ATTACHMENT 2 TO AEP:NRC:0856N PROPOSED CHANGES TO THE DONALD C.
COOK NUCLEAR PLANT UNIT NOS.
1 AND 2 TECHNICAL SPECIFICATIONS
'I 8511120192 851104.."
PDR ADOCK 05000315 P
PDR'
gC
'I I '
CONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN ANALYZERS LIMITINGCONDITION,FOR OPERATION 3.6.4.1 Two containment hydrogen analyzers shall be OPERABLE.
APPLICABILITY:
MODES 1 and 2
ACTION:
a ~
b.
With one hydrogen analysis device inoperable, restore the inoperable analysis devi'ce to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
With both hydrogen analysis devices inoperable, restore at least one analysis device to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE RE UIREMENTS 4.6.4.1 Each hydrogen analysis device shall be demonstrated OPERABLE at least once per 92 days on a STAGGERED TEST BASIS by performing a
CHANNEL CALIBRATION using a four percent and fifteen percent nominal hydrogen gas, balance nitrogen.
D. C.
COOK - UNIT 1 3/4 6-'23 Amendment No.
CONTAINMENT SYSTEMS 3/4.6.4
.COMBUSTIBLE GAS CONTROL HYDROGEN ANALYZERS LIMITINGCONDITION FOR OPERATION 3.6.4.1 Two containment hydrogen analyzers shall be OPERABLE.
APPLICABILITY:
Modes 1 and 2.
ACTION:
a ~
With one hydrogen analysis device inoperable, restore the inoperable analysis device to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b.
With both hydrogen analysis devices inoperable, restore at least one analysis device to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY'ithin the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE RE UIREMENTS 4.6.4.1 Each hydrogen analysis device shall be demonstrated OPERABLE at least once per 92 days on a STAGGERED TEST BASIS by performing a
CHANNEL CALIBRATIONusing a four percent and fifteen percent nominal hydrogen gas, balance nitrogen.
D. C.
COOK UNIT 2 3/4 6-33 Amendment No.
1'
'I
ATTACHMENT 1 to AEP:NRC:0856N REASONS AND 10 CFR 50.92 ANALYSIS FOR CHANGES TO THE DONALD C.
COOK NUCLEAR PLANT UNIT NOS.
1 AND 2 TECHNICAL SPECIFICATIONS
I
~
J'
CONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN ANALYZERS LIMITINGCONDITION FOR OPERATION 3.6.4 '
Two containment hydrogen analyzers shall be OPERABLE-APPLICABILITY:
Modes 1 and 2.
ACTION:
a ~
With one hydrogen analysis device inoperable, restore the inoperable analysis device to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b.
With both hydrogen analysis devices inoperable, restore at least one analysis device to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE RE UIREMENTS 4.6.4.1 Each hydrogen analysis device shall be demonstrated OPERABLE at least once per 92 days on a STAGGERED TEST BASIS by performing a CHANNEL CALIBRATIONusing a four percent and fifteen percent nominal hydrogen gas, balance nitrogen.
D. C.