ML17326A722

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-315/80-08 & 50-316/80-07 on 800401-0615 & Notice of Violation
ML17326A722
Person / Time
Site: Cook  
Issue date: 07/10/1980
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO.
Shared Package
ML17326A723 List:
References
NUDOCS 8008260722
Download: ML17326A722 (3)


See also: IR 05000315/1980008

Text

~P,S RE0Ij

c~

"o

+

Cy

C0

<<+*<<>>

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

799 ROOSEVELT ROAD

GLEN ELLYN, ILLINOIS60137

SUL ~0

88O

Docket No. 50-315

Docket No. 50-316

American Electric Power Service

Corporation

'ndiana

and Michigan Power

Company

ATTN:

Mr. John

ED Dolan

Vice Chairman

Engineering

2 Broadway

New York, NY

10004

Gentlemen:

This refers to the routine i'nspection

conducted

by Messrs.

R. E. Masse

and N. E. DuBry of this office on April 1,

1980 to June

15,

1980, of

activities at Donald C.

Cook Nuclear Plant authorized

by NRC Operating

Licenses

DPR-58 and DPR-74 and to the discussion of our find'ings with

Mr. Shaller

and others of your staff at the conclusion of the

inspection.'he

enclosed

copy of our inspection report identifies areas

examined

during the inspection.

Within these

areas,

the inspection consisted

of a

selective

examination of procedures

and representative

records,

observa-

tions,

and interviews with

personnel.'uring

this inspection,

certain of your activities appeared

to be in non-

compliance with NRC requirements,

as described in the enclosed

Appendix

A.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's "Rules of Practice;" Part 2, Title 10,

Code of Federal Regula-

tions.

Section 2.201 requires

you to subm'it to this office within twenty

days of your receipt of this notice

a written statement

or explanation in

reply, including for each item of noncompliance:

(1) corrective action

taken

and the results

achieved;

(2) corrective action to be taken to

avoid further noncompliance;

and (3) the date

when full compliance will

be achieved.

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part

2, Title 10,

Code of Federal Regulations,

a copy of this letter, the

enclosures,

and your response

to this letter will be placed in the NRC's

Public Document

Room, except

as follows. If the enclosures

contain

information that you or your contractors believe to be proprietary,

you

f)Jl~.>,~pygmy

American Electric Power Service

Corporation

Indiana

and Michigan Power

Company

'JUL 10 $

80'ust

apply in writing to this office, within twenty days of your receipt

of this letter, to withhold such information from public disclosure.

The

application must include

a full statement

of the reasons

for which the

information is considered proprietary,

and should be prepared

so that

proprietary information identified in the application is contained in an

enclosure to the application.

We will gladly discuss

any questions

you have concerning this inspection.

Sincerely

R. F. Heishman,

Chief

Reactor Operations

and

Nuclear Support Branch

Enclosures:

l.

Appendix A, Notice of

Violation

2.

IE Inspection Report

No. 50-315/80-08

and

No. 50-316/80-07

cc w/encls:

Mr. D. V. Shaller, Plant

Manager

Central Files

Reproduction Unit NRC 20b

PDR

Local

PDR

NSIC

TIC

Ronald Callen, Michigan Public

'ervice

Commission

RIII

RIII

RII

Masse/rl

P/2/80

Boyd

Hei hman