are set forth below:
'1.
The assessment
of performance of D.C. Cook indicated six .Category
2
ratings
and two Category
1 ratings.
There were
no areas of decline since
the previous
SALP Report.
2.
The area of Plant Operations
received
a Category
1 rating which is an
improvement from the Category
2 and improving rating received during
the previous
SALP period.
This improvement
was largely a result of a
reduction in enforcement,
a reduced
number of events,
and overall conservative
operating philosophy.
However, this is not a strong Category
1 rating;
therefore,
your continued attention in this functional area is appropriate
and needed.
3.
The area of Emergency
Preparedness
received
a Category
1 rating which is
an improvement from the Category
2 rating received during the previous
SALP period based
on good or improving performance
in all facets of this
functional area.
8909080i83 89083i
ADOCK 050003i5
9
American Electric Power Service
Corporation
AUG'
1989
4.
There were occasions
during this assessment
period when the licensee
failed to evaluate root causes
when addressing
problems
and only performed
root cause
analysis after
NRC prompting.
These
instances
indicate
a need
for more extensive evaluation in approaching
operational
decisions.
5.
In view of the large
number of contractor personnel
at D.C. Cook and the
plant problems contributed
by this group, greater control appears
appropriate.
While you will have sufficient opportunity *to present your comments at the
meeting
on September
26, 1989,
we also solicit written comments within 30 days
after the meeting.
Your comments,
a summary of our meeting,
and
my disposition
of your comments will be issued
as
an Appendix to the enclosed
SALP Board
Report.
In accordance
with Section
2.790 of the NRC's "Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and the
SALP Board
Report will be placed in the NRC's Public Document
Room.
Should you have any questions
concerning
the
SALP Report,
we would be pleased
to discuss. them with you.
Sincerely,
zg&R=
A. Bert Davis
Regional Administrator
Enclosure:
SALP 8 Board Report
Nos. 50-315/89001;
50-316/89001
cc w/enclosure:
, Plant Manager
Licensin
ee Management
Branch
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service
Commission
EIS Coordinator,
USEPA
Region
5 Office
American Electric Power
Ser vice
Corporati on..
Distribution Cont'd
Michigan Department, of
Public Health
J.
M. Taylor,
DEOR
T. E. Morley, Director,
K. M. Carr,
Chairman
K. C. Rogers,
Commissioner
J.
R. Curtiss,
Commissioner
T. M. Roberts,
Commissioner
J. 0. Thoma,
NRR, Acting Director,
Project Directorate III"1
J.
G. Giitter,
NRR Project Manager
J.
Lieberman, Director, Office
of Enforcement
E.
M. McKenna,
SALP Coordinator,
J.
F. Mechselberger,
RIII PRR
State Liaison Officer, State
Of Michigan
L. A. Reyes,. RII
M. J.
Pearson,
RIII