ML17324A943

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-315/86-19 & 50-316/86-19 on 860421-0502 & 0512-16 & Notice of Violation.No Reply to Violation in Item 4 Required
ML17324A943
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/12/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML17324A944 List:
References
NUDOCS 8606180313
Download: ML17324A943 (2)


See also: IR 05000315/1986019

Text

JUN 12 1986

Docket No. 50-315

Docket No. 50-316

American Electric Power Service

Corporation

Indiana

and Michigan Electric Company

ATTN:

Mr. John

E. Dolan

Vice Chairman

Engineering

and Construction

1 Riverside

Plaza

Columbus,

OH

43216

Gentlemen:

This refers to the safety inspection

conducted

by Messrs.

H. A. Walker and

T.

E. Vandel of this office on April 21-May 2 and

May 12-16,

1986, of

activities at

D.

C. Cook, Units

1 and

2 authorized

by

NRC Operating

Licenses

No.

DPR-58 and No.

DPR-74 and to the discussion of our findings with

Mr.

W.

G. Smith, Jr

and others at the conclusion of the inspection.

The enclosed

copy of our inspection report identifies areas

examined during

the inspection.

Within these

areas,

the inspection

consisted

of a selective

examination of procedures

and representative

records,

observations,

and

interviews with personnel.

During this inspection,

certain of your activities were in violation of NRC

requirements,

as described

in the enclosed

Notice.

With respect

to Item 4,

the inspection

showed that action

had

been

taken to correct the identified

violation and to prevent its recurrence.

Our understanding

of your corrective

actions are described

in Paragraph

3.b.(5) of the enclosed

inspection report.

Consequently,

no reply to this violation is required,

and

we have

no further

questions

regarding this matter.

A written response

is required for the

remaining three items.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of

this letter,

the enclosures,

and your response

to this letter will be placed

in the

NRC Public Document'oom.

The responses

directed

by this letter and the accompanying

Notice are not

subject to the clearance

procedures

of the Office of Management

and Budget

as

required

by the Paperwork Reduction Act of 1980,

PL 96-511.

8bOb180313

SbOb12

PDR

ADOCK 05000315

6

PDR

American Electric Power Service

Corporation

JUN 12 5M

We will gladly discuss

any questions

you have concerning this inspection.

Enclosures:

1.

Notice of Yiolation

2.

Inspection

Reports

No. 50-315/86019(DRS);

No. 50-316/86019(DRS)

cc w/enclosures:

W.

G. Smith, Jr., Plant Manager

DCS/RSB (RIDS)

Licensing

Fee

Management

Branch

Resident

Inspector, RIII

Ronald Callen, Michigan

Public Service

Commission

EIS Coordinator,

USEPA

Region

5 Office

Nuclear Facilities

and

Environmental

Monitoring

Section

Sincerely,

6 b

8. J. Harrison

Qrlg~n8

Soigne

J

J

Harry son

Chief

Engineering

Branch

,

z

Wal er/mj

Van el

Mu ett

r. />

Hawkins

RII

R~

urgess

Harrison

~(i~