Text
ATTACHMENT 2 TO AEP:NRC:0956 PROPOSED CHANGES TO THE DONALD C.
COOK NUCLEAR PLANT UNITS 1 AND 2 TECHNICAL SPECIFICATIONS 8902010122 890127 PDR ADOCK 05000315 P
TABLE 3.3-13 Rad oactive Gaseous Effluent Monitorin I strumentatio Instrument Instrument Minimum Channels
~Oe able A
1icabil it ec22ON 1.
Waste Gas Holdup System Explosive Gas Monitoring System
- a. Hydrogen Monitor (QC-31) b.
Oxygen Monitor (QC-31, QC-370)
(1)
(2) 30 29 2.
Condenser Evacuation System a.
Noble Gas Activity Monitor (SRA-1905) b.
Flow Rate Monitor (SFR-401)
(1-MR-054 and/or SRA-'1910)
(1)
(1)
(1) 28 27 27 3.
Unit Vent, Auxiliary Building Ventilation System a.
Noble Gas Activity Monitor (VRS-1505)
- b. Iodine Sampler Cartridge for VRS-1503
- c. Particulate Sampler Filter for VRS-1501
- d. Effluent System Flow Rate Measuring Device (VFR-315)
(1-MR-054 and/or VRS-1510) e.
Sampler Flow Rate Measuring Device (VFS-1521) 28 32 32 27 27 27 Containment Purge System a.
Aux. Building Vent.
System Noble Gas Activity Monitor (VRS-1505)
- b. Aux. Building Vent.
System Particulate Sampler for VRS-1501 5.
Waste Gas Holdup System a.
Noble Gas Activity Monitor Providing Alarm and Termination of Gas Decay Tank Releases (VRS-1505)'x**
2 31 32 33 6.
Gland Seal Exhaust a.
Noble Gas Activity Monitor (SRA-1805) b.
Flow Rate Monitor (SFR-201)
(1-MR-054 and/or SRA 1810)
D.
C.
COOK - UNIT 1 (1)
(1)
(1) 3/4 3-63 Amendment No.
28 27 27
TABLE 3.3-13 (Cont.)
At all times
- During waste gas holdup system operation (treatment for primary system gases)
- ~**Duringreleases via this pathway.
1For purge purposes only, see Technical Specifications 3.3.3.10, Table 3.3-13 and Table 4.3-9 (Items 3.a, 5.a in both tables) for non-purging requirements associated with this instrument.
2For gas decay tank releases
- only, see Item 3 (Unit Vent, Auxiliary Building Ventilation System) for additional requirements.
3The waste gas holdup system explosive gas monitoring system may be inoperable for up to 160 days on a one-time basis for the purpose of replacing one hydrogen and one oxygen monitor.
During this time grab samples for both hydrogen and oxygen are to be taken and analyzed every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
COOK NUCLEAR PLANT - UNIT 1 3/4 3-64 AMENDMENT NO.
TABLE 4.3-9 ad oactive Gaseous E f uent o
to Surve'lla ce Re uireme ts Ins ume tat o Instrument Instrument e
CHANNEL CHANNEL SOURCE CHANNEL FUNCTIONAL CHECK CHECK CALIBRATION TEST 1.
Waste Gas Holdup System Explosive Gas Monitoring System
- a. Hydrogen****
Monitor (QC-31)
- b. Oxygen****
Monitor (QC-31) c.
Oxygen Monitor (Alt.,QC-370)
D***
D***
D***
NA NA Q(3)
Q(4)
Q(4) 2.
Condenser Evacuation System a.
Noble Gas Activity Monitor (SRA-1905) b.
System Effluent Flow Rate (SFR-401, 1-MR-054, SRA-1910)
Dx*
D**
R(2)
R Q(1)
- 3. Auxiliary Building Ventilation System a.
Noble Gas Activity Monitor (VRS-1505)
- b. Iodine Sampler (For VRS-1503)
- c. Particulate Sampler (For VRS-1501) d.
System Effluent Flow Rate Measurement Device (VFR-315, 1 -MR-054, VRS e.
Sampler Flow Rate Measurement Device (VFS-1521)
D*
-1510)
D*
NA NA R(2)
NA NA Q(l)
NA NA
- 4. Containment Purge System a.
Aux. Building Vent.
System Noble Gas Activity Monitor (VRS-1505)
- b. Aux. Building Vent.
System Particulate Sampler (For VRS-1501)
D**
NA R(2)
NA Q(1)
NA
- 5. Waste Gas Holdup System a.
Noble Gas Activity Monitor Providing Alarm & Termination of Gas Decay Tank Releases (VRS-1505)
R(2)
Q(5)
D.
C.
COOK - UNIT 1 3/4 3-66 Amendment No.
TABLE 4.3-9 (Cont)
Instrument Instrument
<)
CHANNEL CHANNEL SOURCE CHANNEL FUNCTIONAL CHECK
~CHEC CALIBRATION TEST
- 6. Gland Seal Exhaust
- a. Noble Gas Activity (SRA-1805)
- b. System Effluent Flow Rate (SFR-201, 1-HR-054, SRA-1810)
D**
Dx*
NA R(2)
Q(1)
At all times
~*
During release via this pathway
~** During waste gas holdup system operation (treatment for primary system offgases)
- These surveillances are not required during the 160-day period in which this monitor is being replaced.
D.
C.
COOK - UNIT 1 3/4 3-67 Amendment No.
TABLE 3.3-13 Radioactive Gaseous Effluent Monitorin Instrumentation Instrument Instrument =l 1.
Waste Gas Holdup System Explosive Gas Monitoring System
Minimum Channels
~Oerable (1)
(2)
A licabilit
~ClZOW 30 29 2.
Condenser Evacuation System a.
Noble Gas Activity Monitor (SRA-2905) b.
Flow Rate Monitor (SFR-401)
(2-MR-054 and/or SRA-2910) 3.
Unit Vent, Auxiliary Building Ventilation System a.
Noble Gas Activity Monitor (VRS-2505)
- b. Iodine Sampler Cartridge for VRS-2503
- c. Particulate Sampler Filter for VRS-2501
- d. Effluent System Flow Rate Measuring Device (VFR-315)
(2-MR-054 and/or VRS-2510) e.
Sampler Flow Rate Measuring Device (VFS-2521)
(1)
(1)
(1)
~(1) 28 27 27 28 32 32 27 27 27 4.
Containment Purge Svstem a.
Aux. Building Vent.
System Noble Gas Acti:
Monitor (VRS-2505)
- b. Aux. Building Vent.
System Particulate Sampler for VRS-2501 5.
Waste Gas Holdup S;stem a.
Noble Gas Activi:y Monitor Providing Alarm and Termi..ation of Gas Decay Tank Releases (VRS-2505) 31 32 33 6.
Gland Seal Exhaust a.
Noble Gas Activity Monitor (SRA-2805) b.
Flow Rate Monitor (SFR-201)
(2-MR-054 and/or SRA 2810)
~
D.
C.
COOK - UNIT 2 (1)
(1)
(1) 3/4 3-59 Amendment No.
28 27 27
TABLE 3.3-13 (Cont.)
At all times
~*
During waste gas holdup system operation (treatment for primary system gases)
~***Duringreleases via this pathway.
1For purge purposes
- only, see Technical Specifications 3.3.3.10, Table 3.3-13 and Table 4.3-9 (Items 3.a, 5.a in both tables) for non-purging requirements associated with this instrument.
2For gas decay tank releases only, see Item 3 (Unit Vent, Auxiliary Building Ventilation System) for additional requirements.
3The waste gas holdup system explosive gas monitoring system may be inoperable for up to 160 days on a one-time basis for the purpose of replacing one hydrogen and one oxygen monitor.
During this time grab samples for both hydrogen and oxygen are to be taken and analyzed every 12 bourse'OOK NUCLEAR PLANT - UNIT 2 3/4 3-60 AMENDMENT NO.
TABLE 4.3-9 adioactive Gaseous Effluent Monitorin Instrume tat o
Surveillance Re uirements Instrument Instrument
~
CHANNEL CHANNEL SOURCE CHANNEL FUNCTIONAL CHECK CHECK CALIBRATION TEST 1.
Waste Gas Holdup System Explosive Gas Monitoring System
'. Hydrogen+***
Monitor (QC-31)
- b. Oxygen+***
Monitor (QC-31) c.
Oxygen Monitor (Alt., QC-370)
NA NA Q(3)
Q(4)
Q(4) 2.
Condenser Evacuation System a.
Noble Gas Activity Monitor (SRA-2905) b.
System Effluent Flow Rate (SFR-401, 2-MR-054, SRA-2910)
D**
NA R(2)
Q(1)
D*
W>
Wx
- 3. Auxiliary Building Ventilation System a.
Noble Gas Activity Monitor (VRS-2505)
- b. Iodine Sampler (For VRS-2503)
- c. Particulate Sampler (For VRS-2501) d.
System Effluent Flow D*
Rate Measurement Device (VFR-315, 2-MR-054, VRS-2510) e.
Sampler Flow Rate D*
Measurement Device (VFS-2521)
NA NA NA R(2)
NA NA Q(1)
NA NA
- 4. Containment Purge System a.
Aux. Building Vent.
System Noble Gas Activity Monitor (VRS-2505)
- b. Aux. Building Vent.
System Particulate Sampler (For VRS-2501) 5.
Waste Gas Holdup System a.
Noble Gas Activity Monitor Providing Alarm & Termination of Gas Decay Tank Releases (VRS-2505)
Dx*
NA R(2)
NA R(2)
Q(1)
NA Q(5)
D.
C.
COOK - UNIT 2 3/4 3-62 Amendment No.
TABLE 4.3-9 (Cont)
Instrument Instrument
=>
CHANNEL CHECK CHANNEL SOURCE CHANNEL FUNCTIONAL
~CHEC CALIBRATION TEST
- 6. Gland Seal Exhaust a.
Noble Gas Activity (SRA-2&05) b.
System Effluent Flow Rate (SFR-201, 2-MR-054, SRA-2810)
D**
R(2)
Q(l)
At all times T'c*
During release via this pathway
~** During waste gas holdup system operation (treatment for primary system offgases)
~***These surveillances are not required during the 160-day period in which this monitor is being replaced.
D.
C.
COOK
- UNIT 2 3/4 3-63 Amendment No.