Forwards IE Insp Rept 50-316/81-30 on 811203.No Noncompliance Noted
ML17319B113
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/15/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO.
Shared Package
ML17319B114 List:
References
NUDOCS 8112280376
Download: ML17319B113 (4)


See also: IR 05000316/1981030

Text

OFC15

t98$

tiz

Docket No. 50-3lg

American Electric Power Service

Corporation

Indiana

and Michigan Electric Company

ATTN:

Mr, John E. Dolan

Vice Chairman

Engineering

2 Broadway

New York, NY

10004

Gentlemen:

This refers to the routine safety inspection

conducted

by Mr. D. L. Robinson

of this office on December 3,

1981, of activities at D. C.

Cook Nuclear Power

Plant, Unit 2, authorized

by NRC Operating License

No. DPR-74 and to the

discussion of our findings with Mr. B. Svensson

and others of your staff at

the conclusion of the inspection.

The enclosed

copy of our inspection report identifies areas

examined during

the inspection.

Within these

areas,

the inspection consisted

of a selective

examination of procedures

and representative

records,

observations,

and

interviews with personnel.

No items of noncompliance with NRC requirements

were identified during the

course of this inspection.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document

Room. If this report contains

any information

that you (or your contractors) believe to be exempt from disclosure

under

10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter

a written application to this office

to withhold such information. If your receipt of this letter has

been

delayed

such that less than seven

(7) days are available for your review,

please notify this office promptly so that

a new due date

may be estab-

lished.

Consistent with Section 2.790(b)(l),

any such application must

8112280376

811215(

PDR

ADOCK 05000316

G

IPDR

~/

i/j

I

American Electric Power Service

- 2-

Corporation

V

~ ~ W

~

gag y 5 199)

be accompanied

by an affidavit executed

by the owner of the information

which identifies the document or part sought to be withheld,

and which

contains

a full statement of the reasons

which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires

the statement

to address

with specificity

the considerations

listed in 10 CFR 2.790(b)(4).

The information sought

to be withheld shall be incorporated

as far as possible into a separate

part of the affidavit. If we do not hear from you in this regard within

the specified periods noted above,

a copy of this letter and the enclosed

inspection report will be placed in the Public Document

Room.

We will gladly discuss

any questions

you have concerning this inspection.

Sincerely,

~drigfna'l Sfgne8 5y e,0. 9'Ore,A~u: '

Enclosure:

Inspection

Report No. 50-315/81-30

cc w/encl:

D. V. Shaller, Plant Manager

DMB/Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service

Commission

C. E. Norelius, Director

Division of Engineering

and

Technical Inspection

RIII

RIII

goOiPson/so

$PdlFiw

12/9/81

Ha

e

P/ii/x)

R~gX

Williams

/A (g

RIII

e ius

(~ /r S~~

1