OFC15
t98$
tiz
Docket No. 50-3lg
American Electric Power Service
Corporation
and Michigan Electric Company
ATTN:
Mr, John E. Dolan
Vice Chairman
Engineering
2 Broadway
New York, NY
10004
Gentlemen:
This refers to the routine safety inspection
conducted
by Mr. D. L. Robinson
of this office on December 3,
1981, of activities at D. C.
Cook Nuclear Power
Plant, Unit 2, authorized
by NRC Operating License
No. DPR-74 and to the
discussion of our findings with Mr. B. Svensson
and others of your staff at
the conclusion of the inspection.
The enclosed
copy of our inspection report identifies areas
examined during
the inspection.
Within these
areas,
the inspection consisted
of a selective
examination of procedures
and representative
records,
observations,
and
interviews with personnel.
No items of noncompliance with NRC requirements
were identified during the
course of this inspection.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document
Room. If this report contains
any information
that you (or your contractors) believe to be exempt from disclosure
under
10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter
a written application to this office
to withhold such information. If your receipt of this letter has
been
delayed
such that less than seven
(7) days are available for your review,
please notify this office promptly so that
a new due date
may be estab-
lished.
Consistent with Section 2.790(b)(l),
any such application must
8112280376
811215(
ADOCK 05000316
G
IPDR
~/
i/j
I
American Electric Power Service
- 2-
Corporation
V
~ ~ W
~
gag y 5 199)
be accompanied
by an affidavit executed
by the owner of the information
which identifies the document or part sought to be withheld,
and which
contains
a full statement of the reasons
which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires
the statement
to address
with specificity
the considerations
listed in 10 CFR 2.790(b)(4).
The information sought
to be withheld shall be incorporated
as far as possible into a separate
part of the affidavit. If we do not hear from you in this regard within
the specified periods noted above,
a copy of this letter and the enclosed
inspection report will be placed in the Public Document
Room.
We will gladly discuss
any questions
you have concerning this inspection.
Sincerely,
~drigfna'l Sfgne8 5y e,0. 9'Ore,A~u: '
Enclosure:
Inspection
Report No. 50-315/81-30
cc w/encl:
D. V. Shaller, Plant Manager
DMB/Document Control Desk (RIDS)
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service
Commission
C. E. Norelius, Director
Division of Engineering
and
Technical Inspection
RIII
RIII
goOiPson/so
$PdlFiw
12/9/81
Ha
e
P/ii/x)
R~gX
Williams
/A (g
RIII
e ius
(~ /r S~~
1