Dockets Nos.
50-315 and 50-316 J une 16<
1988 Mr. Milton P. Alexich, Vice President Indiana Michigan Power Company c/o American Electric Power Services Corporation 1 Riverside Plaza
- Columbus, Ohio 43216
Dear Mr. Alexich:
SUBJECT:
INSTALLATION OF CARPET IN THE CONTROL ROOMS (TACS NOS.
67996/67997)
By letter dated May 30, 1986, the Indiana Michigan Power Company (IMPC) informed the staff that carpeting had been installed in both control rooms as a result of human factors concerns.
IMPC indicated that the carpeting installed had a higher flame spread rating than permitted by NRC guidelines and requested the staff to review and approve the installation of the carpeting in the control rooms.
Enclosed is the staff evaluation.
Based on our evaluation, the staff concludes that the installation of the carpeting in the Unit 1 and Unit 2 control rooms is acceptable.
Sincerely, QrjjT5aTÃgnfd.by John F. Stang, Project Manager Project Directorate III-1 Division of Reactor Projects " III, IV, V 8 Special Projects
Enclosure:
Safety Evaluation cc w/enclosure:
See next page DISTRIBUTION
~IETFIIE '.
NRC 8
LOCAL PDRs PD31 GRAY FILE GHOLAHAN RINGRAM JSTANG OGC EJORDAN JPARTLOM ACRS (10)
P/
~1 (p)<<g
/88 D/P R
/P'8 880624012k 880hih P
t
~
~
1 1
g gAg ASCII+
+0 Cy UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 June 16'988 Dockets Nos.
50-315 and 50-316 Mr. Milton P. Alexich, Vice President Indiana Michigan Power Company c/o American Electric Power Services Corporation 1 Riverside Plaza
- Columbus, Ohi o 43216
Dear Mr. Alexich:
SUBJECT:
INSTALLATION OF CARPET IN THE CONTROL ROOMS (TACS NOS. 67996/67997)
By letter dated May 30, 1986, the Indiana Michigan Power Company (IMPC) informed the staff that carpeting had been installed in both control rooms as a result of human factors concerns.
IMPC indicated that the carpeting installed had a higher flame spread rating than permitted by NRC guidelines and requested the staff to review and approve the installation of the carpeting in the control rooms.
Enclosed is the staff evaluation.
Based on our evaluation, the staff concludes that the installation of the carpeting in the Unit 1 and Unit 2 control rooms is acceptable.
Sincerely,
Enclosure:
Satety Evaluation cc w/enclosure:
See next page ohn F. Stan Project Manager Project Directorate III-1 Division oi Reactor Projects - III, IV, V 8 Special Projects
Mr. Milton Alexich Indiana Michigan Power Company Donald C.
Cook Nuclear Plant CC:
Regional Administrator, Region III U.S.
Nuclear Regulatory Commission 799 Roosevelt Road Glen El lyn, Illinois 60137 Attorney General Department of Attorney General 525 West Ottawa Street
- Lansing, Michigan 48913 Township Supervisor Lake Township Hall Post Office Box 818 Bridgeman, Michigan 49106 W.
G. Smith, Jr., Plant Manager Donald C.
Cook Nuclear Plant Post Office Box 458 Bridgman, Michigan 49106 U.S. Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensvi 1 1 e, Michi gan 49127 Gerald Charnoff, Esquire Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.
Washington, DC 20037 Mayor, City of Bridgeman Post Office Box 366 Bridgeman, Michigan 49106 Special Assistant to the Governor Room 1 - State Capitol
- Lansing, Michigan 48909 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health Department of Public Health 3500 N.
Logan Street Post Office Box 30035 Lansing, Michigan 48909 Mr. S.
Brewer American Electric Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43216