Docket No. 50-315
Docket No. 50-316
American Electric Power Service
Corporation
and Michigan Power Company
ATTN:
Mr. John E. Dolan
Vice Chairman
Engineering
2 Broadway
New York, NY
10004
jj,ALE COpY
Gentlemen:
This refers to the routine safety inspection conducted
by Messrs.
M. A. Ring
and D.
LE Robinson of this office on June
16-19, 22-23,
1981, of activities
at D.
C. Cook, Unit 1 and 2, authorized
by NRC Operating License
No. DPR-58
and No. DPR-74 and to the discussion of our findings with Mr. D. V. Shaller
at the conclusion of the inspection.
The enclosed
copy of our inspection report identifies areas
examined during
the inspection.
Within these
areas,
the inspection consisted of a selective
examination of procedures
and representative
records,
observations,
and
interviews with personnel.
During this inspection,
certain of your activities appeared
to be in non-
compliance with NRC requirements,
as specified in enclosed
Appendix A.
A
written response,
submitted under oath or affirmation, is required.
With
regard to the unresolved
item in paragraph
7 of the inspection report,
we
are concerned with the quality of your review of the Unit 2 Cycle
3 Reload
Core.
Specifically,
we are concerned that the initial reviews of Cycle 3
Reload indicated that no unreviewed safety questions
existed
and no Tech-
nical Specification
changes
were required.
However,
subsequent
reviews,
using apparently the
same safety evaluation report
showed that Technical
Specification
changes
were required,
and these
were requested in your
letters
dated
May
1 and 7,
1981, to the NRC.
Therefore, in addition to
your response
to the items of noncompliance in Appendix A, please
provide
this office with additional information regarding the review process
of
the Unit 2 Cycle 3 Reload
as discussed in paragraph
7 of this report.
8107270144
810715
ADOCK 05000315
8
I
t,
)I
1
h
American Electric Power Service
-, 2-
Coporation
suL
r s
ASS)
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy
of this letter, the enclosures,
and your response
to this'etter will be
placed in the NRC's Public Document
Room. If the enclosures
contain any
information that you or your contractors believe to be exempt from dis-
closure under
10 CFR 9,5(a)(4), it is necessary
that you (a) notify this
office by telephone within seven
(7) days from the date of this letter of
your intention to file a request for withholding; and (b) submit within
twenty-five (25) days
from the date of this letter
a written application
to this office to withhold such information.
Section 2.790(b)(l) requires
that any such application must be accompanied
by an affidavit executed
by
the owner of the information which identifies the document or part sought
to be withheld,
and which contains
a full statement
of the reasons
on the
basis
which it is claimed that the information should be withheld from
public disclosure.
This section further requires
the statement
to address
with specificity the considerations
listed in 10 CFR 2.790(b)(4).
The
information sought to be withheld shall be incorporated
as far as possible
into a separate
part of the affidavit. If we do not hear from you in this
regard within the specified periods noted above,
a copy of this letter,
the enclosures,
and your response
to this letter will be placed in the
Public Document
Room.
We will gladly discuss
any questions
you have concerning this inspection.
Sincerely,
l
C. E. Norelius, Acting Director
Division of Engineering
and
Technical Inspection
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Report
No. 50-315/81-14;
50-316/81-18
cc w/encls:
D. V. Shaller, Plant
Manager
DMB/Document Control Desk (RIBS)
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service
Commission
RIII
Ring/jp
7/9/81
R I
Ro
~II'ayes
Ja<
w/iq/yy
Sp
ard
RIII