Forwards IE Insp Repts 50-315/81-24 & 50-316/81-26 on 811001-31 & Notice of Violation
ML17319B101
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/01/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO.
Shared Package
ML17319B102 List:
References
NUDOCS 8112210385
Download: ML17319B101 (3)


See also: IR 05000315/1981024

Text

ZE HQ FILE COPg}

Docket No. 50-315

Docket No. 50-316

American Electric Power Service

Corporation

Indiana

and Michigan Power

Company

ATTN:

Mr. John

E.- Dolan

Vice Chairman

Engineering

2 Broadway

New York, NY

10004

This refers to the routine safety inspection

conducted by Messrs.

E. R.

Swanson

and N. E. DuBry of this office on October 1-31,

1981, of

activities at Donald C.

Cook Nuclear Plant, Units

1 and 2, authorized

by NRC Operating Licenses

No. DPR-58 and No. DPR-74 and to the discussion

of our findings with Mr. Shaller

and others of your staff at the conclusion

of the inspection.

The enclosed

copy of our inspection report identifies areas

examined during

the inspection.

Within these

areas,

the inspection consisted

of a selective

examination of procedures

and representative

records,

observations,

and

interviews with personnel.

During this inspection,

certain of your activities appeared

to be in non-

compliance with NRC requirements,

as specified in enclosed

Appendix A.

A

written response,

submitted under oath or affirmation, is required.

Please

include in your response

a resolution of the apparent conflict between your

policy concerning instrumentation operability and the Technical Specifica-

tion requirements

as discussed

in Paragraph

5b. of this report.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy

of this letter, the enclosures,

and your response

to this letter will be

placed in the NRC's Public Document

Room. If this report contains

any

information that you (or your contractors)

believe to be exempt from

disclosure

under

10 CFR 9 '(a),(4), it is necessary

that you (a) notify

this office by telephone within ten (10) days from the date of this letter

of your intention to file d request for withholding; and (b) submit within

twenty-five (25) days from the date of this letter

a written application

~go/

gii2pi0385

8iO~OOS~i

PDR

ADOCK 05000315

8

American Electric Power Service

- 2-

Corporation

I

kl

t

to this office to withhold such information. If your receipt of this letter

has been delayed

such that less

than seven

(7) days are available for your

review, please notify this office promptly so that

a new due date

may be

established.

Consistent with Section 2.790(b)(l),

any such application

must be accompanied

by an affadavit executed

by the owner of the informa-

tion which identifies the document or part sought to be withheld, and which

contains

a full statement

of the reasons

which are the bases for the claim

that the information should be withheld from public disclosure.

This

section further requires

the statement

to address

with specificity the con-

siderations listed in 10

CZR 2.790(b)(4).

The information sought to be

withheld shall be incorporated

as far as possible into a separate

part of

the affadavit. If we do not hear from you in this regard within the speci-

fied periods

noted above,

a copy of this letter, the enclosures,

and your

response

to this letter will be placed in the Public Document

Room.

The responses

directed by this letter and the accompanying

Notice are

not subject to the clearance

procedures

of the Office of Management

and

Budget as required by the Paperwork Reduction Act of 1980,

PL 96-511.

We will gladly discuss

any questions

you have concerning this inspection.

Sincerely,

"0 'na] signed by R.L. Spessar

R. L. Spessard,

Director

Division of Resident

and

Project Inspection

Enclosures:

l.

Appendix A, Notice

of Violation

2.

Inspection Report No.

50-315/81-24

and

No. 50-316/81-26

cc w/encls:

D. V. Shaller, Plant Manager

DMB/Document Control Desk

(RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service

Commission

ay

s jp

11/30/81

RIII

Knoq

~ ()

RI

Spe sard

Q~i

u~'-k,

li

4l

I

Y