Forwards IE Insp Repts 50-315/81-14 & 50-316/81-18 on 810615-19 & 22-23 & Notice of Violation
ML17319A986
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/15/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO.
Shared Package
ML17319A987 List:
References
NUDOCS 8107270144
Download: ML17319A986 (3)


See also: IR 05000315/1981014

Text

Docket No. 50-315

Docket No. 50-316

American Electric Power Service

Corporation

Indiana

and Michigan Power Company

ATTN:

Mr. John E. Dolan

Vice Chairman

Engineering

2 Broadway

New York, NY

10004

jj,ALE COpY

Gentlemen:

This refers to the routine safety inspection conducted

by Messrs.

M. A. Ring

and D.

LE Robinson of this office on June

16-19, 22-23,

1981, of activities

at D.

C. Cook, Unit 1 and 2, authorized

by NRC Operating License

No. DPR-58

and No. DPR-74 and to the discussion of our findings with Mr. D. V. Shaller

at the conclusion of the inspection.

The enclosed

copy of our inspection report identifies areas

examined during

the inspection.

Within these

areas,

the inspection consisted of a selective

examination of procedures

and representative

records,

observations,

and

interviews with personnel.

During this inspection,

certain of your activities appeared

to be in non-

compliance with NRC requirements,

as specified in enclosed

Appendix A.

A

written response,

submitted under oath or affirmation, is required.

With

regard to the unresolved

item in paragraph

7 of the inspection report,

we

are concerned with the quality of your review of the Unit 2 Cycle

3 Reload

Core.

Specifically,

we are concerned that the initial reviews of Cycle 3

Reload indicated that no unreviewed safety questions

existed

and no Tech-

nical Specification

changes

were required.

However,

subsequent

reviews,

using apparently the

same safety evaluation report

showed that Technical

Specification

changes

were required,

and these

were requested in your

letters

dated

May

1 and 7,

1981, to the NRC.

Therefore, in addition to

your response

to the items of noncompliance in Appendix A, please

provide

this office with additional information regarding the review process

of

the Unit 2 Cycle 3 Reload

as discussed in paragraph

7 of this report.

8107270144

810715

PDR

ADOCK 05000315

8

PDR

I

t,

)I

1

h

American Electric Power Service

-, 2-

Coporation

suL

r s

ASS)

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy

of this letter, the enclosures,

and your response

to this'etter will be

placed in the NRC's Public Document

Room. If the enclosures

contain any

information that you or your contractors believe to be exempt from dis-

closure under

10 CFR 9,5(a)(4), it is necessary

that you (a) notify this

office by telephone within seven

(7) days from the date of this letter of

your intention to file a request for withholding; and (b) submit within

twenty-five (25) days

from the date of this letter

a written application

to this office to withhold such information.

Section 2.790(b)(l) requires

that any such application must be accompanied

by an affidavit executed

by

the owner of the information which identifies the document or part sought

to be withheld,

and which contains

a full statement

of the reasons

on the

basis

which it is claimed that the information should be withheld from

public disclosure.

This section further requires

the statement

to address

with specificity the considerations

listed in 10 CFR 2.790(b)(4).

The

information sought to be withheld shall be incorporated

as far as possible

into a separate

part of the affidavit. If we do not hear from you in this

regard within the specified periods noted above,

a copy of this letter,

the enclosures,

and your response

to this letter will be placed in the

Public Document

Room.

We will gladly discuss

any questions

you have concerning this inspection.

Sincerely,

l

C. E. Norelius, Acting Director

Division of Engineering

and

Technical Inspection

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-315/81-14;

50-316/81-18

cc w/encls:

D. V. Shaller, Plant

Manager

DMB/Document Control Desk (RIBS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service

Commission

RIII

Ring/jp

7/9/81

R I

Ro

~II'ayes

Ja<

w/iq/yy

Sp

ard

RIII