ML17326B389
| ML17326B389 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 05/21/1988 |
| From: | Alexich M INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | Murley T NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| REF-GTECI-093, REF-GTECI-NI, TASK-093, TASK-93, TASK-OR AEP:NRC:1047, GL-88-03, GL-88-3, TAC-M67230, TAC-M67231, NUDOCS 8806060134 | |
| Download: ML17326B389 (7) | |
Text
PCCEIERATED DIAIBUTION DEMONSTPZION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) p ACCESSION NBR:8806060134 DOC.DATE: 88/05/21 NOTARIZED-YES DOCKET,-,g FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana 05000315 50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana 05000316 AUTH.NAME AUTHOR AFFILIATION ALEXICH,M.P.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E.
Document Control Branch (Document Control Desk)
SUBJECT:
Responds to Genric Ltr 88-03, "Resolution of Generic Safety Issue 93,Steam Binding of Auxiliary Feedwater Pumps."
DISTRIBUTION CODE:
A063D COPIES RECEIVED:LTR 1 ENCLl SIZE: 9 I
Pum NOTES:
'ECIPIENT ID CODE/NAME PD3-1 LA STANG,J INTERNAL: ARM/DAF/LFMB NRR/DEST/PSB 8D NRR/DOEA 11-E-4 OGC 15-B-18 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1
0 1
1 0
1 1
1 1
1 0
1 1
1 1
RECIPIENT ID CODE/NAME PD3-1 PD NRR OLSHAN,L NRR/DEST/RSB 8E
-ABSTRACT REG F 01 NRC PDR
)
COPIES
'TTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 A
D R'
I, 8
A TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 11
lg
Indiana Michigan Power Company P.O. Box 16631 Coiumbus, OH 43216 AEP:NRC:1047 TAC No. M67230/M67231 Donald C.
Cook Nuclear Plant Units 1 and 2
Docket Nos.
50-315 and 50-316 License Nos.
RESPONSE
TO NRC GENERIC LETTER 88-03; RESOLUTION OF GENERIC SAFETY ISSUE 93, "STEAM BINDING OF AUXILIARYFEEDWATER PUMPS" U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 Attn:
T.
E. Murley May 31, 1988
Dear Dr. Murley:
This letter responds to NRC Generic Letter 88-03, "Resolution of Generic Safety Issue 93, Steam Binding of Auxiliary Feedwater Pumps."
The subject generic letter requests a letter of confirmation indicating that. the procedures discussed in the generic letter are in place and will be maintained.
The Operations Department is required by procedures 1-OHP 4030.001.001 and 2-OHP 4030.001.001 to perform a shiftly (every 8
hours) check on the auxiliary feedwater (AFW) lines to verify the AFW line temperature is ambient.
The AFW lines are checked at the pump discharges in the AFW pump corridor and at the AFW regulating valves in the auxiliary building.
When AFW directed to a steam generator is stopped and the reactor coolant system temperature is increasing, procedures require the Operations Department to check the AFW line temperature 30 minutes and 90 minutes after stopping the AFW pump.
Procedures that require this check are 1-OHP 4021.056.002, 2-OHP 4021.056.002, 1-OHP 4030.STP.017T, 2-OHP 4030.STP.017T, 1-0HP4030.STP.017R, 2-OHP 4030.STP.017R, and 1-OHP 4021.001.006.
Operations procedures 1-OHP 4022.056.001 and 2-0HP4022.056.001, "Steam Binding in Auxiliary Feed Pumps" provide guidance for recognizing steam binding and for restoring the AFW pump to operable status if steam binding were to occur.
Reference to this generic letter will be incorporated into the above procedures in the next biennial review to assure that the procedures will be SS060601$ 4 PDR 4DOCK P
SS0531 05000315 DCD
Dr. T.
E. Murley AEP:NRC:1047 maintained.
Per the NRC's request, we have estimated the staff time required to research this information and to make the changes to procedures.
We estimate that this will require 90 man hours.
Staff time required to prepare this response is estimated to be 4 man hours.
Sincerely, M.
exich Vice President MPA/eh cc:
D. H. Williams, Jr.
W.
G. Smith, Jr.
- Bridgman R.
C. Callen G.
Bruchmann G. Charnoff NRC Resident Inspector
- Bridgman A. B. Davis
- Region III
~~
COUNTY OF FRANKLIN Milton P. Alexich, being duly sworn, deposes and says that he is the Vice President of licensee Indiana Michigan Power
- Company, that he has read the forgoing Response to NRC Generic Letter 88-03, "Resolution of Generic Safety Issue 93, Steam Binding of Auxiliary Feedwater Pumps,"
and knows the contents thereof; and that said contents are true to the best of his knowledge and belief.
Subscribed and sworn to before me this day ot'98 4
I NOTAKY bifiioilh A. Ai"I'LEGFI~iH NOIARY PUBI.IC-STALE OF OHIO IiIY COMMISSION EXPIRES JAN. 16, 1990 35 pug i)
gilt> l4'I>i ply