Responds to Generic Ltr 88-03, Resolution of Generic Safety Issue 93, `Steam Binding of Auxiliary Feedwater Pumps.' Confirmation That Procedures in Ltr in Place Provided.Ref to Ltr to Be Incorporated in Next Update of Procedures
ML17326B389
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/21/1988
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Murley T
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
REF-GTECI-093, REF-GTECI-NI, TASK-093, TASK-93, TASK-OR AEP:NRC:1047, GL-88-03, GL-88-3, TAC-M67230, TAC-M67231, NUDOCS 8806060134
Download: ML17326B389 (7)


Text

PCCEIERATED DIAIBUTION DEMONSTPZION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) p ACCESSION NBR:8806060134 DOC.DATE: 88/05/21 NOTARIZED- YES DOCKET,-,g FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana & 05000315 "

50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana & 05000316 AUTH. NAME AUTHOR AFFILIATION ALEXICH,M.P. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E. Document Control Branch (Document Control Desk) to Genric Ltr 88-03, "Resolution of Generic Safety l

SUBJECT:

Responds Issue 93,Steam Binding of Auxiliary Feedwater Pumps."

DISTRIBUTION CODE: A063D COPIES RECEIVED:LTR 1 ENCL SIZE: 9 Pum I

NOTES:

)

'ECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME ENCL'TTR PD3-1 LA 1 0 '

PD3-1 PD 1 1 STANG,J 1 1 A INTERNAL: ARM/DAF/LFMB 0 NRR OLSHAN,L 1 1 NRR/DEST/PSB 8D 1 1 NRR/DEST/RSB 8E 1 1 D NRR/DOEA 11-E-4 1 1 -ABSTRACT 1 1 OGC 15-B-18 1 0 REG F 01 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 R'

I, 8

A TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 11

lg Indiana Michigan Power Company P.O. Box 16631 Coiumbus, OH 43216 AEP:NRC:1047 TAC No. M67230/M67231 Donald C. Cook Nuclear Plant Units 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 RESPONSE TO NRC GENERIC LETTER 88-03; RESOLUTION OF GENERIC SAFETY ISSUE 93, "STEAM BINDING OF AUXILIARYFEEDWATER PUMPS" U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Attn: T. E. Murley May 31, 1988

Dear Dr. Murley:

This letter responds to NRC Generic Letter 88-03, "Resolution of Generic Safety Issue 93, Steam Binding of Auxiliary Feedwater Pumps." The subject generic letter requests a letter of confirmation indicating that. the procedures discussed in the generic letter are in place and will be maintained.

The Operations Department is required by procedures 1-OHP 4030.001.001 and 2-OHP 4030.001.001 to perform a shiftly (every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />) check on the auxiliary feedwater (AFW) lines to verify the AFW line temperature is ambient. The AFW lines are checked at the pump discharges in the AFW pump corridor and at the AFW regulating valves in the auxiliary building.

When AFW directed to a steam generator is stopped and the reactor coolant system temperature is increasing, procedures require the Operations Department to check the AFW line temperature 30 minutes and 90 minutes after stopping the AFW pump. Procedures that require this check are 1-OHP 4021.056.002, 2-OHP 4021.056.002, 1-OHP 4030.STP.017T, 2-OHP 4030.STP.017T, 1-0HP4030.STP.017R, 2-OHP 4030.STP.017R, and 1-OHP 4021.001.006.

Operations procedures 1-OHP 4022.056.001 and 2-0HP4022.056.001, "Steam Binding in Auxiliary Feed Pumps" provide guidance for recognizing steam binding and for restoring the AFW pump to operable status if steam binding were to occur. Reference to this generic letter will be incorporated into the above procedures in the next biennial review to assure that the procedures will be SS060601$ 4 SS0531 PDR 4DOCK 05000315 P DCD

Dr. T. E. Murley AEP:NRC:1047 maintained.

Per the NRC's request, we have estimated the staff time required to research this information and to make the changes to procedures. We estimate that this will require 90 man hours.

Staff time required to prepare this response is estimated to be 4 man hours.

Sincerely, M. . exich Vice President MPA/eh cc: D. H. Williams, Jr.

W. G. Smith, Jr. - Bridgman R. C. Callen G. Bruchmann G. Charnoff NRC Resident Inspector - Bridgman A. B. Davis - Region III

~~

COUNTY OF FRANKLIN Milton P. Alexich, being duly sworn, deposes and says that he is the Vice President of licensee Indiana Michigan Power Company, that he has read the forgoing Response to NRC Generic Letter 88-03, "Resolution of Generic Safety Issue 93, Steam Binding of Auxiliary Feedwater Pumps," and knows the contents thereof; and that said contents are true to the best

'98 of his knowledge and belief.

Subscribed and sworn to before me this day ot 35 bifiioilh A.

NOTAKY Ai"I'LEGFI~iH pug i)