ML17326A935

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Verify Operability of Fire Dampers Covered by Tech Spec 3/4.7.10
ML17326A935
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/11/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML17326A936 List:
References
NUDOCS 8203170313
Download: ML17326A935 (2)


Text

SAR 12 1S8Z Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Electric Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering 2 Broadway New York, NY 10004 inc 5

~~~ yyygg Gentlemen:

Thank you for your letter dated March 2, 1982, informing us of the steps you are taking to verify the operability of fire dampers which are covered by Technical Specification 3/4.7.10.

We will examine this matter during a subsequent inspection.

Your cooperation with us is appreciated.

Sincerely, "PrjgfOaf Stgned by C,E, gyle/gu+'<'.

E. Norelius, Director Division of Engineering and Technical Programs cc:

W.

G. Smith, Jr., Plant Manager cc w/ltr dtd 3/2/82:

DMB/Document Control Desk (RIDS)

Resident Inspector, RIII Ronald Callen, Michigan

.Public Service Commission RI I Grobe/so 3/8/82 RADII en4ez p q/8z RIII W

i ms Ha es RIII RIII Lit e

ius

)((OII 8203170313 820311 PDR ADOCK 050003i5 8

, PDR M/iy

-.~~,e~,~,t rq (Q'gii r~$

'E y