Forwards Safety Evaluation Accepting Design Proposed for Meeting ATWS Requirements in 10CFR50.62.Acceptance Subj to Satisfactory Completion of Isolation Device Qualification Testing
ML17326B596
Person / Time
Site: Cook  
Issue date: 04/14/1989
From: Stang J
Office of Nuclear Reactor Regulation
To: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML17326B597 List:
References
TAC-59082, TAC-59083, NUDOCS 8904210297
Download: ML17326B596 (7)


Text

et gp,S RfQyq CI

~

~ Vp Cy A.0O

+

0

/p %**yW UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 April 14, 1989 Dockets Nos.

50-315 and 50-316 Mr. Hilton P. Alexich, Yice President Indiana Michigan Power Company c/o American Electric Power Service Corporation 1 Riverside Plaza

Columbus, Ohio 43216

SUBJECT:

DONALD C.

COOK NUCLEAR PLANT NOS.

1 AND 2, COMPLIANCE WITH ATWS RULE 10 CFR 50.62 (TAC NO. 59082 AND 59083)

On July 26, 1984, 10 CFR 50.62 "Requirements for Reduction of Risk from Anticipated Transients Without Scram" (ATWS) rule became effective.

Paragraph (c)(6) required 'licensee's to provide information on their compliance with the ATWS rule.

By.letters dated November 7, 1986, June 25, October 28, December 18, 1987, and March 31, 1988, Indiana Michigan Power Company

( IMPC) provided responses in accordance with paragraph (c)(6) on how D.

C.

Cook Nuclear 'Plant'Vnits 1 and 2

meet the requirements of the ATWS rule.

The staff has completed its review of the submittals.

Enclosed is our Safety Evaluation.

Based on our Safety Evaluation, the staff concludes that the design proposed by IMPC for the D. C.

Cook Nuclear Plants for meeting the requirements of 10 CFR 50.62 is acceptable.

The staff's conclusion is further subject to satisfactory completion of isolation device qualification testing, which IMPC committed to perform by letter dated Hay 2, 1988.

The ATWS mitigating system actuation circuitry (AHSAC) should not be declared operational prior to satisfactory completion of isolation device qualification testing.

When the testing is completed please provide the results to the NRC.

--jiy04210297 890414 PDR ADOCK 050003l5 P

PDC pl IJ

The staff is generically reviewing the ATWS requirements to determine to what extent Technical Specifications are appropriate.

The staff will provide guidance regarding the Technical Specification requirements for AMSAC at a

later date.

Until staff review is completed regarding the use of Technical Specifications for ATWS requirements, the licensee should continue with the scheduled installation and implementation (planned operation) of the ATWS design utilizing administratively controlled procedures.

This completes the staff's review of TAC Nos.

59082 and 59083.

Sincerely,

Enclosure:

As stated Original Signed by John Stang, Project Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V 8 Special Projects

, DISTRIBUTION

'OCKET'ILE+

NRC 8 LOCAL PDRs PD31 GRAY FILE GHOLAHAN MVIRGILO RINGRAM JSTANG OGC EJORDAN BGRIMES ACRS(10)

LA/PD31: DRSP PSHUTTLEWOR f/ /I/89

/

31: DRSP T

89 7

031: DR T

U 4

/89

~ C m

'1

'l h

qS,<

'a

,l tl

The staff is generically reviewing the ATWS requirements to determine to what extent Technical Specifications are appropriate.

The staff will provide guidance regar ding the Technical Specification requirements for AMSAC at a later date.

Until staff review is completed regarding the use of Technical Specifications for ATWS requirements, the licensee should continue with the scheduled installation and implementation (planned operation) of the ATWS design utilizing administratively controlled procedures.

This completes the staff's review of TAC Nos.

59082 and 59083.

Sincerely,

Enclosure:

As stated Original Signed by John Stang, Project Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V 8 Special Projects DISTRIBUTION DOCKET FILE NRC 8

LOCAL PDRs P031 GRAY FILE GHOLAHAN MVIRGILO RINGRAM JSTANG OGC EJORDAN BGRIMES ACRS(10)

LA/PD31: DRSP PSHUTTLEMOR f////89

/

31: DRSP T

/89 7

> D31: DR

//'89

The staff is generically reviewing the ATWS requirements to determine to what extent Technical Specifications are appropriate.

The staff will provide guidance regarding the Technical Specification requirements for ANSAC at a later date.

Until staff review is completed regarding the use of Technical Specifications for ATWS requirements, the licensee should continue with the scheduled installation 'and implementation (planned operation) of the ATMS design utilizing administratively controlled procedures.

This completes the staff's review of TAC Nos.

59082 and 59083.

Sincerely,

Enclosures:

As stated ohn Stang, Project Manager Project Directorate III-1 Division of Reactor Projects - III, IY, V 8 Special Projects

Mr. Milton Alexich Indiana Michigan Power Company Donald C.

Cook Nuclear Plant CC:

Regional Administrator, Region III U.S.

Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attorney General Department of Attorney General 525 West Ottawa Street Lansing, Michigan 48913 Township Supervisor Lake Township Hall Post Office Box 818 Bridgeman, Michigan 49106 W.

G. Smith, Jr., Plant Manager Donald C.

Cook Nuclear Plant Post Office Box 458 Br idgman, Michigan 49106 U.S. Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensvil le, Michigan 49127 Gerald Charnoff, Esquire

Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.

Washington, DC 20037 Mayor, City of Bridgeman Post Office Box 366 Bridgeman, Michigan 49106 Special Assistant to the Governor Room 1 - State Capitol Lansing, Michigan 48909 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health Department of Public Health 3500 N.

Logan Street Post Office Box 30035 Lansing, Michigan 48909 Mr.

S.

Brewer American Electric Power Service Corporation 1 Riverside Plaza

Columbus, Ohio 43216