ML17326A559

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 80-04, Analysis of PWR Main Steam Line Break W/Continued Feedwater Addition. Written Response Required
ML17326A559
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/08/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
INDIANA MICHIGAN POWER CO.
References
NUDOCS 8003110131
Download: ML17326A559 (1)


Text

Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:

The enclosed IE Bulletin No. 80-04, is forwarded for action.

A written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely, James G. Keppler Director

Enclosure:

IE Bulletin No. 80-04 cc w/encl:

Mr. D. V. Shaller, Plant Manager Central Files

Director, NRR/DPM
Director, NRR/DOR PDR Iocal PDR NSIC TIC Ronald Callen, Michigan Public Service Commission RIII

.Hei%man/pd 2/8/80 RII Ke pier

~~~X ZO