Submits Tentative List of Commitments to Be Extended from 851231 Until End of Refueling Outage,Scheduled to Begin in Feb 1986,per Discussion W/Nrc.Changes in Documentation Requested to Continue Operation Until Outage
ML17321A979
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 11/27/1985
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737 AEP:NRC:0964, AEP:NRC:964, NUDOCS 8512060190
Download: ML17321A979 (6)


Text

REQULATO)

INFORNATION DISTRIBUTION TEN (BIDS )

ACCESSION NBR: 8522060190 DOC. DATE: 85/11/27 NOTARIZED:

NO DOCKET 0 FACIL:50-316 Donald C.

Cook Nuclear Po))jer Plant> Unit 2.

Indiana 5

05000316 AUTH. NANE AUTHOR AFFILIATION ALEXICHiI'1. P.

Indiana 5 Nichigan Electric Co.

RECIP. NANE RECIPIENT AFFILIATION DENTON> H. R.

Office of Nuclear Reactor Regulati on. Director (p ost 851125

SUBJECT:

Submits tenititive list of commitments to be extended from 8512310 unit) end of refueling outagei scheduled to begin in Feb 1986> per discussion w/NRC Changes in documentation requested to continue operation until outage.

DISTRIBUTION CODE:

A001D COPIES RECEIVED: LTR ENCL SIZE:

TITLE:

OR Submittal:

General Distribution NOTES OL: 12/23//2 05000316 RECIPIENT ID CODE/NANE PWR-A PD4 PD 01 INTERNAL: ACRS 09 ELD/HDS3 NRR BWR PD1 NRR PWR-B EB NRR/DSI /l'1ETB RRAB REQ FILE 04 COPIES LTTR ENCL REC IP IENT ID CODE/NANE ADN/LFNB NRR BWR EB NRR PWR-* EB NRR/DHFT/TSCB NRR/DSRO DIR NRR/ORAS RQN3 COPIES LTTR ENCL EXTER NAL 24X LPDR NSIC 03 05 EQSQ BRUSKEi S NRC PDR 02 Q

TOTAL NUBBER OF COPIES REQUIRED:

LTTR 29 ENCL 6

P

)gb W

l III H

/

J J

'Lt

INDIANA8 MICHIGAN ELECTRIC COMPANy P.O. BOX 16631 COLUMBUS, OHIO 43216 November 27, 1985 AEP:NRC:0964 Donald C. Cook Nuclear Plant Unit Nos.

1 and 2

Docket Nos.

50-315 and 50-316 License Nos.

DPR-58 and DPR-74 UNIT 2 OUTAGE-RELATED AND 1985 YEAR-END EXTENSION REQUEST Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Denton:

The D. C. Cook Unit 2 was scheduled for a refueling outage in November 1985.

With the Commission's approval (letter dated November 14, 1985) we have rescheduled the Unit 2 refueling outage for late February 1986.

As a result of that extension, there are several outage-related and 1985 year-end commitments that cannot be met.

Pursuant to discussions with your staff, the following is a tentative list of commitments which will be extended from December 31, 1985 until the end of the Unit 2 refueling outage which is currently scheduled to begin in February 1986.

This letter is to inform you of those commitments and to recgxest changes in the appropriate documentation to allow continued operation until the end of that outage.

(1)

Appendix R Items III.G.2 and III.G.3 modifications such as cross-connects between units which must be completed during a Unit 2 refueling outage.

Appendix R Item III.J will be completed two months after the restart of Unit 2.

This two-month period is recpxired so that we can determine the best location for the emergency lighting.

(2)

The Reactor Vessel Level Instrumentation System (RVLIS) will be extended.

Although we believe that it may be functional before the end of 1985, we understand that we must allow time for your staff's pre-implementation review before declaring it operable.

(3)

Implementation of upgraded EOPs in both Units 1 and 2 will be extended on both units for consistency of operation between units.

>glPPbo i~o O~gOO31b 851.127 pgg ADOGH 0 pgR p

pO

)o

r ~

l

~

,g I

U r

I U ~

U*'

l It Itlt, <<X tl U

fi hg I g 1

U C

W If u

~

I I

~

U

<<",jr) l <<

Uu

) *>>f

" h

  • h If fh I

)

I h

~

a u>>'

  • 'I

~

)II')J<<)

)hr,-h ) u

)>>'

a,>>

~ I," f V UI

>>I

  • JI L

I I', <<r h

~

II h

It r')

II I

~

)

~

u>>

Mr. Harold R. Dent AEP!NRC:0964 (4)

The Safety Parameter Display System (SPDS) will be extended on both Units 1 and 2 for consistency of operation between units.

(5)

The Technical Support Center (TSC) and the Emergency Offsite Facility (EOF) will also be dependent upon completion of the SPDS.

We will maintain the Emergency Response Facilities which have been demonstrated effective during Emergency Preparedness Exercises.

Item (2) is a NUREG-0737 1985 year-end commitment.

Items (3), (4),

and (5) are specified under Confirmatory Order dated July 12, 1985.

In addition to the above items, we have certain Technical Specification surveillances that were scheduled to be done during the refueling outage.

A letter requesting change of the surveillance intervals associated with these specifications will be transmitted to you shortly.

This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.

Very truly yours,

/

Z'. A exich ($

)gg Vice P esident

~A+)

cm cc:

John E. Dolan W. G. Smith, Jr.

Bridgman R. C. Callen G. Bruchmann G. Charnoff NRC Resident Inspector - Bridgman

p lt

'J

~J'>

N P'

y

)

il,l g