Requests Confirmation That Testing Program for Sealing One End of Conduit Will Be Completed Sooner than Anticipated.Nrc Should Be Notified When Sealing of Appropriate Conduits Completed
ML17324B066
Person / Time
Site: Cook  
Issue date: 09/24/1986
From: Youngblood B
Office of Nuclear Reactor Regulation
To: Dolan J
AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
References
NUDOCS 8609290325
Download: ML17324B066 (4)


Text

~ocket Nos.:

50-315 and 50-316 Mr. John Dolan, Vice President Indiana and Michigan Electric Company c/o American Electric Power Service Corporation 1 Riverside Plaza

Columbus, Ohio 43216

Dear Mr. Dolan:

24 SEP 1985 By letter dated September 5, 1986, the Indiana and Michigan Electric Company provided a schedule for the performance of conduit sealing and a study and test program on conduit sealing for the Donald C.

Cook Nuclear Plant (reference AEP:NRC 0692AS).

We understand that the testing program is a utility spon-sored effort to determine the need to internally seal conduits to maintain fire barriers and the March 1987 completion of that effort may be a more realistic schedule.

In our review of the September 5,

1986 letter, we determined some clarification of proposed actions may be in order.

It is our understanding that the walkdown has been completed and that one end of the identified conduits is being sealed.

The sealing of one end is not dependent upon the utility sponsored test program or test program schedule.

The July 1987 schedule for D.C.

Cook to complete conduit sealing relates to the possible need to seal both ends of conduits, and therefore, the sealing of one end of conduits should be completed much sooner.

If this is not the intent of your program or if our understanding presented above is incorrect, please let us know.

It is also requested that you advise us when the sealing of the appropriate conduits on one end is completed.

Sincerely,

/sl cc:

See next page DISTRIBUTION:

f~~ L 1

PDR NRC PDR PWR¹4 Reading MDuncan BJYoungblood Reading OGC EJordan BGrimes JPartlow NThompson ACRS(10)

B.J.

Youngblood, Director PWR Project Directorate ¹4 Division of PWR Licensing-A PWR¹ /

R-A DWigginton/rad 09/i P/86 PW 4 DPWR-A an 09/1

/86 R-A/PSB JShapaker 09/i /86 PWR44/

PWR-A BJYoungblood 09/p't/86 86092'9P0325 860924 PDR

.ADOCK 050003l5 P

PDR

V

<)"

,II f

l1 I II

'l s

~

Ih

'l

,'4s

~

~

II

/

1

Mr.-John Dolan Indiana and Michigan Electric Company Donald C.

Cook Nuclear Plant CC:

Mr. M. P. Alexich Vice President Nuclear Operations American Electric Power Service Corporation 1 Riverside Plaza

Columbus, Ohio

,43215 Attorney General Department of Attorney General 525 West Ottawa Street Lansing, Michigan 48913 Township Supervisor Lake Township Hall Bost Office Box 818 Bfidgman, Michigan 49106 W.

G. Smith, Jr., Plant Manager Donald C.

Cook Nuclear Plant Post Office Box 458 Bridgman, Michigan 49106

'.S.

Nuclear Regulatory Commission Resident Inspectors Office

-7700 Red Arrow Highway Stevensville, Michigan 49127 Gerald Charnoff, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.

Washington, DC 20036 Mayor, City of Bridgeman Post Office Box 366 Bridgman, Michigan 49106 Special Assistant to the Governor Room 1 - State Capitol Lansing, Michigan 48909 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health Department of Public Health 3500 N. Logan Street Post Office Box 30035 Lansing,'ichigan 48909 The Honorable John E. Grotberg United States House of Representatives Washington, DC 20515 Regional Administrator, Region

. III U.S. Nuclear Regulatory Coranission 799 Roosevelt Road Glen Ellyn, Illinois 60137 J. Feinstein American Electric Power Service Corporation 1 Riverside Plaza